REQUIRED DOCUMENTATION <br />I. A PROJECT CONTACT LIST WITH ALL GENERAL CONTRACTOR AND SUBCONTRACTOR CONTACTS AND <br />PHONE NUMBERS SHALL BE SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER, ALONG WITH A <br />DETAILED CONSTRUCTION SCHEDULE PRIOR TO STARTING THIS PROJECT. <br />2. THE FOLLOWING DOCUMENTATION, MINIMALLY, IS REQUIRED PRIOR TO RELEASING THE FINAL 10% <br />RETAINAGE ON THE PROJECT. THESE DOCUMENTS SHALL BE SUBMITTED IN A BOUND PROJECT <br />CLOSE-OUT FOLDER. <br />A. SITE INFORMATION (ADDRESS, SITE/STORE NUMBER, ETC.) <br />B. PROJECT DESCRIPTION WITH START AND FINISH DATES, CONSTRUCTION SCHEDULE <br />C. CONTRACTOR INFORMATION ALONG WITH SUBCONTRACTOR LIST <br />D. JOB PROGRESS PHOTOS (SEE BELOW) <br />E. DAILY JOB PROGRESS LOGS (NEW BUILDS ONLY) <br />F. XERXES INSTALLATION CHECKLIST, INCLUDING DEFLECTION READINGS <br />G. XERXES RECEIVING RECORD <br />H. UNDERGROUND TANK INSTALLATION CHECKLIST <br />I. PIPING MANUFACTURER'S INSTALLATION CHECKLIST <br />J. COPIES OF ALL TEST RESULTS <br />K. UST INFORMATION SHEET <br />L. COPIES OF ALL PERMITS AND INSPECTIONS <br />M. COPY OF CERTIFICATE OF OCCUPANCY (IF REQUIRED) <br />N. COMPLETED AND SIGNED PUNCH LIST <br />O. AS -BUILT DRAWINGS TO SCALE DEPICTING PRECISE LOCATION OF ALL COMPONENTS INSTALLED <br />(INCLUDING PRODUCT/VAPOR LINE SIZES AND LOCATIONS, CONDUIT SIZES, LOCATION 4 MATERIAL, <br />EXACT TANK LOCATION AND DIMENSIONS, ETC.) <br />P. TANK CHARTS (LEAVE SECOND COPY AT STORE) <br />Q. FINAL RELEASE OF LIEN FROM CONTRACTOR AND EACH SUBCONTRACTOR/SUPPLIER <br />R. COPY OF CONTRACT, CHANGE ORDERS, AND WRITTEN APPROVALS FOR DEVIATIONS FROM THESE <br />DRAWINGS. <br />S. COPY OF SIGNED TANK DISPOSAL CERTIFICATE AND ALL WASTE MANIFESTS. <br />T. COMPLIANCE INFORMATION FORMS <br />U. TANK LAYOUT FORM <br />3. CONTRACTOR SHALL MAINTAIN AND TURN OVER 2 COPIES OF AN INDEXED OPERATION AND <br />MAINTENANCE MANUAL, CONSISTING OF BOOKLETS FOR ALL NEWLY INSTALLED EQUIPMENT. GIVE ONE <br />COPY TO THE OWNER'S CONSTRUCTION MANAGER AND LEAVE ONE AT THE STORE. CONTRACTOR <br />SHALL LEAVE TANK CHARTS, TANK STICK, MANWAY REMOVAL DEVICE, WATER FINDING PASTE, AND <br />ALL KEYS AT THE STORE. <br />4. JOB PROGRESS PHOTOS - FUEL SYSTEM INSTALLATION <br />AT A MINIMUM, THE FOLLOWING PHOTOS ARE TO BE SUBMITTED ON S 1/2'' X 11'' PLASTIC SHEETS, <br />LABELED WITH SCOPE OF WORK, STORE No. AND ADDRESS, IN THE BOUND PJT. CLOSE-OUT FOLDER: <br />A. PHOTOS OF LOCATION PRIOR TO START OF CONSTRUCTION (MINIMUM 4) <br />B. EACH OLD TANK AND OLD TANK HOLE <br />C. OPEN TANK HOLE <br />D. INSTALLATION OF NEW TANKS INCLUDING DEADMEN AND HOLD-DOWN STRAPS N DURING, 1 AT FINISH) <br />E. PEA GRAVEL BACKFILL (INCLUDES TAMPING OF PEA GROVEL AT 5:00 AND -1:00 POSITIONS) <br />(3 PHOTOS) <br />F. INSTALLATION OF PRODUCT LINES, VENT LINES AND ELECTRICAL IN TANK HOLE <br />G. INSTALLATION OF TANK -TOP EQUIPMENT, FILL TUBES AND SUBMERSIBLE PUMPS <br />H. BACKFILLED TANKS JUST BEFORE CONCRETE POUR, SHOWING REBAR <br />I. REBAR PROPERLY INSTALLED AROUND FILL AND TURBINE SUMP MANHOLES <br />J. TANK FIELD READY TO RECEIVE CONCRETE (INCLUDES REBAR ON CHAIRS OR BRICK BATS) <br />K. DEPTH OF NEW CONCRETE <br />L. TANK FIELD COMPLETE (INCLUDES JOINTS, PAINTED FILL CAPS, AND VENT RISERS) (MIN. 2) <br />M. OPEN TRENCHES <br />N. PRODUCT PIPING IN TRENCHES (PROPERLY SPACED) <br />O. FIELD DRESSED PIPE <br />P. PEA GRAVEL BACKFILL IN TRENCHES (SHOW PEA GRAVEL UNDER PRODUCT LINES) <br />Q. SHOW INSTALLATION OF DISPENSER CONTAINMENT BOXES <br />R. PRODUCT PIPE TRENCHES READY TO RECEIVE CONCRETE (SHOW REBAR DOWELED INTO EXISTING <br />CONCRETE, WHEN APPLICABLE) <br />S. LOCATION OF PHOTO ELECTRIC CELL AND/ OR CONTACTOR FOR CANOPY LIGHTS AND SIGNS <br />T. INSTALLATION OF NEW CANOPY FOOTINGS <br />U. PICTURE OF FINISHED CANOPY <br />V. PICTURES OF LOCATION AT THE END OF CONSTRUCTION (MINIMUM 4) <br />CLASS LOCATIONS - MOTOR FUEL DISPENSING FACILITIES <br />EXCERPTS FROM TABLE 514.3(5)(1) CLASS I LOCATIONS - MOTOR FUEL DISPENSING FACILITIES <br />DISPENSER (EXCEPT OVERHEAD TYPE) (SEE ALSO CEC FIGURE 514.3) <br />UDC (UNDER DISPENSER CONTAINMENT) <br />DIV. 1 ENTIRE SPACE W/IN AND UNDER DISPENSER PIT OR UDC <br />DISPENSER - OUTDOOR <br />AREA CLASSIFICATION INSIDE THE DISPENSER ENCLOSURE IS COVERED IN UL 8l, STD. <br />F/ POWER -OPERATED DISP. DEVICES FOR PETROL. PRODUCTS <br />DIV. 2 W/IN 15 IN. OF DISPENSER ENCLOSURE OR THAT PORTION OF DISPENSER ENCLOSURE <br />CONTAINING LIQUID HANDLING COMPONENTS, EXTENDING HORIZONTALLY IN ALL <br />DIRECTIONS AND DOWN TO GRADE LEVEL DIRECTIONS AND DOWN TO GRADE LEVEL <br />DIV. 2 UP TO 15 IN. ABOVE GRADE LEVEL, EXTENDING 20 FT. HORIZ. IN ALL DIRECTIONS FROM <br />DISPENSER ENCLOSURE <br />REMOTE PUMP - OUTDOOR <br />DIV. 1 ENTIRE SPACE W/IN ANY PIT OR BOX BELOW GRADE LEVEL, ANY PART OF WHICH IS <br />W/IN 10 FT. HORIZ. FROM ANY EDGE OF PUMP <br />DIV. 2 W/IN 3 FT. OF ANY EDGE OF PUMP, EXTENDING HORIZONTALLY IN ALL DIRECTIONS <br />DIV. 2 UP TO 18 IN. ABOVE GRADE LEVEL, EXTENDING 10 FT. HORIZ. IN ALL DIRECTIONS FROM <br />ANY EDGE OF PUMP <br />TANK, UNDERGROUND (UST) <br />FILL OPENING <br />DIV. 1 ENTIRE SPACE W/IN ANY PIT OR BOX BELOW GRADE LEVEL, ANY PART OF WHICH IS <br />W/IN A DIV. 1 OR 2 CLASSIFIED LOCATION <br />DIV. 2 UP TO 15 IN. ABOVE GRADE LEVEL, EXTENDING 5 FT. HORIZ. IN ALL DIRECTIONS FROM <br />ANY TIGHT -FILL CONNECTION <br />VENT (UST) <br />W/IN 5 FT. OF OPEN END OF VENT, EXTEND'G. IN ALL DIRECTIONS <br />DIV. 1 <br />BETWEEN 5 FT. AND 10 FT. FROM OPEN END OF VENT, EXTEND'G. IN ALL DIRECTIONS <br />DIV. 2 <br />VAPOR PROCESSING SYSTEM - EQUIPMENT IN PROTECTIVE ENCLOSURES <br />DIV. 2 ENTIRE SPACE W/IN ENCLOSURE <br />VAPOR PROCESSING SYSTEM - EQUIP. NOT W/IN PROTECTIVE ENCLOSURE <br />DIV. 2 W/IN 18 IN. OF EQUIPMENT CONTAINING FLAMMABLE VAPORS OR LIQUID, EXTENDING <br />HORIZONTALLY IN ALL DIRECTIONS AND DOWN TO GRADE LEVEL <br />DIV. 2 UP TO 15 IN. ABOVE GRADE LEVEL W/IN 10 FT. HORIZONTALLY OF THE VAPOR <br />PROCESSING EQUIPMENT <br />fzl <br />F3 <br />_4i <br />Northwest Pump <br />PETROLEUM & INDUSTRIAL <br />OWNER SUPPLIED FUEL SYSTEM EQUIPMENT <br />Stay Updated- Fallow us online! <br />onomr+ <br />3600 Industrial Blvd -Suite 10, Sacramento, CA 95691 916.376.0599 <br />TELEPHONE', <br />FAQ: <br />DATE OF QUOTATION: <br />QUOTE NUMBER <br />PZ')J="T <br />FAX NUMBER <br />02/16121 <br />1 <br />CUSTOMER I CONTACT: <br />PROJECTILOCATION: <br />Harpreet Singh & Varinder Pal Singh <br />Z-ENO-ISHGST <br />15 E Grant Line Road <br />Edgewood Commercial Tracy <br />Tracy, CA 95376 <br />Xerxes 25,D00.10' Double Wall FRP Tank NATO 87 <br />TERMS AND CONDITIONS OF SALE <br />N.W. Pump is not responsible for delays in deliverydue to strikes, accidents, priority restrictions or <br />2 <br />other conditions beyond our control or its failure or delay to order or deliver due to the purchaser's <br />This offer to furnish equipment on the following terms <br />failure to pay N.W.Pump any monies owed on an open job account or job basis. The prices herein <br />and conditions expires 15 days from the above date. <br />do not apply in the event of an underground obstruction, including but not limited to utilities and impenetrable <br />PK3-42RTDI ESEL-33 <br />soil, is discovered after this proposal is made. In such event, Buyer is liable for all increased casts. <br />N.W. Pump, Inc. reserves the right to <br />Buyer may cancel by giving written notice, however, Buyer is liable for all costs incurred by <br />adjust equipment prices to conform to <br />N.W. Pump tothe date notice is received. Cancellations or returns are subjecl la a <br />prices in effect at thetime of delivery <br />minimum fifteen (15%) percent restocking charge. Payment terms are net cash on delivery, <br />22" DW Manwaywith (3) 4" Manway Cover Fittings) (Half <br />unless M.W. Pump has approved credit terms or otherwise specifed within. If litigation is necessary to enforce <br />Eouloment )rices are subject to all wDlicable taxes. <br />this agreement, the prevailing partywill be entitled to reasonable attorneys fees, court costs, and interest. <br />Return of non -stack and special crder items are subject <br />to restock charges er may not be returnable. <br />Products carry only the manufacturer's warranty, if any. NWP makes no representations as to product <br />10 g 5 <br />con liance with government re ulations, There are no expressed or implied warranties as to goods or <br />P 9 9 P P <br />services provided by NWP, including the implied warranty of merchantability or filness for a particular <br />2 4" Tank Wall Fitting, half coupling DW Double Wall Collar & Sump Package for <br />Purpose. Statements by NA representative that differ from the foregoing shall have no effect. NWP will <br />12 <br />not be liable for direct, indirect, special or consequential damages, business interruption or loss of profts <br />0 P Lower Clamp �5 <br />damages, sustained by Customer or any partyclaiming by, through or under Customer. <br />H15190M <br />Acceptance of Proposal: <br />SALES TOTALS <br />EQUIPMENT SUBTOTAL: <br />The above price, specifications and conditions are satisfactory and are hereby <br />INCOMING FREIGHT: <br />accepted. You are authorized to supply equipment and/or labor as specified. <br />ESTIMATED SALES TAX:' <br />,; <br />Pa ment ��III be made as outlined above. I understand ecce once of the <br />Y F� <br />=Actual sales taxma � war the customer <br />� y, <br />quotation does not constitute an order until credit has been approved, <br />reeds pay the tax shown on the invoice. <br />I understand that Northwest Pump may file a Right to Lien against <br />TOTAL: <br />the equipmentllabor. <br />Pomeco Riser Spacer 16" Center to Center <br />81 <br />1 <br />Initials <br />1. Price excludes tank offloading, electrical, piping and installation. <br />2. All Prices are FOB Northwest Pump warehouse except where noted differently. <br />3. Terms: _25_% down. Tanks and dispensers balance due on completion at factory. Net 30 upon approved credit <br />4. Terms: _50_% down on all EVRIISD systems. Non Returnable/Non Refundable <br />5. Prices are good for 15 days from date of quotation. Exception are steel tanks which are 7 days. <br />B. Gilbarco I Gasboy Terms: Special terms applyto the Gilbarco/Gasboy Equipment. Prices reflect a 3% cash discount. Payments <br />must be received within 10 days of invoice. Invoices are sent upon completion of the order at the factory. 3% will be added to invoice <br />and may be deducted if paid within 10 days. Credit card payment not applicable with these terms. <br />BY SIGNING AND ACCEPTING THIS QUOTATION, CUSTOMER ACKNOWLEDGES THAT HEISHE HAS READ, UNDERSTANDS <br />AND AGREES WITH ALL OF THE TERMS AND CONDITIONS LISTED WITHIN <br />RUOTED BY: ACCEPTED BY: TITLE: <br />Aaron Brown <br />SIGNATURE SI GWTUP.E DATE <br />02116121 Harpreet Singh & Varinder Pal Singh <br />`PVT HAVE D4T_ PR.Iv NAME <br />Northwest Pump 15 E Grant Line Road <br />Desired Delivery Date: <br />Northwest Pump and Equipment Co. is an Employee Owned company that has been a Petroleum Equipment Distributor since 1959. We are the <br />West's largest distributor of tanks, piping, pumps, meters, tank monitoring systems, leak monitoring systems and lubrication equipment. We are <br />pleased to offer this quotation for the referenced project. Please contact me if you need additional information. <br />Page 1 of 6 <br />Northwest Pump Equipment Co. <br />COME k. Y <br />15 E Grant Lind Road <br />_ _ - _U - I I- <br />02116;21 <br />OvoTENUMBER <br />1 <br />PZ')J="T <br />Edgewood Commercial Tracy <br />CTY <br />DESCRIPTION <br />_T ---_ <br />=:•TFhr'=f' <br />0 P 6571 Series Package Kit Including: 66 <br />Z-ENO-ISHGST <br />TANKS: <br />6571 EVRL-164042RT051 EVR Single port, 42" Dia <br />6 <br />Xerxes 25,D00.10' Double Wall FRP Tank NATO 87 <br />61JSK-44CB EVR Jack Screw Ass. For Cast Iron Base Fills <br />of Canisters by NWP from Veeder Raat. Naw Garb Certified. <br />2 <br />61SALP-1020-EVR Fuel Swivel Adapter Low Profile, Bronze <br />330160-004 <br />Veeder-Roet SEM Software Enhancement Module <br />1 25000-10' Double Wall FRP Tank VITO <br />1 <br />PK3-42RTDI ESEL-33 <br />VPN4x7 4" Nipple 7" Long For Fill <br />Uninterruptible Power Supply. Media content will be managed by Outcast Media <br />1 25000-10' brine <br />FSA -400-S Short EVR Face Seal Adapter 69 <br />Veeder-Raot G-SitelPasspolt Dispenser Interface Module (DIM) <br />331063-025 <br />M PWS -33 Sump Shield for Sumps Lids Up to 32.5" Dia. 10 <br />22" DW Manwaywith (3) 4" Manway Cover Fittings) (Half <br />Veeder-Root RS -232 Interface Module <br />C05223M Shroud Boot Cap To Isolate One FRP Cover Point jI <br />Page 5 of 6 <br />1 <br />Cplg.) <br />Cisco 4 -Port RV042 Firewall Router <br />10 g 5 <br />�3 <br />6 <br />2 4" Tank Wall Fitting, half coupling DW Double Wall Collar & Sump Package for <br />0 P 5 Gallon Shroud Boot <br />�4 <br />12 <br />1 <br />0 P Lower Clamp �5 <br />25,000-1 D' DVJTank <br />H15190M <br />0 P Upper Clamp <br />GilbaShipping and Handling per Applause System <br />rco <br />Double Wall Collar & Sump Package. 42" diameter DW <br />3 <br />71SO-41OCT <br />OPW EVR 4" Overfill Valve 2 Point 120" Upper 102" Lower <br />,8 <br />1 <br />Round Collar Containment with 42"x 48" DW Sump with <br />O PW 2" Thread -on, 3" we pres., 8" we vac. Garb Approved <br />,g <br />2 <br />C05223M <br />OPW Shroud Boot Cap To Isolate One FRP Cover Point <br />8� <br />Open Top. 32" Access, Brine and FRP Bonding Kits <br />6511-RB16 <br />Pomeco Riser Spacer 16" Center to Center <br />81 <br />1 <br />233-4422 <br />1 Double Wall Collar & Sump Package: 48" diameter DW <br />2 <br />233-4432 <br />0 P 4x4x3x2 Extractor Valve W/O Cage <br />3 <br />Round Containment Collar Ath 48"x 48" DW Sump with 36" <br />Flexing 42" Raintight Composite Lightweight Manhole w/10" skirt & Cam Locks 83 <br />2 <br />418-1000am <br />Morrison 18" Limited Access Gasketed Bolted Manhole <br />Watertight Lid, Brine and FRP Bonding Kits <br />1 <br />Bravo D.W. Vapor Vent 3 Product FRP Containment Box for 3" Over 2" FRP Pir <br />1 <br />B501 -D-222 <br />6 Straps for 25K - I U dia. Tank <br />1 <br />EO -EBS <br />1 <br />3 <br />Deadmen 10'-25K <br />FE PETRO 2 HP Variable Speed/Length VL Sub Pump with 19" Riser <br />3 <br />1 <br />FePetro 5800300100 Variable Speed Controller <br />12 Turnbuckles for 25k - 1 D' dia tank <br />STP-DHI 5800300100 <br />FePetro Disp Hook Isolation Box (One Per Submersible) For up to 8 Dispensen 85 <br />4 <br />FG200-QMF-18 <br />Xerxes 10x10-10' Double Wall -Double Bulkhead Multi -Compartment Tank 91 1 Diesel <br />6 <br />FG200-MSQM-24 <br />Unisource 2"X24" Male Swivel x Quick -Fit Male <br />3 <br />1 10x10-10' Double WaIFDauble Bulkhead Multi-compart tank <br />Morrison2" Ball Valve 8/0 <br />10 <br />012030-626-0 <br />Smith FRP 3"AB2481Sump Penetration/Termination Fitting. 87 <br />1 1 Ox 10- 1 U DW -CT brine -interstice <br />1 <br />88 <br />2 <br />012040-626-0 <br />22" DW Manway with (3) 4" Manway Cover Fitting(s) (Half <br />1 <br />Bravo 3/4" FRP Rigid DW Electrical Sump Penetration Fitting AB2481 Use Witt g� <br />10 <br />Cplg.) <br />Robroy 3/4" Conduit. Okay for Sodium Chloride Brine and Propylene Glycol <br />91 <br />Bravo 400ml Dual Cartridge'Petro Seal' W/ 3 Mix Tips. Each kit handles 1 Dea E <br />4 4" Tank Wall Fitting, half coupling DW Double Wall Collar & Sump Package for 10x10- <br />PS -400 <br />92 <br />Penetrations <br />1 <br />10' DIN Com partment Tank <br />Double Wall Collar & Sump Package: 42" diameter OW <br />ENCORE 700S RETAIL DISPENSERS: 94 <br />Gilbarco Blending 3+0 S Series Three Product, Two Sided, Two Hose Dispel <br />Round Collar Containment with 42"x 48" DW Sump with <br />ENC700SNN1 <br />(Chip) Card Reader (1 10.4" color screen <br />Open Top, 32" Access, Brine and FRP Banding Kits <br />Gilbarco Blending 3+1 S Series Four Product, Two Sided, Four Hose Dispenser <br />4 <br />2 Double Wall Collar & Sump Package: 48" diameter DW <br />(Chip) Card Reader (1 10.4" color screen <br />Payment Options g6 <br />Round Containment Collar uth 48"x 48" DW Sump with 36" <br />Z-ENO-PCSCO2 <br />Global Contactless Module (GCM) 5j <br />6 <br />Z-EN7-PEPP01 <br />Watertight Lid, Brine and FRP Banding Kits <br />1 <br />10x10-10' Stnd Straps Set <br />1 <br />1Ox10-10' Deadmen <br />1 <br />10x10-10' Turnbuckles -16 <br />1 <br />Freight to Tracy, 10' (25k tank plus dead men) <br />1 <br />Freight to Tracy, ID' (10x10 tank plus deadmen) <br />1 <br />Freight to Tracy. CA -8' (deadmen if required to ship ahead of tank <br />TAN K HARDWAR E: <br />OPW 6571 Series Package Kit Including: <br />6571 EV RB-164042RT052 EVR Multipart. 42"Dia <br />61JSK-44CB EVR Jack Screw Ass. For Cast Iron Base Fills <br />61SALP-1020-EVR Fuel Swivel Adapter Low Profile, Bronze <br />634TT-7085,-EVR 4" Fill Cap <br />61 VSA- 1020-EVR Vapor Swivel Adapter, Bronze <br />2 <br />PK2-42RTMP-33 <br />1711T-7085-EVR 4" Vapor Cap <br />VPN4x7 4" Nipple 7" Long For Fill <br />FSA -400-S Short EVR Face Seal Adapter <br />H12806M 4"1e 5" Long For Vapor <br />8511-RB16 Riser Spacer 16' Center to Center <br />MPWS-33 Sump Shield for Sumps Lids Up to 32.5" Di <br />Page 2 of 6 <br />Northwest Pump Equipment Co. <br />J <br />0 <br />0 <br />0 <br />F1 0] <br />I I <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />,8 <br />a <br />19 <br />2 (d <br />21 <br />22 <br />23 <br />0 <br />24 <br />3fD <br />31 <br />32 <br />33 <br />34 <br />35 <br />510 <br />51 <br />52 <br />53 <br />COMPANY. <br />15 E Grant Line Road <br />DATE <br />PROJECT. <br />Edgewood Commercial Tracy <br />QTY <br />Part Number <br />DESCRIPTION <br />6 <br />CP-EBRVOG-00 <br />0 P 6571 Series Package Kit Including: 66 <br />Z-ENO-ISHGST <br />6 <br />6571 EVRL-164042RT051 EVR Single port, 42" Dia <br />6 <br />Freight <br />61JSK-44CB EVR Jack Screw Ass. For Cast Iron Base Fills <br />of Canisters by NWP from Veeder Raat. Naw Garb Certified. <br />2 <br />61SALP-1020-EVR Fuel Swivel Adapter Low Profile, Bronze <br />330160-004 <br />Veeder-Roet SEM Software Enhancement Module <br />634TT-7085-EVR 4" Fill Cap 68 <br />1 <br />PK3-42RTDI ESEL-33 <br />VPN4x7 4" Nipple 7" Long For Fill <br />Uninterruptible Power Supply. Media content will be managed by Outcast Media <br />when you want to mount the Pressure Sensor at the vent rack rather than in a dispenser. <br />FSA -400-S Short EVR Face Seal Adapter 69 <br />Veeder-Raot G-SitelPasspolt Dispenser Interface Module (DIM) <br />331063-025 <br />M PWS -33 Sump Shield for Sumps Lids Up to 32.5" Dia. 10 <br />329382-001N <br />Veeder-Root RS -232 Interface Module <br />C05223M Shroud Boot Cap To Isolate One FRP Cover Point jI <br />Page 5 of 6 <br />1 <br />23-0033 2" vent Cap <br />�2 <br />Cisco 4 -Port RV042 Firewall Router <br />10 g 5 <br />�3 <br />6 <br />D02575M <br />0 P 5 Gallon Shroud Boot <br />�4 <br />12 <br />H15188M <br />0 P Lower Clamp �5 <br />12 <br />H15190M <br />0 P Upper Clamp <br />GilbaShipping and Handling per Applause System <br />rco <br />12 <br />3 <br />71SO-41OCT <br />OPW EVR 4" Overfill Valve 2 Point 120" Upper 102" Lower <br />,8 <br />1 <br />723V-2203 <br />O PW 2" Thread -on, 3" we pres., 8" we vac. Garb Approved <br />,g <br />2 <br />C05223M <br />OPW Shroud Boot Cap To Isolate One FRP Cover Point <br />8� <br />2 <br />6511-RB16 <br />Pomeco Riser Spacer 16" Center to Center <br />81 <br />1 <br />233-4422 <br />0 P 4x4x2x2 Extractor Valve W/O Cage <br />82 <br />2 <br />233-4432 <br />0 P 4x4x3x2 Extractor Valve W/O Cage <br />3 <br />14U-RT4210CL <br />Flexing 42" Raintight Composite Lightweight Manhole w/10" skirt & Cam Locks 83 <br />2 <br />418-1000am <br />Morrison 18" Limited Access Gasketed Bolted Manhole <br />1 <br />Bravo D.W. Vapor Vent 3 Product FRP Containment Box for 3" Over 2" FRP Pir <br />1 <br />B501 -D-222 <br />Planter Area. Add $206.15 for Steel Plate Walk Area Unit <br />1 <br />EO -EBS <br />Bravo Electrical Offset For Bravo Vent Box S4 <br />3 <br />STPMRVS2-VL2-402725919 <br />FE PETRO 2 HP Variable Speed/Length VL Sub Pump with 19" Riser <br />3 <br />MAGVFC 5874202800 <br />FePetro 5800300100 Variable Speed Controller <br />3 <br />STP-DHI 5800300100 <br />FePetro Disp Hook Isolation Box (One Per Submersible) For up to 8 Dispensen 85 <br />4 <br />FG200-QMF-18 <br />Unisource 2" Quick Fit Male X Female 18" <br />6 <br />FG200-MSQM-24 <br />Unisource 2"X24" Male Swivel x Quick -Fit Male <br />3 <br />691-08001V <br />Morrison2" Ball Valve 8/0 <br />10 <br />012030-626-0 <br />Smith FRP 3"AB2481Sump Penetration/Termination Fitting. 87 <br />1 <br />88 <br />2 <br />012040-626-0 <br />Smith FRP 4"AB2481Sump Penetration/Termination Fitting. 89 <br />1 <br />Bravo 3/4" FRP Rigid DW Electrical Sump Penetration Fitting AB2481 Use Witt g� <br />10 <br />F-07RS-0-DF <br />Robroy 3/4" Conduit. Okay for Sodium Chloride Brine and Propylene Glycol <br />91 <br />Bravo 400ml Dual Cartridge'Petro Seal' W/ 3 Mix Tips. Each kit handles 1 Dea E <br />1 <br />PS -400 <br />92 <br />Penetrations <br />93 <br />Encore 700s Dispensers <br />ENCORE 700S RETAIL DISPENSERS: 94 <br />Gilbarco Blending 3+0 S Series Three Product, Two Sided, Two Hose Dispel <br />2 <br />ENC700SNN1 <br />(Chip) Card Reader (1 10.4" color screen <br />95 <br />Gilbarco Blending 3+1 S Series Four Product, Two Sided, Four Hose Dispenser <br />4 <br />ENC700SNL1 <br />(Chip) Card Reader (1 10.4" color screen <br />Payment Options g6 <br />6 <br />Z-ENO-PCSCO2 <br />Global Contactless Module (GCM) 5j <br />6 <br />Z-EN7-PEPP01 <br />Enc 700s (U Pi <br />6 <br />M15315KO07 <br />6 <br />Z-ENO-GCBS02 <br />6 <br />Z-ENO-HVBR00 <br />6 <br />Z-ENO-HVBRFO <br />6 <br />CP-EBRVOG-00 <br />6 <br />Z-ENO-ISHGST <br />6 <br />Veeder Root Call stil SO ComponentsIVST Hanging Hardware Terms: 50% down <br />6 <br />Freight <br />DMPANY. <br />2DJECT. <br />QTY PartNumber <br />DCM (Dispenser Communications Module) Kit <br />Call Button and Intercom Speaker <br />Balance Ready Vapor Recovery System installed on new units (except Flex Fue <br />units) <br />ISD Flow Meter (to be used with Balanced Vapor Recovery System) <br />Canopy (Brandview) <br />DuraMaxT"' Silver -tone Sheathing <br />Encore 2 Year Warranty (Standard) <br />Gilbarco Shipping and Handling per Dispenser <br />Page 3 of 6 <br />Northwest Pump Equipment Co. <br />DMI Y <br />CTY ='Ll rt', lrnb 3r <br />s 6OVSP-1001 <br />22 FG150•MQM-24 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />3 <br />2 <br />1 <br />3 <br />1 <br />1 <br />2 <br />1 <br />1 <br />1 <br />3 <br />848290-022-15D <br />329356-002 <br />329358-001 <br />329359-001 <br />329382-001N <br />330020-425 <br />846390-110 <br />886100-000 <br />846400-001 <br />848480-003 <br />330843-001 <br />330374-001 <br />794380-303 <br />790091-001 <br />79DO95-001 <br />305XPA-1100AK-EV R <br />1 332250-001 <br />13 330020-536 <br />1 <br />2 <br />1 <br />1 <br />3 <br />3 <br />1 <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />329356-004 <br />33DD20-480 <br />330020-485 <br />33DO20-488 <br />576008-657 <br />576008-649 <br />332310-003 <br />400137937 <br />847490-001 <br />Edgewood Commercial Tracy 1 <br />0 P 1" x 1 112" Popp et ed Vapor Shear Valve <br />Unisource 1.5" Hex Male x 1.5" Quick Fit male x 24" SS Connector <br />DATE Ol I.:0 Ii_ '•1 <br />0211 B121 <br />TLS350 Tank Monitor: <br />Veeder-Root TLS -350 Plus Tank Monitoring Console with Integral Printer. Use This Part <br />Number in Ca. Only When ISD 333760-203i NVMEM is Being Used. <br />Veeder-Root Four Input Probe Module Mounts in L" Power Comp- <br />Veeder-Root Eight Input Sensor Module - Mounts in Low Power Comp. <br />Veeder-Root Four Relay Output Module <br />Veeder-Root RS -232 Interface Module <br />Veeder-Root Module, Ethernet TCP/IP Communications TLS -350 Series Consoles <br />Veeder-Root 10.5' Mag PI usMa gnetostrictive Probe <br />Veeder-Rod Phase -Two Water Mag Plus Gas Probe Installation Kit S Cable <br />Veeder-Root Mag Plus Diesel Probe Installation Kit 5' Cable <br />Veeder-Raot PLLD Line Leak Detector with SwiftCheck Valve E85 Ok <br />Veeder-Root Six Input PLLD Module Mounts in Low Power Comp. <br />Veeder-R❑ot Three Output PLLD Module <br />Veeder-Roat Dual Point Hydrostatic Sensor for Brine Tanks wlcap <br />Veeder-Root Overfill Alarm <br />Veeder-Root Alarm AcknavAedgement Snitch <br />Veeder-R❑❑t Factory freight <br />Morrison4" Probe Cap and Ring Kits EVR <br />Veeder-Root Vacuum 1 Hydrostatic Monitoring for AB2481 <br />Y g <br />Veeder Root 7 Input Smart Sensor Module WEmPressure ressure Sensor For Vacuum <br />Sensor Monitoring & ISD For VR Carbon Canister. One spot required for the Vapor <br />Pressure Sensor and one for the canister valve and one for each Vapor Flow Sensor. <br />Mounts in Low Power Compartment. <br />Veeder-Root Hydrostatic Dispenser Sump Sensor Kit. Includes lea Mini -hydrostatic <br />Sensor, Dispenser Sump Sensor, 2 to 1 Sensor Input Box <br />Veeder-Root 8 Input Smart Sensor Module for VacuumlMag Sensors Mounts in Lory <br />r <br />Power Compartment. One of required for the Vapor Sensor and one for <br />P p q p <br />each Vapor Flow Sensor. <br />Veeder-Root Zea Vacuum Sensor Kit No Tank Support IE Brine Tanks <br />Veeder-Root 3ea Vacuum Sensor Kit No Tank Support IE Brine Tanks <br />Veeder-Root 1A" NPT 15ea Barbed Fittings <br />Veeder-Root 576006-657 Barbed Tee <br />Veeder-Root 3 Way Ball Valve <br />Veeder-Root 100' Vacuum Hose <br />FePetro Siphon Check Valve for Vacuum <br />Veeder-Root Expansion Module <br />15 E Grant Line Road DATE COMPANY: <br />Edgewood Commercial Tracy PROJECT: <br />DESCRIPTION QTY Part Number <br />6 <br />Veeder-Root Carbon Canister for ISD <br />Gilbarco Shipping and Handling per Dispenser to Ca Warehouse <br />Veeder-R❑ot Carbon Pressure Management System VV/ 2" Installation Kit Requires <br />861290 002 <br />V29 Software <br />2 <br />Veeder-Root Factory freight for Carbon Canister only <br />RE -501 <br />Bravo Canister Vent Rack for 1,2 or 3 vents, <br />VPC -2 <br />Brava One 2" Clamp w/Bolt. Nut & Washers <br />2 <br />Veeder Root Call stil SO ComponentsIVST Hanging Hardware Terms: 50% down <br />Includes on-site Applause server, software application, install kit and 1 year of A <br />payment required and balance due 10 days after invoice which will be upon receipt <br />1 <br />of Canisters by NWP from Veeder Raat. Naw Garb Certified. <br />2 <br />Veeder-Roat In -Station Diagnostics ISD <br />330160-004 <br />Veeder-Roet SEM Software Enhancement Module <br />1 <br />Veeder-RoH ISD Manuals & Vapor Pressure Sensor an d Housing -1 per site. For use <br />330020 630 <br />Applause TV with V -Net <br />Contract <br />Uninterruptible Power Supply. Media content will be managed by Outcast Media <br />when you want to mount the Pressure Sensor at the vent rack rather than in a dispenser. <br />330280-401 <br />Veeder-Raot G-SitelPasspolt Dispenser Interface Module (DIM) <br />331063-025 <br />Veeder-R❑ot G -Site 25' cable toTLS35OR & Installation Manual <br />329382-001N <br />Veeder-Root RS -232 Interface Module <br />2 <br />Page 5 of 6 <br />1 <br />Northwest Pump Equipment Co. <br />15 E Grant Line Road DATE COMPANY: <br />Edgewood Commercial Tracy PROJECT: <br />DESCRIPTION QTY Part Number <br />6 <br />PA0421100xxxx <br />Gilbarco Shipping and Handling per Dispenser to Ca Warehouse <br />4170648 <br />1 <br />BRKT-B2 <br />2 <br />Freight <br />Applause Media and Applause TV with V -Net For 700S <br />Im3 <br />6 <br />LD-ENE-QGEN3-Q104-KIT <br />2 <br />LU <br />Includes on-site Applause server, software application, install kit and 1 year of A <br />�4 <br />1 <br />LD -APP -REM -KIT <br />2 <br />10.4 Color Screen w/ 8 year <br />Software Maintenance Services. Pricing also include FlexPay Connect(DCM & E <br />105 <br />1 <br />CCL142-EMV <br />1 <br />Applause TV with V -Net <br />Contract <br />Uninterruptible Power Supply. Media content will be managed by Outcast Media <br />1fD6 <br />1 <br />OAS <br />OL -_UJ <br />length of the Outcast agreement at no additional cost. <br />1071 <br />2 <br />FS120KIT <br />1 <br />654632 <br />Cisco 4 -Port RV042 Firewall Router <br />10 g 5 <br />2 <br />2 <br />1146 <br />1 <br />4170648 <br />UPS 1 per site recommended <br />1 0 <br />2 <br />1312 <br />1312PID- <br />1 <br />Freight <br />GilbaShipping and Handling per Applause System <br />rco <br />12 <br />HW3X5 <br />UnBranded PX60 Passport <br />111 <br />12 <br />VR -A-800-952-5588 <br />Passport Combination (Cashier/ Manager) Work Station: <br />112 <br />12 <br />PID-PROP65 <br />Gilbarco Passport 420 SSD Combo Manager! Cashier Workstation with/ PAA All -in One Server i <br />1 <br />A 0 SSD V2D COMBO - <br />Pro Cap Touch Monitorw/SSDs/Enhanced Dispenser Hub 2 w/SSDs/ Install KrU Epson TM88 Recel <br />113 <br />12 <br />PID -203 <br />Cash Drawer/ Keyboard&Mouse/ 1st yr PLUS Service/ 12 month hardware warmnty:INCLUDES: IP <br />F 114 <br />12 <br />PID -D-43 <br />10 Licenes $ Activation Codes <br />1 <br />SW Modules <br />Core Suite: <br />1 <br />PA0421100xxxx <br />VeriFone Mx 915 Pin Pad WFG1 -Wells Fargo 351 Key- First Data/Con <br />1 <br />4170648 <br />UPS <br />1 <br />11passport Base Application Software Phillips 66 v20.O2 S70813200002FD <br />Passport Cashier Workstation <br />1 1A10 SSD v20 CASHIER <br />1 <br />PA0421100xxxx <br />1 <br />4170648 <br />1 <br />BRKT-B2 <br />2 <br />Freight <br />1 <br />HL-L2370DW <br />2 <br />HHP-1950GSR2EZ-2R <br />2 <br />LU <br />2 <br />MET132-019-01-A <br />1 <br />3328277 <br />2 <br />013180-20BS <br />2 <br />VF1546-13 <br />1 <br />O <br />1 <br />12 VSTAP-EVR-012 <br />12 VDVP-EVR-096 <br />12 VST-EVR-NBBK-2 <br />12 VSTA-EVR-SBKA <br />8 V34CPG-012-MRMR <br />8 V34CPG-102-MRMR <br />8 11B-0100 <br />8 8G-0100 <br />8 241TPS-0241 <br />8 66REC-1000 <br />6 <br />B8380 -D30 <br />16 <br />BK -8000 <br />6 <br />BRKT-B2 <br />22 <br />012030-626-0 <br />28 <br />BGS6072 <br />16 <br />1 GBH M P-5830 <br />Gilbarco Passport CashierWorkstatior with/ Px60 Server with 15"Pro Cap Touch Monitor/SSDs/ Ins <br />Epson TM88 Receipt Pnnter/ Cash Drawer! QWERTY Keyboard/ Mouse/ 1st yr PLUS Service/ 12 mr <br />hardware warranty: INCLUDES: Windows 10 Licenes $ Activation Codes <br />VeriFone Mx 915 Pin Pad 1n1FG1 -Wells Fargo 351 Key- First Data/Con <br />UPS <br />Passport Client Application Software <br />Misc. Item: <br />Gilbarco Shipping and Handling per Passport terminal <br />Report Printer -Brother Laser Jet <br />Xenon 2D Scanner <br />Includes:Rs-232 cable, Power Supply, Stand <br />Pin Pad Pedestal for Mx915- Locking, Swivel <br />11 Managed Switch EMV Switch <br />Tank Monitor Gender Mender Interfacing Tank Monitor to Passpo t <br />MX915 Cover- Protects from Spills, Bacteria, Dirt, Moisture - Easy to Clean <br />Optional 1st YR MTL (Material,Travel,Labor) one per Combo <br />optional 1st YR MTL (Material,Travel,Labor) one per Cashier WS <br />Dispenser Hardware <br />Balance Hanging Hardware <br />VST 12" Platinum Coaxial EVR Whip Hose <br />VST 8' Platinum Coaxial EVR Hose With Venturi <br />VST Coaxial EVR G2 Balance Nozzle Black <br />VST Reattachable Coaxial EVR Breakaway with Check Valve <br />Diesel Hanging Hardware <br />VST 314" x 12" M X M Green CP Whip Hose <br />VST 314" x 8'6" M X MCP Green CP Hose <br />0 P Diesel Nozzle (Green) Pressure Activated <br />0 P Green Splash Guard <br />O PW 3/4" Swivel <br />0 P 314" Reconnectable Breakaway <br />Island Hardware <br />Bravo 36" Encore DW Brine Dispenser Sump 213 Product. Includes EO-FRM A <br />Factory Freight <br />Bravo Product Shear Valve Bracket X & Y Axis Adjustable Bracket For B8000/E <br />Bravo Vapor Shear Valve Bracket <br />Smith FRP 3"AB2481Sump Penetration/Termination Fitting. <br />Flexing 6" x72" Bollard <br />OPW Double Poppet Shear Valve- Male <br />Page 4 of 6 <br />Northwest Pump Equipment Co. <br />15 E Grant Line Road <br />Edgewood Commercial Tracy <br />DESCRIPTION <br />Miscellaneous <br />LD 4 Layer Shield Kit for ENC700's ECIM 10.4" Display <br />Lens Defender Application and Removal Kit <br />Card Reader Cleaners For EMV Readers Pack of 40 <br />Overfill Alarm Sign <br />Emergency Shut-off Switch <br />Crind Paper 2 15/16'k3" Black Image Thermal Case of 24 <br />Veeder Root TLS350 Thermal Paper 2 1/4'k2 7/8" Case of 50 <br />PI Health Warning Decal <br />Nozzle Operation Decal w/CARB Contact Info <br />Decal Prop 65 Decal. Required in Ca <br />Warning: No Smoking, Stop Engine Decal <br />Decal Warning No Cell Phone <br />Page 6 of 6 <br />Northwest Pump Equipment Co. <br />DATE OF QUCTATION <br />02/16/21 <br />CONTRACTOR SUPPLIED FUEL SYSTEM EQUIPMENT <br />PRIMARY PIPING WITH CONTAINMENT SYSTEM SHALL BE RED THREAD IIA <br />AND RED THREAD II WITH FITTINGS AND D5-1000 AND DS -8000 SERIES <br />ADHESIVE <br />(*) NOTE WELL - THE EQUIPMENT LIST ON THIS SHEET IS INTENDED FOR <br />PERMIT PURPOSES. WHILE IT MAY PROVIDE A CONCEPTUAL <br />REPRESENTATION OF THE EQUIPMENT TO 5E INSTALLED, THE FUEL SYSTEM <br />CONTRACTOR SHALL CONSULT AND CONFIRM THE FINAL, APPROVED, <br />OWNER -VENDER EQUIPMENT LIST TO DETERMINE THE OWNER'S SUPPLIED <br />EQUIPMENT AND THE FUEL SYSTEM CONTRACTOR'S EXPECTED AND <br />REQUIRED ADDITIONAL MATERIALS, EQUIPMENT AND EQUIPMENT <br />MANUFACTURERS' CERTIFICATIONS AND APPROVALS FOR INSTALLATION <br />OF ALL OF THE FUEL SYSTEM RELATED WORK, INCLUDING ALL RELATED <br />ELECTRICAL COMPONENTS, TO PROVIDE A COMPLETE, WORKABLE FUEL <br />SYSTEM PER MANUFACTURERSAND CODE REQUIREMENTS. <br />ARC <br />~��40Qy�EL E t�n <br />.�C� C ALSO <br />� <br />� <br />Z to W <br />U <br />Z <br />6P <br />LLI <br />-4 <br />WW >N <br />J�X�OmdsF- <br />1010m <br />_OOzmc� <br />W X <br />w <br />V' <br />Z <br />Q 0-) <br />LU <br />tn0c�-4 <br />rV <br />W <br />(V <br />W <br />Q <br />X W rr <br />Z Z <br />W <br />O <br />co <br />N <br />0 <br />Q <br />OL -_UJ <br />4 m <br />W <br />O <br />Q <br />A <br />J <br />� <br />� <br />Z to W <br />}0UX <br />WVLL-N <br />LLI <br />-4 <br />WW >N <br />J�X�OmdsF- <br />- U <br />_OOzmc� <br />W X <br />U <br />w <br />I <br />Q 0-) <br />LU <br />rV <br />�6 <br />W <br />Q <br />Q) W <br />AEz <br />W <br />U <br />Q <br />J p <br />JW <br />D a M r Z m <br />0 L °100 1 <br />OV oo—) <br />1 <br />�01Wr �U� <br />WSW <br />OWN (L <br />13 LU (S z <br />V= <br />a � <br />LLI <br />-4 <br />nWn, <br />ll' <br />LU <br />r <br />W <br />' <br />`Q <br />W <br />co <br />N <br />II <br />CQ <br />W <br />O <br />Q <br />A <br />J <br />Q <br />J p <br />JW <br />D a M r Z m <br />0 L °100 1 <br />OV oo—) <br />1 <br />�01Wr �U� <br />WSW <br />OWN (L <br />13 LU (S z <br />V= <br />a � <br />UZ� <br />>QWW� <br />�w���� <br />N lfl <br />-1 0OWU <br />VW (V <br />W Z IE`��> �v @ <br />, I o IY <br />w o N <br />w W,LA� <br />W ., �0M T- 4 <br />~ W -W>-,4�3W O <br />a 2 �D ZT-E _1 t <br />z 0- -1 V o Z <br />W�� <br />��Wo(ya >- <br />(n L 1111 QOXOI- IL <br />0 w 0 <br />Wo T_ Z-4 <br />QWI(Y0 Q_ <br />wWdWw0 <br />liriiili�,rIIIIIn.I ulu 11111111 IIIIIIIIIIIIIIIII /III I)I 'I VI ���lu� <br />• O — <br />nWn, <br />ll' <br />W <br />Q <br />UZ� <br />>QWW� <br />�w���� <br />N lfl <br />-1 0OWU <br />VW (V <br />W Z IE`��> �v @ <br />, I o IY <br />w o N <br />w W,LA� <br />W ., �0M T- 4 <br />~ W -W>-,4�3W O <br />a 2 �D ZT-E _1 t <br />z 0- -1 V o Z <br />W�� <br />��Wo(ya >- <br />(n L 1111 QOXOI- IL <br />0 w 0 <br />Wo T_ Z-4 <br />QWI(Y0 Q_ <br />wWdWw0 <br />liriiili�,rIIIIIn.I ulu 11111111 IIIIIIIIIIIIIIIII /III I)I 'I VI ���lu� <br />• O — <br />