REQUIRED DOCUMENTATION
<br />I. A PROJECT CONTACT LIST WITH ALL GENERAL CONTRACTOR AND SUBCONTRACTOR CONTACTS AND
<br />PHONE NUMBERS SHALL BE SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER, ALONG WITH A
<br />DETAILED CONSTRUCTION SCHEDULE PRIOR TO STARTING THIS PROJECT.
<br />2. THE FOLLOWING DOCUMENTATION, MINIMALLY, IS REQUIRED PRIOR TO RELEASING THE FINAL 10%
<br />RETAINAGE ON THE PROJECT. THESE DOCUMENTS SHALL BE SUBMITTED IN A BOUND PROJECT
<br />CLOSE-OUT FOLDER.
<br />A. SITE INFORMATION (ADDRESS, SITE/STORE NUMBER, ETC.)
<br />B. PROJECT DESCRIPTION WITH START AND FINISH DATES, CONSTRUCTION SCHEDULE
<br />C. CONTRACTOR INFORMATION ALONG WITH SUBCONTRACTOR LIST
<br />D. JOB PROGRESS PHOTOS (SEE BELOW)
<br />E. DAILY JOB PROGRESS LOGS (NEW BUILDS ONLY)
<br />F. XERXES INSTALLATION CHECKLIST, INCLUDING DEFLECTION READINGS
<br />G. XERXES RECEIVING RECORD
<br />H. UNDERGROUND TANK INSTALLATION CHECKLIST
<br />I. PIPING MANUFACTURER'S INSTALLATION CHECKLIST
<br />J. COPIES OF ALL TEST RESULTS
<br />K. UST INFORMATION SHEET
<br />L. COPIES OF ALL PERMITS AND INSPECTIONS
<br />M. COPY OF CERTIFICATE OF OCCUPANCY (IF REQUIRED)
<br />N. COMPLETED AND SIGNED PUNCH LIST
<br />O. AS -BUILT DRAWINGS TO SCALE DEPICTING PRECISE LOCATION OF ALL COMPONENTS INSTALLED
<br />(INCLUDING PRODUCT/VAPOR LINE SIZES AND LOCATIONS, CONDUIT SIZES, LOCATION 4 MATERIAL,
<br />EXACT TANK LOCATION AND DIMENSIONS, ETC.)
<br />P. TANK CHARTS (LEAVE SECOND COPY AT STORE)
<br />Q. FINAL RELEASE OF LIEN FROM CONTRACTOR AND EACH SUBCONTRACTOR/SUPPLIER
<br />R. COPY OF CONTRACT, CHANGE ORDERS, AND WRITTEN APPROVALS FOR DEVIATIONS FROM THESE
<br />DRAWINGS.
<br />S. COPY OF SIGNED TANK DISPOSAL CERTIFICATE AND ALL WASTE MANIFESTS.
<br />T. COMPLIANCE INFORMATION FORMS
<br />U. TANK LAYOUT FORM
<br />3. CONTRACTOR SHALL MAINTAIN AND TURN OVER 2 COPIES OF AN INDEXED OPERATION AND
<br />MAINTENANCE MANUAL, CONSISTING OF BOOKLETS FOR ALL NEWLY INSTALLED EQUIPMENT. GIVE ONE
<br />COPY TO THE OWNER'S CONSTRUCTION MANAGER AND LEAVE ONE AT THE STORE. CONTRACTOR
<br />SHALL LEAVE TANK CHARTS, TANK STICK, MANWAY REMOVAL DEVICE, WATER FINDING PASTE, AND
<br />ALL KEYS AT THE STORE.
<br />4. JOB PROGRESS PHOTOS - FUEL SYSTEM INSTALLATION
<br />AT A MINIMUM, THE FOLLOWING PHOTOS ARE TO BE SUBMITTED ON S 1/2'' X 11'' PLASTIC SHEETS,
<br />LABELED WITH SCOPE OF WORK, STORE No. AND ADDRESS, IN THE BOUND PJT. CLOSE-OUT FOLDER:
<br />A. PHOTOS OF LOCATION PRIOR TO START OF CONSTRUCTION (MINIMUM 4)
<br />B. EACH OLD TANK AND OLD TANK HOLE
<br />C. OPEN TANK HOLE
<br />D. INSTALLATION OF NEW TANKS INCLUDING DEADMEN AND HOLD-DOWN STRAPS N DURING, 1 AT FINISH)
<br />E. PEA GRAVEL BACKFILL (INCLUDES TAMPING OF PEA GROVEL AT 5:00 AND -1:00 POSITIONS)
<br />(3 PHOTOS)
<br />F. INSTALLATION OF PRODUCT LINES, VENT LINES AND ELECTRICAL IN TANK HOLE
<br />G. INSTALLATION OF TANK -TOP EQUIPMENT, FILL TUBES AND SUBMERSIBLE PUMPS
<br />H. BACKFILLED TANKS JUST BEFORE CONCRETE POUR, SHOWING REBAR
<br />I. REBAR PROPERLY INSTALLED AROUND FILL AND TURBINE SUMP MANHOLES
<br />J. TANK FIELD READY TO RECEIVE CONCRETE (INCLUDES REBAR ON CHAIRS OR BRICK BATS)
<br />K. DEPTH OF NEW CONCRETE
<br />L. TANK FIELD COMPLETE (INCLUDES JOINTS, PAINTED FILL CAPS, AND VENT RISERS) (MIN. 2)
<br />M. OPEN TRENCHES
<br />N. PRODUCT PIPING IN TRENCHES (PROPERLY SPACED)
<br />O. FIELD DRESSED PIPE
<br />P. PEA GRAVEL BACKFILL IN TRENCHES (SHOW PEA GRAVEL UNDER PRODUCT LINES)
<br />Q. SHOW INSTALLATION OF DISPENSER CONTAINMENT BOXES
<br />R. PRODUCT PIPE TRENCHES READY TO RECEIVE CONCRETE (SHOW REBAR DOWELED INTO EXISTING
<br />CONCRETE, WHEN APPLICABLE)
<br />S. LOCATION OF PHOTO ELECTRIC CELL AND/ OR CONTACTOR FOR CANOPY LIGHTS AND SIGNS
<br />T. INSTALLATION OF NEW CANOPY FOOTINGS
<br />U. PICTURE OF FINISHED CANOPY
<br />V. PICTURES OF LOCATION AT THE END OF CONSTRUCTION (MINIMUM 4)
<br />CLASS LOCATIONS - MOTOR FUEL DISPENSING FACILITIES
<br />EXCERPTS FROM TABLE 514.3(5)(1) CLASS I LOCATIONS - MOTOR FUEL DISPENSING FACILITIES
<br />DISPENSER (EXCEPT OVERHEAD TYPE) (SEE ALSO CEC FIGURE 514.3)
<br />UDC (UNDER DISPENSER CONTAINMENT)
<br />DIV. 1 ENTIRE SPACE W/IN AND UNDER DISPENSER PIT OR UDC
<br />DISPENSER - OUTDOOR
<br />AREA CLASSIFICATION INSIDE THE DISPENSER ENCLOSURE IS COVERED IN UL 8l, STD.
<br />F/ POWER -OPERATED DISP. DEVICES FOR PETROL. PRODUCTS
<br />DIV. 2 W/IN 15 IN. OF DISPENSER ENCLOSURE OR THAT PORTION OF DISPENSER ENCLOSURE
<br />CONTAINING LIQUID HANDLING COMPONENTS, EXTENDING HORIZONTALLY IN ALL
<br />DIRECTIONS AND DOWN TO GRADE LEVEL DIRECTIONS AND DOWN TO GRADE LEVEL
<br />DIV. 2 UP TO 15 IN. ABOVE GRADE LEVEL, EXTENDING 20 FT. HORIZ. IN ALL DIRECTIONS FROM
<br />DISPENSER ENCLOSURE
<br />REMOTE PUMP - OUTDOOR
<br />DIV. 1 ENTIRE SPACE W/IN ANY PIT OR BOX BELOW GRADE LEVEL, ANY PART OF WHICH IS
<br />W/IN 10 FT. HORIZ. FROM ANY EDGE OF PUMP
<br />DIV. 2 W/IN 3 FT. OF ANY EDGE OF PUMP, EXTENDING HORIZONTALLY IN ALL DIRECTIONS
<br />DIV. 2 UP TO 18 IN. ABOVE GRADE LEVEL, EXTENDING 10 FT. HORIZ. IN ALL DIRECTIONS FROM
<br />ANY EDGE OF PUMP
<br />TANK, UNDERGROUND (UST)
<br />FILL OPENING
<br />DIV. 1 ENTIRE SPACE W/IN ANY PIT OR BOX BELOW GRADE LEVEL, ANY PART OF WHICH IS
<br />W/IN A DIV. 1 OR 2 CLASSIFIED LOCATION
<br />DIV. 2 UP TO 15 IN. ABOVE GRADE LEVEL, EXTENDING 5 FT. HORIZ. IN ALL DIRECTIONS FROM
<br />ANY TIGHT -FILL CONNECTION
<br />VENT (UST)
<br />W/IN 5 FT. OF OPEN END OF VENT, EXTEND'G. IN ALL DIRECTIONS
<br />DIV. 1
<br />BETWEEN 5 FT. AND 10 FT. FROM OPEN END OF VENT, EXTEND'G. IN ALL DIRECTIONS
<br />DIV. 2
<br />VAPOR PROCESSING SYSTEM - EQUIPMENT IN PROTECTIVE ENCLOSURES
<br />DIV. 2 ENTIRE SPACE W/IN ENCLOSURE
<br />VAPOR PROCESSING SYSTEM - EQUIP. NOT W/IN PROTECTIVE ENCLOSURE
<br />DIV. 2 W/IN 18 IN. OF EQUIPMENT CONTAINING FLAMMABLE VAPORS OR LIQUID, EXTENDING
<br />HORIZONTALLY IN ALL DIRECTIONS AND DOWN TO GRADE LEVEL
<br />DIV. 2 UP TO 15 IN. ABOVE GRADE LEVEL W/IN 10 FT. HORIZONTALLY OF THE VAPOR
<br />PROCESSING EQUIPMENT
<br />fzl
<br />F3
<br />_4i
<br />Northwest Pump
<br />PETROLEUM & INDUSTRIAL
<br />OWNER SUPPLIED FUEL SYSTEM EQUIPMENT
<br />Stay Updated- Fallow us online!
<br />onomr+
<br />3600 Industrial Blvd -Suite 10, Sacramento, CA 95691 916.376.0599
<br />TELEPHONE',
<br />FAQ:
<br />DATE OF QUOTATION:
<br />QUOTE NUMBER
<br />PZ')J="T
<br />FAX NUMBER
<br />02/16121
<br />1
<br />CUSTOMER I CONTACT:
<br />PROJECTILOCATION:
<br />Harpreet Singh & Varinder Pal Singh
<br />Z-ENO-ISHGST
<br />15 E Grant Line Road
<br />Edgewood Commercial Tracy
<br />Tracy, CA 95376
<br />Xerxes 25,D00.10' Double Wall FRP Tank NATO 87
<br />TERMS AND CONDITIONS OF SALE
<br />N.W. Pump is not responsible for delays in deliverydue to strikes, accidents, priority restrictions or
<br />2
<br />other conditions beyond our control or its failure or delay to order or deliver due to the purchaser's
<br />This offer to furnish equipment on the following terms
<br />failure to pay N.W.Pump any monies owed on an open job account or job basis. The prices herein
<br />and conditions expires 15 days from the above date.
<br />do not apply in the event of an underground obstruction, including but not limited to utilities and impenetrable
<br />PK3-42RTDI ESEL-33
<br />soil, is discovered after this proposal is made. In such event, Buyer is liable for all increased casts.
<br />N.W. Pump, Inc. reserves the right to
<br />Buyer may cancel by giving written notice, however, Buyer is liable for all costs incurred by
<br />adjust equipment prices to conform to
<br />N.W. Pump tothe date notice is received. Cancellations or returns are subjecl la a
<br />prices in effect at thetime of delivery
<br />minimum fifteen (15%) percent restocking charge. Payment terms are net cash on delivery,
<br />22" DW Manwaywith (3) 4" Manway Cover Fittings) (Half
<br />unless M.W. Pump has approved credit terms or otherwise specifed within. If litigation is necessary to enforce
<br />Eouloment )rices are subject to all wDlicable taxes.
<br />this agreement, the prevailing partywill be entitled to reasonable attorneys fees, court costs, and interest.
<br />Return of non -stack and special crder items are subject
<br />to restock charges er may not be returnable.
<br />Products carry only the manufacturer's warranty, if any. NWP makes no representations as to product
<br />10 g 5
<br />con liance with government re ulations, There are no expressed or implied warranties as to goods or
<br />P 9 9 P P
<br />services provided by NWP, including the implied warranty of merchantability or filness for a particular
<br />2 4" Tank Wall Fitting, half coupling DW Double Wall Collar & Sump Package for
<br />Purpose. Statements by NA representative that differ from the foregoing shall have no effect. NWP will
<br />12
<br />not be liable for direct, indirect, special or consequential damages, business interruption or loss of profts
<br />0 P Lower Clamp �5
<br />damages, sustained by Customer or any partyclaiming by, through or under Customer.
<br />H15190M
<br />Acceptance of Proposal:
<br />SALES TOTALS
<br />EQUIPMENT SUBTOTAL:
<br />The above price, specifications and conditions are satisfactory and are hereby
<br />INCOMING FREIGHT:
<br />accepted. You are authorized to supply equipment and/or labor as specified.
<br />ESTIMATED SALES TAX:'
<br />,;
<br />Pa ment ��III be made as outlined above. I understand ecce once of the
<br />Y F�
<br />=Actual sales taxma � war the customer
<br />� y,
<br />quotation does not constitute an order until credit has been approved,
<br />reeds pay the tax shown on the invoice.
<br />I understand that Northwest Pump may file a Right to Lien against
<br />TOTAL:
<br />the equipmentllabor.
<br />Pomeco Riser Spacer 16" Center to Center
<br />81
<br />1
<br />Initials
<br />1. Price excludes tank offloading, electrical, piping and installation.
<br />2. All Prices are FOB Northwest Pump warehouse except where noted differently.
<br />3. Terms: _25_% down. Tanks and dispensers balance due on completion at factory. Net 30 upon approved credit
<br />4. Terms: _50_% down on all EVRIISD systems. Non Returnable/Non Refundable
<br />5. Prices are good for 15 days from date of quotation. Exception are steel tanks which are 7 days.
<br />B. Gilbarco I Gasboy Terms: Special terms applyto the Gilbarco/Gasboy Equipment. Prices reflect a 3% cash discount. Payments
<br />must be received within 10 days of invoice. Invoices are sent upon completion of the order at the factory. 3% will be added to invoice
<br />and may be deducted if paid within 10 days. Credit card payment not applicable with these terms.
<br />BY SIGNING AND ACCEPTING THIS QUOTATION, CUSTOMER ACKNOWLEDGES THAT HEISHE HAS READ, UNDERSTANDS
<br />AND AGREES WITH ALL OF THE TERMS AND CONDITIONS LISTED WITHIN
<br />RUOTED BY: ACCEPTED BY: TITLE:
<br />Aaron Brown
<br />SIGNATURE SI GWTUP.E DATE
<br />02116121 Harpreet Singh & Varinder Pal Singh
<br />`PVT HAVE D4T_ PR.Iv NAME
<br />Northwest Pump 15 E Grant Line Road
<br />Desired Delivery Date:
<br />Northwest Pump and Equipment Co. is an Employee Owned company that has been a Petroleum Equipment Distributor since 1959. We are the
<br />West's largest distributor of tanks, piping, pumps, meters, tank monitoring systems, leak monitoring systems and lubrication equipment. We are
<br />pleased to offer this quotation for the referenced project. Please contact me if you need additional information.
<br />Page 1 of 6
<br />Northwest Pump Equipment Co.
<br />COME k. Y
<br />15 E Grant Lind Road
<br />_ _ - _U - I I-
<br />02116;21
<br />OvoTENUMBER
<br />1
<br />PZ')J="T
<br />Edgewood Commercial Tracy
<br />CTY
<br />DESCRIPTION
<br />_T ---_
<br />=:•TFhr'=f'
<br />0 P 6571 Series Package Kit Including: 66
<br />Z-ENO-ISHGST
<br />TANKS:
<br />6571 EVRL-164042RT051 EVR Single port, 42" Dia
<br />6
<br />Xerxes 25,D00.10' Double Wall FRP Tank NATO 87
<br />61JSK-44CB EVR Jack Screw Ass. For Cast Iron Base Fills
<br />of Canisters by NWP from Veeder Raat. Naw Garb Certified.
<br />2
<br />61SALP-1020-EVR Fuel Swivel Adapter Low Profile, Bronze
<br />330160-004
<br />Veeder-Roet SEM Software Enhancement Module
<br />1 25000-10' Double Wall FRP Tank VITO
<br />1
<br />PK3-42RTDI ESEL-33
<br />VPN4x7 4" Nipple 7" Long For Fill
<br />Uninterruptible Power Supply. Media content will be managed by Outcast Media
<br />1 25000-10' brine
<br />FSA -400-S Short EVR Face Seal Adapter 69
<br />Veeder-Raot G-SitelPasspolt Dispenser Interface Module (DIM)
<br />331063-025
<br />M PWS -33 Sump Shield for Sumps Lids Up to 32.5" Dia. 10
<br />22" DW Manwaywith (3) 4" Manway Cover Fittings) (Half
<br />Veeder-Root RS -232 Interface Module
<br />C05223M Shroud Boot Cap To Isolate One FRP Cover Point jI
<br />Page 5 of 6
<br />1
<br />Cplg.)
<br />Cisco 4 -Port RV042 Firewall Router
<br />10 g 5
<br />�3
<br />6
<br />2 4" Tank Wall Fitting, half coupling DW Double Wall Collar & Sump Package for
<br />0 P 5 Gallon Shroud Boot
<br />�4
<br />12
<br />1
<br />0 P Lower Clamp �5
<br />25,000-1 D' DVJTank
<br />H15190M
<br />0 P Upper Clamp
<br />GilbaShipping and Handling per Applause System
<br />rco
<br />Double Wall Collar & Sump Package. 42" diameter DW
<br />3
<br />71SO-41OCT
<br />OPW EVR 4" Overfill Valve 2 Point 120" Upper 102" Lower
<br />,8
<br />1
<br />Round Collar Containment with 42"x 48" DW Sump with
<br />O PW 2" Thread -on, 3" we pres., 8" we vac. Garb Approved
<br />,g
<br />2
<br />C05223M
<br />OPW Shroud Boot Cap To Isolate One FRP Cover Point
<br />8�
<br />Open Top. 32" Access, Brine and FRP Bonding Kits
<br />6511-RB16
<br />Pomeco Riser Spacer 16" Center to Center
<br />81
<br />1
<br />233-4422
<br />1 Double Wall Collar & Sump Package: 48" diameter DW
<br />2
<br />233-4432
<br />0 P 4x4x3x2 Extractor Valve W/O Cage
<br />3
<br />Round Containment Collar Ath 48"x 48" DW Sump with 36"
<br />Flexing 42" Raintight Composite Lightweight Manhole w/10" skirt & Cam Locks 83
<br />2
<br />418-1000am
<br />Morrison 18" Limited Access Gasketed Bolted Manhole
<br />Watertight Lid, Brine and FRP Bonding Kits
<br />1
<br />Bravo D.W. Vapor Vent 3 Product FRP Containment Box for 3" Over 2" FRP Pir
<br />1
<br />B501 -D-222
<br />6 Straps for 25K - I U dia. Tank
<br />1
<br />EO -EBS
<br />1
<br />3
<br />Deadmen 10'-25K
<br />FE PETRO 2 HP Variable Speed/Length VL Sub Pump with 19" Riser
<br />3
<br />1
<br />FePetro 5800300100 Variable Speed Controller
<br />12 Turnbuckles for 25k - 1 D' dia tank
<br />STP-DHI 5800300100
<br />FePetro Disp Hook Isolation Box (One Per Submersible) For up to 8 Dispensen 85
<br />4
<br />FG200-QMF-18
<br />Xerxes 10x10-10' Double Wall -Double Bulkhead Multi -Compartment Tank 91 1 Diesel
<br />6
<br />FG200-MSQM-24
<br />Unisource 2"X24" Male Swivel x Quick -Fit Male
<br />3
<br />1 10x10-10' Double WaIFDauble Bulkhead Multi-compart tank
<br />Morrison2" Ball Valve 8/0
<br />10
<br />012030-626-0
<br />Smith FRP 3"AB2481Sump Penetration/Termination Fitting. 87
<br />1 1 Ox 10- 1 U DW -CT brine -interstice
<br />1
<br />88
<br />2
<br />012040-626-0
<br />22" DW Manway with (3) 4" Manway Cover Fitting(s) (Half
<br />1
<br />Bravo 3/4" FRP Rigid DW Electrical Sump Penetration Fitting AB2481 Use Witt g�
<br />10
<br />Cplg.)
<br />Robroy 3/4" Conduit. Okay for Sodium Chloride Brine and Propylene Glycol
<br />91
<br />Bravo 400ml Dual Cartridge'Petro Seal' W/ 3 Mix Tips. Each kit handles 1 Dea E
<br />4 4" Tank Wall Fitting, half coupling DW Double Wall Collar & Sump Package for 10x10-
<br />PS -400
<br />92
<br />Penetrations
<br />1
<br />10' DIN Com partment Tank
<br />Double Wall Collar & Sump Package: 42" diameter OW
<br />ENCORE 700S RETAIL DISPENSERS: 94
<br />Gilbarco Blending 3+0 S Series Three Product, Two Sided, Two Hose Dispel
<br />Round Collar Containment with 42"x 48" DW Sump with
<br />ENC700SNN1
<br />(Chip) Card Reader (1 10.4" color screen
<br />Open Top, 32" Access, Brine and FRP Banding Kits
<br />Gilbarco Blending 3+1 S Series Four Product, Two Sided, Four Hose Dispenser
<br />4
<br />2 Double Wall Collar & Sump Package: 48" diameter DW
<br />(Chip) Card Reader (1 10.4" color screen
<br />Payment Options g6
<br />Round Containment Collar uth 48"x 48" DW Sump with 36"
<br />Z-ENO-PCSCO2
<br />Global Contactless Module (GCM) 5j
<br />6
<br />Z-EN7-PEPP01
<br />Watertight Lid, Brine and FRP Banding Kits
<br />1
<br />10x10-10' Stnd Straps Set
<br />1
<br />1Ox10-10' Deadmen
<br />1
<br />10x10-10' Turnbuckles -16
<br />1
<br />Freight to Tracy, 10' (25k tank plus dead men)
<br />1
<br />Freight to Tracy, ID' (10x10 tank plus deadmen)
<br />1
<br />Freight to Tracy. CA -8' (deadmen if required to ship ahead of tank
<br />TAN K HARDWAR E:
<br />OPW 6571 Series Package Kit Including:
<br />6571 EV RB-164042RT052 EVR Multipart. 42"Dia
<br />61JSK-44CB EVR Jack Screw Ass. For Cast Iron Base Fills
<br />61SALP-1020-EVR Fuel Swivel Adapter Low Profile, Bronze
<br />634TT-7085,-EVR 4" Fill Cap
<br />61 VSA- 1020-EVR Vapor Swivel Adapter, Bronze
<br />2
<br />PK2-42RTMP-33
<br />1711T-7085-EVR 4" Vapor Cap
<br />VPN4x7 4" Nipple 7" Long For Fill
<br />FSA -400-S Short EVR Face Seal Adapter
<br />H12806M 4"1e 5" Long For Vapor
<br />8511-RB16 Riser Spacer 16' Center to Center
<br />MPWS-33 Sump Shield for Sumps Lids Up to 32.5" Di
<br />Page 2 of 6
<br />Northwest Pump Equipment Co.
<br />J
<br />0
<br />0
<br />0
<br />F1 0]
<br />I I
<br />12
<br />13
<br />14
<br />15
<br />16
<br />17
<br />,8
<br />a
<br />19
<br />2 (d
<br />21
<br />22
<br />23
<br />0
<br />24
<br />3fD
<br />31
<br />32
<br />33
<br />34
<br />35
<br />510
<br />51
<br />52
<br />53
<br />COMPANY.
<br />15 E Grant Line Road
<br />DATE
<br />PROJECT.
<br />Edgewood Commercial Tracy
<br />QTY
<br />Part Number
<br />DESCRIPTION
<br />6
<br />CP-EBRVOG-00
<br />0 P 6571 Series Package Kit Including: 66
<br />Z-ENO-ISHGST
<br />6
<br />6571 EVRL-164042RT051 EVR Single port, 42" Dia
<br />6
<br />Freight
<br />61JSK-44CB EVR Jack Screw Ass. For Cast Iron Base Fills
<br />of Canisters by NWP from Veeder Raat. Naw Garb Certified.
<br />2
<br />61SALP-1020-EVR Fuel Swivel Adapter Low Profile, Bronze
<br />330160-004
<br />Veeder-Roet SEM Software Enhancement Module
<br />634TT-7085-EVR 4" Fill Cap 68
<br />1
<br />PK3-42RTDI ESEL-33
<br />VPN4x7 4" Nipple 7" Long For Fill
<br />Uninterruptible Power Supply. Media content will be managed by Outcast Media
<br />when you want to mount the Pressure Sensor at the vent rack rather than in a dispenser.
<br />FSA -400-S Short EVR Face Seal Adapter 69
<br />Veeder-Raot G-SitelPasspolt Dispenser Interface Module (DIM)
<br />331063-025
<br />M PWS -33 Sump Shield for Sumps Lids Up to 32.5" Dia. 10
<br />329382-001N
<br />Veeder-Root RS -232 Interface Module
<br />C05223M Shroud Boot Cap To Isolate One FRP Cover Point jI
<br />Page 5 of 6
<br />1
<br />23-0033 2" vent Cap
<br />�2
<br />Cisco 4 -Port RV042 Firewall Router
<br />10 g 5
<br />�3
<br />6
<br />D02575M
<br />0 P 5 Gallon Shroud Boot
<br />�4
<br />12
<br />H15188M
<br />0 P Lower Clamp �5
<br />12
<br />H15190M
<br />0 P Upper Clamp
<br />GilbaShipping and Handling per Applause System
<br />rco
<br />12
<br />3
<br />71SO-41OCT
<br />OPW EVR 4" Overfill Valve 2 Point 120" Upper 102" Lower
<br />,8
<br />1
<br />723V-2203
<br />O PW 2" Thread -on, 3" we pres., 8" we vac. Garb Approved
<br />,g
<br />2
<br />C05223M
<br />OPW Shroud Boot Cap To Isolate One FRP Cover Point
<br />8�
<br />2
<br />6511-RB16
<br />Pomeco Riser Spacer 16" Center to Center
<br />81
<br />1
<br />233-4422
<br />0 P 4x4x2x2 Extractor Valve W/O Cage
<br />82
<br />2
<br />233-4432
<br />0 P 4x4x3x2 Extractor Valve W/O Cage
<br />3
<br />14U-RT4210CL
<br />Flexing 42" Raintight Composite Lightweight Manhole w/10" skirt & Cam Locks 83
<br />2
<br />418-1000am
<br />Morrison 18" Limited Access Gasketed Bolted Manhole
<br />1
<br />Bravo D.W. Vapor Vent 3 Product FRP Containment Box for 3" Over 2" FRP Pir
<br />1
<br />B501 -D-222
<br />Planter Area. Add $206.15 for Steel Plate Walk Area Unit
<br />1
<br />EO -EBS
<br />Bravo Electrical Offset For Bravo Vent Box S4
<br />3
<br />STPMRVS2-VL2-402725919
<br />FE PETRO 2 HP Variable Speed/Length VL Sub Pump with 19" Riser
<br />3
<br />MAGVFC 5874202800
<br />FePetro 5800300100 Variable Speed Controller
<br />3
<br />STP-DHI 5800300100
<br />FePetro Disp Hook Isolation Box (One Per Submersible) For up to 8 Dispensen 85
<br />4
<br />FG200-QMF-18
<br />Unisource 2" Quick Fit Male X Female 18"
<br />6
<br />FG200-MSQM-24
<br />Unisource 2"X24" Male Swivel x Quick -Fit Male
<br />3
<br />691-08001V
<br />Morrison2" Ball Valve 8/0
<br />10
<br />012030-626-0
<br />Smith FRP 3"AB2481Sump Penetration/Termination Fitting. 87
<br />1
<br />88
<br />2
<br />012040-626-0
<br />Smith FRP 4"AB2481Sump Penetration/Termination Fitting. 89
<br />1
<br />Bravo 3/4" FRP Rigid DW Electrical Sump Penetration Fitting AB2481 Use Witt g�
<br />10
<br />F-07RS-0-DF
<br />Robroy 3/4" Conduit. Okay for Sodium Chloride Brine and Propylene Glycol
<br />91
<br />Bravo 400ml Dual Cartridge'Petro Seal' W/ 3 Mix Tips. Each kit handles 1 Dea E
<br />1
<br />PS -400
<br />92
<br />Penetrations
<br />93
<br />Encore 700s Dispensers
<br />ENCORE 700S RETAIL DISPENSERS: 94
<br />Gilbarco Blending 3+0 S Series Three Product, Two Sided, Two Hose Dispel
<br />2
<br />ENC700SNN1
<br />(Chip) Card Reader (1 10.4" color screen
<br />95
<br />Gilbarco Blending 3+1 S Series Four Product, Two Sided, Four Hose Dispenser
<br />4
<br />ENC700SNL1
<br />(Chip) Card Reader (1 10.4" color screen
<br />Payment Options g6
<br />6
<br />Z-ENO-PCSCO2
<br />Global Contactless Module (GCM) 5j
<br />6
<br />Z-EN7-PEPP01
<br />Enc 700s (U Pi
<br />6
<br />M15315KO07
<br />6
<br />Z-ENO-GCBS02
<br />6
<br />Z-ENO-HVBR00
<br />6
<br />Z-ENO-HVBRFO
<br />6
<br />CP-EBRVOG-00
<br />6
<br />Z-ENO-ISHGST
<br />6
<br />Veeder Root Call stil SO ComponentsIVST Hanging Hardware Terms: 50% down
<br />6
<br />Freight
<br />DMPANY.
<br />2DJECT.
<br />QTY PartNumber
<br />DCM (Dispenser Communications Module) Kit
<br />Call Button and Intercom Speaker
<br />Balance Ready Vapor Recovery System installed on new units (except Flex Fue
<br />units)
<br />ISD Flow Meter (to be used with Balanced Vapor Recovery System)
<br />Canopy (Brandview)
<br />DuraMaxT"' Silver -tone Sheathing
<br />Encore 2 Year Warranty (Standard)
<br />Gilbarco Shipping and Handling per Dispenser
<br />Page 3 of 6
<br />Northwest Pump Equipment Co.
<br />DMI Y
<br />CTY ='Ll rt', lrnb 3r
<br />s 6OVSP-1001
<br />22 FG150•MQM-24
<br />1
<br />1
<br />2
<br />1
<br />1
<br />1
<br />3
<br />2
<br />1
<br />3
<br />1
<br />1
<br />2
<br />1
<br />1
<br />1
<br />3
<br />848290-022-15D
<br />329356-002
<br />329358-001
<br />329359-001
<br />329382-001N
<br />330020-425
<br />846390-110
<br />886100-000
<br />846400-001
<br />848480-003
<br />330843-001
<br />330374-001
<br />794380-303
<br />790091-001
<br />79DO95-001
<br />305XPA-1100AK-EV R
<br />1 332250-001
<br />13 330020-536
<br />1
<br />2
<br />1
<br />1
<br />3
<br />3
<br />1
<br />3
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />329356-004
<br />33DD20-480
<br />330020-485
<br />33DO20-488
<br />576008-657
<br />576008-649
<br />332310-003
<br />400137937
<br />847490-001
<br />Edgewood Commercial Tracy 1
<br />0 P 1" x 1 112" Popp et ed Vapor Shear Valve
<br />Unisource 1.5" Hex Male x 1.5" Quick Fit male x 24" SS Connector
<br />DATE Ol I.:0 Ii_ '•1
<br />0211 B121
<br />TLS350 Tank Monitor:
<br />Veeder-Root TLS -350 Plus Tank Monitoring Console with Integral Printer. Use This Part
<br />Number in Ca. Only When ISD 333760-203i NVMEM is Being Used.
<br />Veeder-Root Four Input Probe Module Mounts in L" Power Comp-
<br />Veeder-Root Eight Input Sensor Module - Mounts in Low Power Comp.
<br />Veeder-Root Four Relay Output Module
<br />Veeder-Root RS -232 Interface Module
<br />Veeder-Root Module, Ethernet TCP/IP Communications TLS -350 Series Consoles
<br />Veeder-Root 10.5' Mag PI usMa gnetostrictive Probe
<br />Veeder-Rod Phase -Two Water Mag Plus Gas Probe Installation Kit S Cable
<br />Veeder-Root Mag Plus Diesel Probe Installation Kit 5' Cable
<br />Veeder-Raot PLLD Line Leak Detector with SwiftCheck Valve E85 Ok
<br />Veeder-Root Six Input PLLD Module Mounts in Low Power Comp.
<br />Veeder-R❑ot Three Output PLLD Module
<br />Veeder-Roat Dual Point Hydrostatic Sensor for Brine Tanks wlcap
<br />Veeder-Root Overfill Alarm
<br />Veeder-Root Alarm AcknavAedgement Snitch
<br />Veeder-R❑❑t Factory freight
<br />Morrison4" Probe Cap and Ring Kits EVR
<br />Veeder-Root Vacuum 1 Hydrostatic Monitoring for AB2481
<br />Y g
<br />Veeder Root 7 Input Smart Sensor Module WEmPressure ressure Sensor For Vacuum
<br />Sensor Monitoring & ISD For VR Carbon Canister. One spot required for the Vapor
<br />Pressure Sensor and one for the canister valve and one for each Vapor Flow Sensor.
<br />Mounts in Low Power Compartment.
<br />Veeder-Root Hydrostatic Dispenser Sump Sensor Kit. Includes lea Mini -hydrostatic
<br />Sensor, Dispenser Sump Sensor, 2 to 1 Sensor Input Box
<br />Veeder-Root 8 Input Smart Sensor Module for VacuumlMag Sensors Mounts in Lory
<br />r
<br />Power Compartment. One of required for the Vapor Sensor and one for
<br />P p q p
<br />each Vapor Flow Sensor.
<br />Veeder-Root Zea Vacuum Sensor Kit No Tank Support IE Brine Tanks
<br />Veeder-Root 3ea Vacuum Sensor Kit No Tank Support IE Brine Tanks
<br />Veeder-Root 1A" NPT 15ea Barbed Fittings
<br />Veeder-Root 576006-657 Barbed Tee
<br />Veeder-Root 3 Way Ball Valve
<br />Veeder-Root 100' Vacuum Hose
<br />FePetro Siphon Check Valve for Vacuum
<br />Veeder-Root Expansion Module
<br />15 E Grant Line Road DATE COMPANY:
<br />Edgewood Commercial Tracy PROJECT:
<br />DESCRIPTION QTY Part Number
<br />6
<br />Veeder-Root Carbon Canister for ISD
<br />Gilbarco Shipping and Handling per Dispenser to Ca Warehouse
<br />Veeder-R❑ot Carbon Pressure Management System VV/ 2" Installation Kit Requires
<br />861290 002
<br />V29 Software
<br />2
<br />Veeder-Root Factory freight for Carbon Canister only
<br />RE -501
<br />Bravo Canister Vent Rack for 1,2 or 3 vents,
<br />VPC -2
<br />Brava One 2" Clamp w/Bolt. Nut & Washers
<br />2
<br />Veeder Root Call stil SO ComponentsIVST Hanging Hardware Terms: 50% down
<br />Includes on-site Applause server, software application, install kit and 1 year of A
<br />payment required and balance due 10 days after invoice which will be upon receipt
<br />1
<br />of Canisters by NWP from Veeder Raat. Naw Garb Certified.
<br />2
<br />Veeder-Roat In -Station Diagnostics ISD
<br />330160-004
<br />Veeder-Roet SEM Software Enhancement Module
<br />1
<br />Veeder-RoH ISD Manuals & Vapor Pressure Sensor an d Housing -1 per site. For use
<br />330020 630
<br />Applause TV with V -Net
<br />Contract
<br />Uninterruptible Power Supply. Media content will be managed by Outcast Media
<br />when you want to mount the Pressure Sensor at the vent rack rather than in a dispenser.
<br />330280-401
<br />Veeder-Raot G-SitelPasspolt Dispenser Interface Module (DIM)
<br />331063-025
<br />Veeder-R❑ot G -Site 25' cable toTLS35OR & Installation Manual
<br />329382-001N
<br />Veeder-Root RS -232 Interface Module
<br />2
<br />Page 5 of 6
<br />1
<br />Northwest Pump Equipment Co.
<br />15 E Grant Line Road DATE COMPANY:
<br />Edgewood Commercial Tracy PROJECT:
<br />DESCRIPTION QTY Part Number
<br />6
<br />PA0421100xxxx
<br />Gilbarco Shipping and Handling per Dispenser to Ca Warehouse
<br />4170648
<br />1
<br />BRKT-B2
<br />2
<br />Freight
<br />Applause Media and Applause TV with V -Net For 700S
<br />Im3
<br />6
<br />LD-ENE-QGEN3-Q104-KIT
<br />2
<br />LU
<br />Includes on-site Applause server, software application, install kit and 1 year of A
<br />�4
<br />1
<br />LD -APP -REM -KIT
<br />2
<br />10.4 Color Screen w/ 8 year
<br />Software Maintenance Services. Pricing also include FlexPay Connect(DCM & E
<br />105
<br />1
<br />CCL142-EMV
<br />1
<br />Applause TV with V -Net
<br />Contract
<br />Uninterruptible Power Supply. Media content will be managed by Outcast Media
<br />1fD6
<br />1
<br />OAS
<br />OL -_UJ
<br />length of the Outcast agreement at no additional cost.
<br />1071
<br />2
<br />FS120KIT
<br />1
<br />654632
<br />Cisco 4 -Port RV042 Firewall Router
<br />10 g 5
<br />2
<br />2
<br />1146
<br />1
<br />4170648
<br />UPS 1 per site recommended
<br />1 0
<br />2
<br />1312
<br />1312PID-
<br />1
<br />Freight
<br />GilbaShipping and Handling per Applause System
<br />rco
<br />12
<br />HW3X5
<br />UnBranded PX60 Passport
<br />111
<br />12
<br />VR -A-800-952-5588
<br />Passport Combination (Cashier/ Manager) Work Station:
<br />112
<br />12
<br />PID-PROP65
<br />Gilbarco Passport 420 SSD Combo Manager! Cashier Workstation with/ PAA All -in One Server i
<br />1
<br />A 0 SSD V2D COMBO -
<br />Pro Cap Touch Monitorw/SSDs/Enhanced Dispenser Hub 2 w/SSDs/ Install KrU Epson TM88 Recel
<br />113
<br />12
<br />PID -203
<br />Cash Drawer/ Keyboard&Mouse/ 1st yr PLUS Service/ 12 month hardware warmnty:INCLUDES: IP
<br />F 114
<br />12
<br />PID -D-43
<br />10 Licenes $ Activation Codes
<br />1
<br />SW Modules
<br />Core Suite:
<br />1
<br />PA0421100xxxx
<br />VeriFone Mx 915 Pin Pad WFG1 -Wells Fargo 351 Key- First Data/Con
<br />1
<br />4170648
<br />UPS
<br />1
<br />11passport Base Application Software Phillips 66 v20.O2 S70813200002FD
<br />Passport Cashier Workstation
<br />1 1A10 SSD v20 CASHIER
<br />1
<br />PA0421100xxxx
<br />1
<br />4170648
<br />1
<br />BRKT-B2
<br />2
<br />Freight
<br />1
<br />HL-L2370DW
<br />2
<br />HHP-1950GSR2EZ-2R
<br />2
<br />LU
<br />2
<br />MET132-019-01-A
<br />1
<br />3328277
<br />2
<br />013180-20BS
<br />2
<br />VF1546-13
<br />1
<br />O
<br />1
<br />12 VSTAP-EVR-012
<br />12 VDVP-EVR-096
<br />12 VST-EVR-NBBK-2
<br />12 VSTA-EVR-SBKA
<br />8 V34CPG-012-MRMR
<br />8 V34CPG-102-MRMR
<br />8 11B-0100
<br />8 8G-0100
<br />8 241TPS-0241
<br />8 66REC-1000
<br />6
<br />B8380 -D30
<br />16
<br />BK -8000
<br />6
<br />BRKT-B2
<br />22
<br />012030-626-0
<br />28
<br />BGS6072
<br />16
<br />1 GBH M P-5830
<br />Gilbarco Passport CashierWorkstatior with/ Px60 Server with 15"Pro Cap Touch Monitor/SSDs/ Ins
<br />Epson TM88 Receipt Pnnter/ Cash Drawer! QWERTY Keyboard/ Mouse/ 1st yr PLUS Service/ 12 mr
<br />hardware warranty: INCLUDES: Windows 10 Licenes $ Activation Codes
<br />VeriFone Mx 915 Pin Pad 1n1FG1 -Wells Fargo 351 Key- First Data/Con
<br />UPS
<br />Passport Client Application Software
<br />Misc. Item:
<br />Gilbarco Shipping and Handling per Passport terminal
<br />Report Printer -Brother Laser Jet
<br />Xenon 2D Scanner
<br />Includes:Rs-232 cable, Power Supply, Stand
<br />Pin Pad Pedestal for Mx915- Locking, Swivel
<br />11 Managed Switch EMV Switch
<br />Tank Monitor Gender Mender Interfacing Tank Monitor to Passpo t
<br />MX915 Cover- Protects from Spills, Bacteria, Dirt, Moisture - Easy to Clean
<br />Optional 1st YR MTL (Material,Travel,Labor) one per Combo
<br />optional 1st YR MTL (Material,Travel,Labor) one per Cashier WS
<br />Dispenser Hardware
<br />Balance Hanging Hardware
<br />VST 12" Platinum Coaxial EVR Whip Hose
<br />VST 8' Platinum Coaxial EVR Hose With Venturi
<br />VST Coaxial EVR G2 Balance Nozzle Black
<br />VST Reattachable Coaxial EVR Breakaway with Check Valve
<br />Diesel Hanging Hardware
<br />VST 314" x 12" M X M Green CP Whip Hose
<br />VST 314" x 8'6" M X MCP Green CP Hose
<br />0 P Diesel Nozzle (Green) Pressure Activated
<br />0 P Green Splash Guard
<br />O PW 3/4" Swivel
<br />0 P 314" Reconnectable Breakaway
<br />Island Hardware
<br />Bravo 36" Encore DW Brine Dispenser Sump 213 Product. Includes EO-FRM A
<br />Factory Freight
<br />Bravo Product Shear Valve Bracket X & Y Axis Adjustable Bracket For B8000/E
<br />Bravo Vapor Shear Valve Bracket
<br />Smith FRP 3"AB2481Sump Penetration/Termination Fitting.
<br />Flexing 6" x72" Bollard
<br />OPW Double Poppet Shear Valve- Male
<br />Page 4 of 6
<br />Northwest Pump Equipment Co.
<br />15 E Grant Line Road
<br />Edgewood Commercial Tracy
<br />DESCRIPTION
<br />Miscellaneous
<br />LD 4 Layer Shield Kit for ENC700's ECIM 10.4" Display
<br />Lens Defender Application and Removal Kit
<br />Card Reader Cleaners For EMV Readers Pack of 40
<br />Overfill Alarm Sign
<br />Emergency Shut-off Switch
<br />Crind Paper 2 15/16'k3" Black Image Thermal Case of 24
<br />Veeder Root TLS350 Thermal Paper 2 1/4'k2 7/8" Case of 50
<br />PI Health Warning Decal
<br />Nozzle Operation Decal w/CARB Contact Info
<br />Decal Prop 65 Decal. Required in Ca
<br />Warning: No Smoking, Stop Engine Decal
<br />Decal Warning No Cell Phone
<br />Page 6 of 6
<br />Northwest Pump Equipment Co.
<br />DATE OF QUCTATION
<br />02/16/21
<br />CONTRACTOR SUPPLIED FUEL SYSTEM EQUIPMENT
<br />PRIMARY PIPING WITH CONTAINMENT SYSTEM SHALL BE RED THREAD IIA
<br />AND RED THREAD II WITH FITTINGS AND D5-1000 AND DS -8000 SERIES
<br />ADHESIVE
<br />(*) NOTE WELL - THE EQUIPMENT LIST ON THIS SHEET IS INTENDED FOR
<br />PERMIT PURPOSES. WHILE IT MAY PROVIDE A CONCEPTUAL
<br />REPRESENTATION OF THE EQUIPMENT TO 5E INSTALLED, THE FUEL SYSTEM
<br />CONTRACTOR SHALL CONSULT AND CONFIRM THE FINAL, APPROVED,
<br />OWNER -VENDER EQUIPMENT LIST TO DETERMINE THE OWNER'S SUPPLIED
<br />EQUIPMENT AND THE FUEL SYSTEM CONTRACTOR'S EXPECTED AND
<br />REQUIRED ADDITIONAL MATERIALS, EQUIPMENT AND EQUIPMENT
<br />MANUFACTURERS' CERTIFICATIONS AND APPROVALS FOR INSTALLATION
<br />OF ALL OF THE FUEL SYSTEM RELATED WORK, INCLUDING ALL RELATED
<br />ELECTRICAL COMPONENTS, TO PROVIDE A COMPLETE, WORKABLE FUEL
<br />SYSTEM PER MANUFACTURERSAND CODE REQUIREMENTS.
<br />ARC
<br />~��40Qy�EL E t�n
<br />.�C� C ALSO
<br />�
<br />�
<br />Z to W
<br />U
<br />Z
<br />6P
<br />LLI
<br />-4
<br />WW >N
<br />J�X�OmdsF-
<br />1010m
<br />_OOzmc�
<br />W X
<br />w
<br />V'
<br />Z
<br />Q 0-)
<br />LU
<br />tn0c�-4
<br />rV
<br />W
<br />(V
<br />W
<br />Q
<br />X W rr
<br />Z Z
<br />W
<br />O
<br />co
<br />N
<br />0
<br />Q
<br />OL -_UJ
<br />4 m
<br />W
<br />O
<br />Q
<br />A
<br />J
<br />�
<br />�
<br />Z to W
<br />}0UX
<br />WVLL-N
<br />LLI
<br />-4
<br />WW >N
<br />J�X�OmdsF-
<br />- U
<br />_OOzmc�
<br />W X
<br />U
<br />w
<br />I
<br />Q 0-)
<br />LU
<br />rV
<br />�6
<br />W
<br />Q
<br />Q) W
<br />AEz
<br />W
<br />U
<br />Q
<br />J p
<br />JW
<br />D a M r Z m
<br />0 L °100 1
<br />OV oo—)
<br />1
<br />�01Wr �U�
<br />WSW
<br />OWN (L
<br />13 LU (S z
<br />V=
<br />a �
<br />LLI
<br />-4
<br />nWn,
<br />ll'
<br />LU
<br />r
<br />W
<br />'
<br />`Q
<br />W
<br />co
<br />N
<br />II
<br />CQ
<br />W
<br />O
<br />Q
<br />A
<br />J
<br />Q
<br />J p
<br />JW
<br />D a M r Z m
<br />0 L °100 1
<br />OV oo—)
<br />1
<br />�01Wr �U�
<br />WSW
<br />OWN (L
<br />13 LU (S z
<br />V=
<br />a �
<br />UZ�
<br />>QWW�
<br />�w����
<br />N lfl
<br />-1 0OWU
<br />VW (V
<br />W Z IE`��> �v @
<br />, I o IY
<br />w o N
<br />w W,LA�
<br />W ., �0M T- 4
<br />~ W -W>-,4�3W O
<br />a 2 �D ZT-E _1 t
<br />z 0- -1 V o Z
<br />W��
<br />��Wo(ya >-
<br />(n L 1111 QOXOI- IL
<br />0 w 0
<br />Wo T_ Z-4
<br />QWI(Y0 Q_
<br />wWdWw0
<br />liriiili�,rIIIIIn.I ulu 11111111 IIIIIIIIIIIIIIIII /III I)I 'I VI ���lu�
<br />• O —
<br />nWn,
<br />ll'
<br />W
<br />Q
<br />UZ�
<br />>QWW�
<br />�w����
<br />N lfl
<br />-1 0OWU
<br />VW (V
<br />W Z IE`��> �v @
<br />, I o IY
<br />w o N
<br />w W,LA�
<br />W ., �0M T- 4
<br />~ W -W>-,4�3W O
<br />a 2 �D ZT-E _1 t
<br />z 0- -1 V o Z
<br />W��
<br />��Wo(ya >-
<br />(n L 1111 QOXOI- IL
<br />0 w 0
<br />Wo T_ Z-4
<br />QWI(Y0 Q_
<br />wWdWw0
<br />liriiili�,rIIIIIn.I ulu 11111111 IIIIIIIIIIIIIIIII /III I)I 'I VI ���lu�
<br />• O —
<br />
|