My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014609
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
0
>
2600 - Land Use Program
>
S-78-11
>
SU0014609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 12:53:50 PM
Creation date
2/3/2022 11:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014609
PE
2600
FACILITY_NAME
S-78-11
STREET_NUMBER
0
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
APN
08329010
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
HAMMER LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Provisions - CIPP (Con't) <br /> 1. By covering the exposed portion of the pipe, immediately after place- <br /> ment, with polyethlene film, or with wet burlap or other material of equal <br /> moisture. 1 <br /> 2. A backfill of moist loose soil or sand, free from particles greater than <br /> two (2) inches in diameter, shall be carefully hand placed to a depth of <br /> six (6) inches over the top of the pipe. <br /> In the event method "2" is used, a three inch (311) layer of moist initial <br /> backfill shall be spread upon the pipe as soon after placement as possible <br /> without damaging the concrete. This layer shall be increased to six (6) <br /> inches after the initial set of the concrete. If burlap is used for curing <br /> the initial backfill shall be placed immediately after the removal of the burlap. <br /> The initial backfill shall be kept moist until an additional twelve (12) inches <br /> of backfill can be placed. Backfill shall be completed as soon as pipe <br /> strength permits, in conformance with the Standard Specifications. A <br /> maximum of twelve (12) inches of loose soil may be placed over the top of <br /> the pipe until the concrete compressive strength reaches 700 psi and pipe <br /> has been in place twenty-four (24) hours or longer. <br /> Upon satisfaction of this requirement, and with permission from the <br /> Engineer, the trench may be backfilled with loose material, Compaction <br /> shall not take place until the concrete strength reaches 1000 psi and the <br /> pipe has been in place forty-eight (48) hours or longer. <br /> Only light traffic (axle load less than 6000 pounds) may be routed over <br /> the pipe when backfilled until the concrete compressive strength reaches <br /> 1400 psi, and the pipe has been in place seventy-two (72) hours or longer. <br /> The Contractor shall be responsible for correcting any damage to cast-in-place <br /> pipe caused by premature or excessice loading prior to the end of a seven (7) <br /> day curing period. <br /> The above allows loose filling of the trench to allow passage of traffic, <br /> but does not relieve the Contractor from proper compaction of the trench <br /> which may be started after seven (7) days curing period. <br /> Backfill and compaction will be in conformance with the requirements of <br /> Drawing G-2 of the Standard Specifications of San Joaquin County and Typical <br /> Trench Sectio �! erf jmprovem�nt Pl,ari 1 <br /> All pipe openi SII bei kept tightly closed for a �er3od,o>3Qiaen (7) <br /> days except where work is in,progress. <br /> Flow line elevation shall not vary more`thah-&. 0Opftj�4 minus from the <br /> design gra Co i rIcy .......--- <br /> ................................ <br /> i_j (7�✓ner ............................................ <br /> Engineer ....................... <br /> Architect .............. <br /> Other ....................:��_..... <br /> •••••••u..u.u.nw.Lwwp-w.w.un.YpenoPeo�.. ,_ ewe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.