Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> H. EARTHQUAKE VULNERABILITY <br /> Identify arras of dtc fac'' that arc vulnorablc to hazardous materials releases due msciasmic LOCATIONS(e.g.,Shop,outdooriats fib) and ins ion, H2. <br /> VULNERABLE AREAS(Check all that apply): <br /> 0 1.HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS <br /> ❑ 2.PROCESS LINES AND PIPING Propane Cylinder Storage cage <br /> ❑ 3.LABORATORY <br /> ❑ 4.WASTE TREATMENT AREA <br /> identifymechanical system vulnerable to releases/ ills due to earth uake-related motion.These systems require immediate isolation and ins tion. n4 <br /> VULNERABLE SYSTEMS AND/OR EQUIPMENT(Check 2that apply): xt. LOCATIONS: <br /> 0 1.SHELVES,CABINETS AND/OR RACKS <br /> ❑ 2.TANKS AND SHUT-OFF VALVES <br /> ❑ 3.PORTABLE GAS CYLINDERS Propane Cylinders Storage Cage /Power & <br /> m 4.EMERGENCY SHUT-OFF AND/OR UTILITY VALVES 61QS <br /> ❑ 5.SPRINKLER SYSTEMS Valves <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane tank) <br /> I. EMPLOYEE TRAINING <br /> Employee paining is required for all employees and/or conhae:tors handling hazardous materials and/or hazardous wastes during normal and/or emergency operations. <br /> Most facilities will need to submit a separate Training Plan.However,your CUPA may accept this soctien as the Training Plan for some small facilities. <br /> Employee training plans tray include the following content. <br /> • Applicable laws and regulations; • Communication and alarm systems; <br /> • Emergency response plans and procedures; • Personal protective equipment; <br /> • Use and maintenance of emergency response equipment and supplies <br /> • Safety Data Sheets; <br /> Hazard commanicazioo related to health and safety; (e.g.Fire extinguishers,respirators,spill control materials); <br /> • <br /> • Methods for safe handling of hazardous substances; • Decontamination procedures; <br /> • Hazards of materials and processes(e.g.,fire,explosion,asphyxiation); • Evacuation procedures and evacuation staging locations; <br /> Hazard mitigation,prevention and abatement procedures; • Identification of facility areas,equipment,and systems vulnerable to <br /> • Coordination of emergency response actions; earthquakes and other=rural disasters- <br /> 0 Notification procedures for local emergency responders,CUPA, • OTHER(Specify): <br /> Cal OES,and onsite perseancl; <br /> Check the applicable boxes below to indicate how the employes training program is administered. <br /> u. <br /> ❑1. FORMAL CLASSROOM ❑2. VIDEOS 0 3. SAFETY MEETINGS ❑4. STUDY GUIDES/MANUALS 12 <br /> ❑5. OTHER(Specify): Emergency Reference Guide <br /> ❑6. NOT APPLICABLE SINCE FACB.CfY IIAS NO EMPLOYEES n, <br /> ❑7. CHECK IF A SEPARATE EMPLOYEE TRAINING PLAN IS USED AND UPLOADED TO CERS AS A PDF DOCUMENT In, <br /> 0 S. CHECK IF EMPLOYEE TRAINING IS COVERED BY THE ABOVE REFERENCED CONTENT AND OTHER DOCUMENTS ONSITE <br /> EMPLOYEE TRAINING FREQUENCY AND RECORDEEEPE14G TRAINING MUST BE: <br /> • Provided initially for new employees as soon as possible following the date of hire. New employees should not work in an unsupervised position that involves <br /> hazardous materials handling and/or hazardous waste management without limper training; <br /> • Provided within six months from the date of hire for new employees at a large quantity generator; <br /> • Ongoing and provided at least annually; <br /> • Amended prior to a change in process or work assignment; <br /> • Given upon modification to the Emergency Response/Contingency Plan. <br /> Large Quantity Generator Training:Large quantity generators(1,000 kg ormorc)must retain written plan and documentation of employee training which includes: <br /> •A written description of the type and amount of both initial and ongoing training that will be given to persons filling mchjob position having responsibility for hazardous <br /> waste management and/or emergency response. <br /> • The name,job title and job description for each position at the facility related to hazardous waste mu mgement. <br /> • Current employee training records must be retained until closure of the facility and former employee training records most be retained for at least three years after <br /> termination of employment. <br /> Small Quantity Generator Training: Small quantity generators (less than 1,000 kg) est include basic hazardous waste management and emergency response <br /> procedures but a written employee training plan and training records are not required In order to show that the facility has mel the small quantity generator employee <br /> training requvcmem,an employee training plan and training records may be made available. <br /> Hazardous Materials Business Plan Training:Businesses most provide initial and somal employee muning that includes the content referenced above. The training <br /> may be based on thejob position and training records must be made available for a period of at least three years. <br /> J. LIST OF ATTACHMENTS <br /> Jr. <br /> Check one of the following: <br /> ❑1. NO ATTACHMENTS ARE REQUIRED;or Ql=le;�'1'blaf's PVWM # l t� ,i. <br /> ®2. THE FOLLOWING DOCUMENTS ARE ATTACHED: <br /> Rev.03/07/17 Page 4 of 4 <br />