Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Harney Lane 76 as of September 08, 2022. <br /> Open violations from July 28, 2022 inspection <br /> Violation #208 - Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION The designated operator inspections for the following months were performed more than 30 days <br /> after the previous inspection: <br /> - Initial inspection on 5/28/2021 , next inspection performed on 10/18/2021 ( 143 days) <br /> - Initial inspection on 10/18/2021 , next inspection performed on 1 /10/2022 (84 days) <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection . <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> --------------------------------------------------------------------------- <br /> OBSERVATION The designated operator failed to check and note all required items on the visual inspection <br /> reports. The incorrect and missing information included the following from the inspection reports: <br /> -On the 3/7/2022 and 6/28/2022 inspection reports, 'NO' was answered in Section 7 but there were no items listed <br /> that would have been addressed from the previous months. <br /> REGULATION GUIDANCE: During the visual inspection, the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> ................................................ <br /> OBSERVATION Designated operator reports were not signed within the required time frame. <br /> -The 3/7/2022 designated operator report was signed by the owner/operator on 7/3/2022 . <br /> REGULATORY GUIDANCE Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> ............................................................... <br /> OBSERVATION The designated operator failed to check and note the correct test dates for the Overfill prevention <br /> testing on the designated operator inspection reports. The Overfill prevention testing date listed was 7/7/2020. The <br /> correct date for the overfill prevention testing is 6/4/2020. <br /> REGULATION GUIDANCE: During the inspection , the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ...................................... <br /> OBSERVATION The designated operator failed to document all the alarms from the attached alarm history on the <br /> Page 6 of 7 <br />