My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:00:04 PM
Creation date
2/10/2022 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
anLEAK DETECTION <br /> TECHN0L0GIESLLC <br /> Exclusive Providers for MDleak® and PHDleakT" Technologies <br /> 2765 East V ieding Rd Tucson, AZ 85718 • Phone 520 . 207 . 4878 FAX: 520 . 990 . 8965 uT\a7-\17 .LeakDetect. 1-let <br /> Product Piping . <br /> 1 . The contractor shall have all shear valves plug or capped using steel not plastic fittings and <br /> connected to the piping . <br /> 2 . It is best to complete the turbine connections before the Pretest. Locating and repairing fittings <br /> within the tank sumps during the pretesting is more efficient and less confining than during the <br /> final ELD testing . <br /> Secondary Piping and Connection : <br /> 1 . MDleak® does not require special fittings to be installed by the contractor. <br /> 2 . The contractor should use standard California approved factory secondary termination fittings or <br /> boots . Termination fittings in California require test ports . Test ports shall be accessible to the LDT <br /> Technician, <br /> Vent Piping . <br /> 1 . Extraction plugs should be installed and sealed properly . <br /> 2 . Vent risers should be caped and should include test ports on each vent riser. <br /> VR Piping : <br /> 1 . Extraction plugs should be installed and sealed properly . <br /> 2 . VR piping at the UDC should also be caped or plug using steel not plastic fittings . <br /> Final ELD Test Procedure : <br /> Preparation . <br /> 1 . Before testing can begin all permits and site information must be acquired by the contractor or <br /> owner. LDT will supply all documents required as requested. <br /> 2 . The contractor must notify LDT if any component in the system was installed that is not full <br /> vacuum compatible . <br /> Setup : <br /> 1 . During the setup portion of the test a contractor is required to be present onsite . <br /> a. The contractor is required to be prepared to repair any accessible component at the facility . <br /> b . Access ports to the secondary containment are required to be installed by the contractor <br /> prior to LDT arriving at the site . <br /> c . Access to the top of the vent risers, tank sumps and UDC ' s may be required. <br /> 2 . Tanks with a vapor interstice are install ready to proceed. <br /> 3 . Tanks with a liquid interstice will be inoculated with a water soluble liquid chemical marker during <br /> the pretest phase . <br /> Author David Rabb 6of 8 <br /> Version 210505 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.