Laserfiche WebLink
dispenser containment , and monitoring systems ) . Installation contractors must be re -certified <br /> as required by the equipment manufacturers or every 3 years . <br /> ICC Certifications — At least one person to be on site must be certified by the International <br /> Code Council as a CA UST SYSTEM INSTALLER and as a CA UST <br /> SYSTEM SERVICE TECHNICIAN - Information regarding the ICC exams can be found at <br /> http : //www . iccsafe . org/certification /ust . html or 866 -422 - 3926 <br /> Electrical <br /> Electrical wiring shall be per the 2007 California Electrical Code . Contact the local Building <br /> Department for permit requirements . Forms <br /> Provide the following : • Completed Unified Program Consolidated Forms ( UPCF ) at <br /> www . unidocs . org <br /> o UPCF Facility Information - Business Activities . <br /> o UPCF Facility Information - Business Owner/Operator Identification ; o UPCF <br /> Underground Storage Tank Facility <br /> o UPCF Underground Storage Tank (one form for each tank ) ; and <br /> • UPCF Underground Storage Tank - Installation Certification of Compliance (one form for <br /> each tank ) to be submitted and signed by owner upon completion of installation . <br /> • New or revised Underground Storage Tank Monitoring Plan . <br /> • New or revised Underground Storage Tank Response Plan . <br /> • Completed Underground Storage Tank Certification of Financial Responsibility form along <br /> with any required attachments . <br /> • Copy of "AS BUILT" plans accurately showing final locations of tanks , piping , dispensers , <br /> and any changes of materials or equipment used . <br /> Design <br /> Provide the following : <br /> • Scaled Drawing - Showing the location and details of all UST ' s , piping , monitoring system , <br /> sensors , fill pipes , overfill prevention , spill containment , vent piping , pumps , sumps , <br /> anchoring , distances to the property lines , distance from buildings , distance from streets , <br /> etc . <br /> • UST System Setback Distances - UST ' s and piping shall not be less than 3 feet from any <br /> basement wall , pit , cellar or property line . <br /> ( 888 ) 239 -9988 SAN DIEGO LOS ANGELES PHOENIX westernpump . com <br /> Page 5 of 11 <br />