Laserfiche WebLink
Project Scope " Scope of Work " — The project scope is a general description of the project , <br /> installation timelines , procedures and should include a description of associated areas where <br /> equipment , tanks , piping , and hazardous materials storage will be located . Also include a <br /> description of operations , hazardous materials handling procedures and safety systems . A <br /> schedule indicating projected start and completion dates . <br /> Groundwater Wells — Are wells being removed ? All wells being removed or destroyed require <br /> separate permit from the Local authorities and Resources Management Division . <br /> Underground Service Alert — Plan shall include locations of all utilities . Contact Service Alert <br /> at 800 -642-2444 prior to the start of any excavation . <br /> Subsurface Contamination - Ensure subsurface is not contaminated ( If contamination is <br /> detected an additional remediation permit from the local authorizes will be required ) . <br /> Site Security — Provide for site security . <br /> Training — Training certifications for OSHA Haz-woper must be provided . <br /> Site Safety Plan - Is a plan provided which covers : <br /> o PPE — Personal protective equipment . o Health and <br /> safety officers . o Training requirements . <br /> o Monitoring — Environmental air monitoring . o Site <br /> Safety meetings . o Hazard Evaluations — Chemical , <br /> Physical and Natural . o Decontamination — <br /> Procedures for each . <br /> o Emergency response procedures — Phone numbers , <br /> site map , route to nearest hospital ( map and written <br /> directions ) . <br /> Fire Extinguisher — On site during Construction . Provide at least one 40BC - rated portable fire <br /> extinguisher onsite and readily accessible within 50 feet of work area for UST Systems . Hot <br /> work or spark-producing operations shall not be conducted if UST System previously contained <br /> flammable/combustible liquids unless UST System is decontaminated and free of hazardous <br /> vapors . <br /> Contractor' s License — A copy of contractor' s license . <br /> Certificate of Liability Insurance —A copy of workers compensation certificate of liability <br /> insurance . <br /> Business Tax Certificate — A copy of local business tax certificate . <br /> Manufacturers Installation Certifications - Copy of manufacturer(s ) certifications ) verifying <br /> contractors are trained and certified to install their equipment ( UST' s , piping , sumps , under <br /> ( 888 ) 239 -9988 SAN DIEGO LOS ANGELES PHOENIX westernpump . com <br /> Page 4 of 11 <br />