My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014609
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
0
>
2600 - Land Use Program
>
S-78-11
>
SU0014609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 12:53:50 PM
Creation date
2/3/2022 11:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014609
PE
2600
FACILITY_NAME
S-78-11
STREET_NUMBER
0
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
APN
08329010
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
HAMMER LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Provisions - CIPP (Con't) <br /> The lower portion of the pipe interior below the forms shall be hand <br /> trowelled to a smooth float finish, unless a mechanical trowelling or <br /> other device produces results satisfactory to the Engineer, is used. <br /> A slump test will be made of each truckload of concrete before place- <br /> ment and slump shall not exceed that specified herein by more than one- <br /> half inch (,") . <br /> Two (2) six (6) inch be twelve (12) inch compressive test cylinders con- <br /> forming to ASTM Designation C-31 shall be cast from each load of concrete. <br /> Each cylinder shall be marked with the line, station, date and batch ticket <br /> number. One cylinder of each pour will be tested in conformance with <br /> ASTM Designation C-39 after three (3) days or seven (7) days as deter- <br /> mined by the Engineer. The other held for additional testing if required <br /> by the Engineer. The cost of such compression tests will be borne by the <br /> Contractor. <br /> Should more than two (2) cylinders tested from any day's pour fall more <br /> than 10 percent (10%) below the minimum compressive strength specified, <br /> cores will be taken from the pipe and tested at the expense of the Contractor. <br /> If core tests indicate compressive strength more than twenty percent (200) <br /> below the specified minimum compressive strength, that portion of pipe <br /> shall be removed and replaced with precast pipe. Prior to the removal of <br /> such substandard pipe, the Contractor may elect, at his own expense, to <br /> perform a load test which shall be in conformance with ASTM Designation <br /> C-76, except that the test shall be made in place without the bottom sandbox. <br /> Acceptance of the pipe will be based upon the pipe withstanding one hundred <br /> ten percent (1100) of the calculated trench and live load without visible <br /> cracking. <br /> Obvious segregation, honeycombing or inadequate wall thickness encoun- <br /> tered during the inspection may be cause for rejection by the Engineer. <br /> Estimated quantities are intended to indicate the approximate magnitude of <br /> the work and to serve as an equitable basis for the award of the Contract. <br /> The actual work performed will be used to compute the total amount due <br /> the Contractor. <br /> The Contract unit price per lineal foot of concrete pipe shall include all labor, <br /> materials and equipment necessary 10 atr& ch, 66nf63� all ob- <br /> structions, rem a and replace all thtdi#i' necessary, place the pipe, <br /> backfill-the-tren , restore.th f( other work necessary to <br /> produce a complete and finishe siance with the Plans and Spec- <br /> ifications and he detaihdeawl' IMP Y ! <br /> h ^-.:b!ic Agency ................................ <br /> ................................... -------- ------ ....... <br /> [� (;,I tect ......... .................. <br /> -ta- <br />
The URL can be used to link to this page
Your browser does not support the video tag.