My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:00:04 PM
Creation date
2/10/2022 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEAK DETECTION <br /> T E C H N 0 L 0 G I E S L. LC <br /> Exclusive Providers for MDleak® and PHDIeakT"' Technologies <br /> 2765 East VVieding Rd Tucson, AZ 85715 Phone 520 . 207 . 4878 FAX: 520990 . 8965 wvm7l eakDetect. net <br /> ELD Final Tank Testing , <br /> Wet/Brine Filled Interstitial Tanks (MCleak® test method) : <br /> 1 . Important; <br /> a. LDT requires all ballast to be removed from the tanks primary 72 hours prior to LDT <br /> arrival onsite . <br /> 2 . CSI/NOV tanks interstice is required to have an elevated brine level in order to gain a 0 . 005gph <br /> test <br /> a. The brine level within the interstice is required to be elevated 72 hours before LDT <br /> arrival . <br /> b . Add brine to raise the level within the interstitial riser pipe 4-inches above the bottom of the <br /> riser or 4-inches above the top of the tank interstitial reservoir. <br /> i . Failure to increase the level 72-hours or greater before LDT arrival may indicate an <br /> inconclusive test delaying the opening of the facility. <br /> Dry Interstitial Tanks : <br /> 3 . DRY interstice tank tests (MDleak® test method) <br /> a . LDT requires all ballast to be removed from dry interstice tanks prior to LDT arrival <br /> onsite . <br /> Systems : <br /> 1 . LDT has no restrictions to the MDleak® testing Methods . <br /> 2 . LDT has several chemical markers so site contamination by a single chemical marker is not a <br /> consideration or limitation. <br /> 3 . It is best for the contactor to find the majority of the leaks using whatever method they can. Small <br /> leaks are best left to LDT crews to pinpoint than for the contractor to spend hours looking for these <br /> small leaks . <br /> 4 . Fast identification and leak location substantially reduce repair cost . <br /> General : <br /> 1 . Extraction plugs should be installed and sealed properly . <br /> 2 . A construction crew shall be onsite during the test period. This crew should be equipped to repair <br /> any portion of the system. <br /> 3 . The MDleak® method can test piping containing liquids . However, if a liquid is present additional <br /> time and cost will be incurred. <br /> Author David Rabb 5of 8 <br /> Version 210505 <br />
The URL can be used to link to this page
Your browser does not support the video tag.