Laserfiche WebLink
TABLE OF CONTENTS (continued) <br />2.3.4.1 Quantity and Quality of Wastewater from Project..........................................15 <br />2.3.4.2 Denitrification Estimate.................................................................................15 <br />2.3.5 Nitrate Loading Scenario........................................................................16 <br />2.3.6 Impact of Nitrate Loading to Nearby Water Sources...............................17 <br />2.4 Discussion of Nitrate Loading Results................................................................17 <br />2.4.1 Total Nitrate Impact................................................................................17 <br />2.4.2 Methods of Mitigation.............................................................................17 <br />3.0 CONCLUSIONS AND RECOMMENDATIONS..............................................................17 <br />4.0 LIMITATIONS................................................................................................................18 <br />APPENDIX A: VICINITY MAP AND SITE MAP <br />APPENDIX B: HISTORICAL INFORMATION <br />APPENDIX C: SEPTIC PERMITS <br />APPENDIX D: GROUNDWATER INFORMATION, SOIL PROFILE, GEOLOGIC INFORMATION <br />APPENDIX E: ONSITE WASTEWATER SYSTEM PERMIT, PERCOLATION TEST FORM <br />APPENDIX F: NITRATE LOADING CALCULATION, WATER BALANCE RECHARGE <br />APPENDIX G: ANALYTICAL RESULTS <br />Responsive ■ Resourceful ■ Reliable <br />