Laserfiche WebLink
MATERIAL AND WORKMANSHIP <br />1, UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL <br />EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK COVERED BY <br />THESE DOCUMENTS ARE TO BE NEW AND OF THE MOST SUITABLE GRADE FOR THE <br />PROCESS INTENDED. <br />2. CONTRACTOR SHALL NOT DEVIATE FROM MATERIALS OR PRODUCTS SPECIFIED <br />UNLESS THROUGH MUTUAL AGREEMENT WITH THE OWNER'S CONSTRUCTION MANAGER. <br />APPROVAL MUST BE IN WRITING, SIGNED BY OWNER'S CONSTRUCTION MANAGER. <br />SUBSTITUTE MATERIALS SHALL BE DESCRIBED, SPECIFYING ANY DIFFERENCE IN <br />COST AND PERFORMANCE. ONLY NEW MATERIALS SHALL BE USED. CONTRACTOR <br />SHALL BE CERTIFIED FOR THE INSTALLATION OF ALL EQUIPMENT AND MATERIALS <br />CONTAINED IN THIS PROJECT AND THEIR REQ'D. ANCILLARY COMPONENTS. <br />3. THE CONTRACTOR SHALL FURNISH TO THE OWNER'S REPRESENTATIVE FOR HIS <br />APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND OTHER <br />IDENTIFYING DATA AND INFORMATION RESPECTING THE PERFORMANCE, <br />CAPABILITY, NATURE, AND RATING OF THE MACHINERY, MECHANICAL AND OTHER <br />EQUIPMENT, MATERIAL OR ARTICLES WHICH THE CONTRACTOR CONTEMPLATES <br />INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S REPRESENTATIVE. <br />4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED WITHOUT <br />REQUIRED WRITTEN APPROVAL SHALL BE AT THE RISK OF SUBSEQUENT <br />REJECTION. <br />5, CONTRACTOR TO PROVIDE ALL MATERIALS NOT LISTED ON THE OWNER'S <br />SUPPLIED EQUIPMENT LIST, INCLUDING ELECTRICAL COMPONENTS, REQUIRED FOR <br />A COMPLETE, WORKABLE $ OPERATING FUEL STORAGE AND DISPENSING SYSTEM. <br />6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING, RECEIVING AND UNLOADING <br />THE ENTIRE OWNER'S SUPPLIED EQUIPMENT DELIVERED TO CONTRACTOR'S <br />WAREHOUSE, OR JOB SITE. THE SECURING OF EQUIPMENT REMAINS THE <br />CONTRACTOR'S RESPONSIBILITY UNTIL THE PROJECT RETAINAGE IS PAID, <br />CONTRACTOR TO DISTRIBUTE ALL RECEIVING DOCUMENTS TO THE OWNER'S <br />CONSTRUCTION MANAGER. <br />-1. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND <br />REGULATIONS. <br />O. ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS AND <br />THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE <br />OWNER'S REPRESENTATIVE. <br />9. IF ANY OF THESE DOCUMENTS INDICATE A CONFLICT WITH THE STATE OR LOCAL <br />REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS PROJECT, IT IS <br />EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) WOULD APPLY. <br />GENERAL CONDITIONS <br />1. CONTRACTOR EMPLOYEES SHALL HAVE COMPLETED 40 HOURS OCCUPATIONAL <br />SAFETY $ HEALTH ADMINISTRATION (OSHA) TRAINING COURSE PRIOR TO THE <br />START OF WORK. CERTIFICATION OF THIS MUST BE PROVIDED TO THE OWNER'S <br />REPRESENTATIVE PRIOR TO THE START OF WORK. <br />2. FUEL SYSTEM CONTRACTORS AND EMPLOYEE INSTALLERS SHALL HAVE ALL <br />CURRENTLY REQUIRED EQUIPMENT MANUFACTURERS' CERTIFICATIONS 4 APPROVALS <br />FOR INSTALLATION OF ALL OF THE FUEL SYSTEM RELATED WORK, INCLUDING FUEL <br />SYSTEM ELECTRICAL COMPONENTS, (INCLUDING, BUT NOT LIMITED TO TANKS, PIPING, <br />SUMPS, DISPENSERS, MONITORING, COMMUNICATIONS AND ELECTRICAL) AND SHALL <br />PROVIDE A COMPLETE, WORKABLE FUEL SYSTEM PER MANUFACTURERS' s CODES' <br />REQUIREMENTS, AND IN ACCORDANCE WITH, BUT NOT LIMITED TO, CALIFORNIA <br />UNDERGROUND STORAGE TANK (UST) REGULATIONS 4 CALIFORNIA AIR RESOURCES <br />BOARD (CARB)REQUIREMENTS. CERTIFICATES SHALL BE PROVIDED TO OWNER. <br />CONTRACTOR SHALL COMPLETE THE INSTALLATION CHECKLISTS SUPPLIED BY <br />MANUFACTURERS AND SHALL FURNISH THE CHECKLISTS TO OWNER. <br />3. CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: <br />A: GENERAL ENGINEERING (A) <br />B: HAZARDOUS MATERIAL SUBSTANCE HANDLING (HAZ) <br />4. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL <br />HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER AS <br />"ADDITIONAL INSURED" <br />A: STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY <br />B: GOMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE LIMIT OF NOT <br />LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY INJURY AND PROPERTY <br />DAMAGE. <br />C: AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED OR HIRED VEHICLES <br />WITH A COMBINED SINGLE LIMIT OF LIABILITY OF NOT LESS THAN $1,000,000 PER <br />OCCURRENCE FOR BODILY INJURY AND PROPERTY DAMAGE. <br />5. CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND SERVICES <br />NECESSARY FOR OR REASONABLY INCIDENTAL TO THE SATISFACTORY <br />COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR REQUIRED BY THE <br />DRAWINGS, EXCEPT AS NOTED AS SUPPLIED BY OWNER OR OTHERS. <br />ro. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CALIF. BUILDING <br />CODE, CALIFORNIA FIRE CODE, CALIFORNIA ELECTRICAL CODE, CALIFORNIA <br />UNDERGROUND STORAGE TANK REGULATIONS, OSHA CONSTRUCTION SAFETY <br />ORDERS, NATIONAL FIRE PROTECTION 4550C. (NFPA), UNDERWRITER'S <br />LABORATORIES, INC. (UL), GARB EXECUTIVE ORDERS AND GUIDANCE LETTERS <br />AND ANY OTHER APPLICABLE STANDARD OR STATE REGULATION, COUNTY OR <br />CITY ORDINANCES. <br />T ALL FUEL SYSTEM PERMITS TO BE SECURED BY THE CONTRACTOR, WHO IS <br />RESPONSIBLE FOR COMPLYING WITH ALL PERMIT CONDITIONS. CONTRACTOR <br />SHALL SECURE MISCELLANEOUS ELECTRICAL PERMIT UNLESS WORK IS COVERED <br />BY OTHER BUILDING PERMITS FOR THE PROJECT. <br />8. CONTRACTOR SHALL VISIT SITE AND FAMILIARIZE HIMSELF OF ALL EXISTING <br />CONDITIONS PRIOR TO START OF CONSTRUCTION. <br />S. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN UNLESS <br />NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR REPLACE TO THE <br />SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY EXISTING FACILITIES THAT <br />ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS. <br />10. CONTRACTOR SHALL KEEP THE SITE FREE OF WASTE AND RUBBISH AT ALL TIMES. <br />CONTRACTOR SHALL HAVE THE WORK AREA PROFESSIONALLY CLEANED THE DAY <br />BEFORE THE OWNER'S FINAL PROJECT INSPECTION. <br />11. WHEN AN INSTALLATION IS MADE AT AN EXISTING STORE, THE CONTRACTOR IS TO <br />SCHEDULE AND PERFORM HIS WORK SO AS NOT TO INTERFERE WITH THE NORMAL <br />STORE OPERATIONS. ALL DEBRIS, EXCESS EXCAVATION MATERIALS, MACHINERY <br />AND EQUIPMENT TO BE REMOVED AND MAINTAINED CLEAR OF THE DRIVEWAYS <br />THAT ARE IN USE EACH DAY AND LIGHTED BARRICADES SHALL BE PROVIDED <br />FOR THE PUBLIC'S PROTECTION. WHEN IT BECOMES NECESSARY TO CLOSE A <br />DRIVEWAY FOR MORE THAN 24 HOURS, THE CONTRACTOR WILL PROVIDE <br />TEMPORARY TRAVEL SERVICE FOR TRAFFIC. <br />12. A COPY OF THE SPECIFICATIONS AND DRAWINGS, ALONG WITH APPROVED SITE <br />PLAN, WITH AS -BUILT NOTATIONS, SHALL BE ON SITE AT ALL TIMES. <br />13. CONTRACTOR IS RESPONSIBLE FOR ANY PRODUCT IN TANKS AND IN LINES UNTIL <br />LOCATION OPENS OR REOPENS FOR GASOLINE BUSINESS. ANY PRODUCT LOSS <br />DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />PRIOR TOPROJECT ACCEPTANGE, THE OWNER SNA LL RECONCILE INVENTORY BY <br />COMPARING PRODUCT IN TANKS AND LINES TO AMOUNT DELIVERED. SHORTAGES <br />SHALL BE BILLED TO CONTRACTOR AT FULL RETAIL PRICE. <br />14. CONTRACTOR MUST PROVIDE ADEQUATE PROVISIONS TO MITIGATE RAIN DAMAGE <br />AND DELAYS (I.E. PUMPS, TARPS, ETC.). <br />15. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH <br />"AS -BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS" SHALL BE <br />COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON APPROVED JOB <br />COPY. <br />16. CONTRACTOR TO WARRANTY ALL WORKMANSHIP AND CONTRACTOR SUPPLIED <br />MATERIAL FOR I YEAR. THE OWNER SHALL PERFORM A 10 MONTH WARRANTY <br />INSPECTION TO EVALUATE CONTRACTOR PERFORMANCE AND QUALITY OF <br />WORKMANSHIP. CONTRACTOR MUST COMPLETE ALL PUNCH LIST ITEMS IDENTIFIED <br />DURING THIS 10 MONTH INSPECTION. <br />1-1. CONTRACTOR SHALL PROVIDE A LIST OF SUB -CONTRACTORS, IF ANY, WHO WILL BE <br />USED ON THE PROJECT, IF REQUIRED. <br />18. CONTRACTOR IS TO SCHEDULE ALL SUBCONTRACTORS, INCLUDING THOSE <br />CONTRACTED DIRECTLY WITH THE OWNER'S CONSTRUCTION MANAGER. THE OWNER <br />WILL PROVIDE A LIST OF SUBCONTRACTORS, CONTACTS AND PHONE NUMBERS, <br />FOR THOSE SUBCONTRACTORS THAT HAVE CONTRACTS DIRECTLY WITH THE <br />OWNER, <br />19. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND <br />OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES REQUIRED TO <br />RUN THE FACILITY. <br />20. CONTRACTOR SHALL PLACE THE HIGHEST PRIORITY ON SAFETY AND HEALTH <br />DURING THE PROGRESS OF WORK PERFORMED AT THE OWNER'S STORE <br />LOCATIONS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE <br />AND MAINTAIN A SAFE WORKING ENVIRONMENT FOR ITS EMPLOYEES DURING THE <br />PROGRESS OF WORK AND TO PROTECT THE HEALTH AND SAFETY OF <br />CONTRACTOR'S AGENTS, SUBCONTRACTORS, THE PUBLIC AND ANY THIRD PARTIES. <br />ALL TOOLS, MATERIALS, EQUIPMENT, FACILITIES AND OTHER ITEMS USED BY THE <br />CONTRACTOR AND PRACTICES EMPLOYED BY THE CONTRACTOR IN <br />ACCOMPLISHING THE WORK ARE CONSIDERED TO BE PART OF THE WORKING <br />ENVIRONMENT. <br />21. CONTRACTOR TO KEEP ON SITE MATERIAL SAFETY DATA SHEETS (MSC)5) FOR <br />CHEMICAL COMFOUNID5 REGULATE]--) THROUGH U.S.E P.A. THAT WILL BE USED <br />ON-SITE OR HAS THE POTENTIAL FOR HUMAN CONTACT (I.E., GASOLINE, DRY ICE, <br />SOLVENTS, GLUES, ETC.) <br />22. WHILE ON SITE AND DURING WORKING HOURS, CONTRACTOR'S PERSONNEL MUST <br />WEAR SHIRTS, LONG PANTS, HARD HATS WHEN REQUIRED, AND ACCEPTABLE FOOT <br />WEAR PER OSHA, REGULATIONS. <br />23. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK AND <br />EQUIPMENT INSTALLATION PRIOR TO THE START OF WORK. CONTRACTOR WILL <br />CONDUCT WEEKLY JOB SITE SAFETY MEETINGS WITH ITS EMPLOYEES AND THE <br />MEETING MINUTES WILL BE SUPPLIED TO OWNER. <br />24, SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE DURATION <br />OF THE CONTRACT A SITE HEALTH 4 SAFETY PLAN (SAFETY PLAN) THAT WILL <br />EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, AND: <br />A: APPOINT AN EMPLOYEE AS THE SAFETY OFFICER WHO IS QUALIFIED AND <br />AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SAFETY PLAN. <br />SUBMIT THE NAME AND QUALIFICATIONS OF THE SAFETY OFFICER TO THE OWNER'S <br />REPRESENTATIVE PRIOR TO COMMENCING WORK ON THE SITE. <br />B: THE SAFETY PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE <br />NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES NEAREST <br />THE SITE, AND A MAP TO THE HOSPITAL. PROCEDURES SHALL BE WRITTEN IN THE <br />SAFETY PLAN FOR ACTIONS TO BE TAKEN SHOULD STRANGE ODORS OR <br />HAZARDOUS SUBSTANCES BE UNCOVERED. <br />C. IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP OR ARE <br />ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE CONDITION. IF THE <br />CORRECTIVE ACTION IS INSUFFICIENT IN THE OPINION OF THE OWNER'S <br />REPRESENTATIVE, CONSTRUCTION WORK SHALL CEASE UNTIL CORRECTIVE ACTION <br />CAN BE IMPLEMENTED. <br />D: PROVIDE A MINIMUM OF TWO FIRE EXTINGUISHERS WITH A MINIMUM CLASS <br />RATING OF 2 -A20 -5:C WITHIN 50 FEET OF THE OPERATION. <br />25. UNDERGROUND SERVICE ALERT (U.S.A.) - THE CONTRACTOR SHALL NOTIFY <br />MEMBERS OF U.S.A. AT LEAST 2 FULL WORKING DAYS (BUT NOT MORE THAN 14 DAYS) <br />IN ADVANCE OF PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE <br />ONE -GALL PROGRAM NUMBER 8-1-1 OR (800) 22-1-2(o00. <br />EXCAVATION <br />I. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND STATE <br />REGULATIONS. THE CONTRACTOR IS REFERRED TO THE OSHA BOOKLET, <br />"EXCAVATING AND TRENCHING OPERATIONS", FOR A SAFE WORK PRACTICES GUIDE <br />FOR PERFORMING EXCAVATION WORK. <br />2. EXCAVATION SHALL BE SIZED PER TANK MANUFACTURER'S GUIDELINES. PIPELINE <br />TRENCHING SHALL BE PER PIPELINE MANUFACTURER'S GUIDELINES <br />3. THE OWNER RESERVES THE RIGHT TO DESIGN AND/OR CONSTRUCT SHORING UNDER <br />AN AMENDED AGREEMENT WITH CONTRACTOR OR SEPARATELY WITH ANOTHER <br />COMPANY, IF THE OWNER ENGAGES CONTRACTOR, CONTRACTOR SHALL SUBMIT <br />SHORING DESIGN TO THE OWNER'S CONSTRUCTION MANAGER FOR APPROVAL. <br />SUPPLEMENTAL JOB SCOPE AND COST SHALL BE AGREED TO IN TERMS OF A <br />CONTRACT CHANGE ORDER PRIOR TO COMMENCING WORK. SNORING SHALL BE <br />REMOVED PRIOR TO INSTALLING PRODUCT PIPING UNLESS APPROVED BY THE <br />OWNER'S CONSTRUCTION MANAGER TO ABANDON IN PLACE. <br />4. UNSTABLE SOILS MAY BE REQUIRED TO HAVE A FILTER FABRIC EXCAVATION <br />LINER. CONSULT BID DOCUMENTS OR THE OWNER'S CONSTRUCTION MANAGER FOR <br />SPECIFIC INFORMATION REGARDING THIS ISSUE. <br />5. MINIMIZE SURFACE WATER ENTERING EXCAVATIONS BY CONSTRUCTING DIVERSION <br />DAMS AROUND TANKFIELD EXCAVATION AND PIPING TRENCHES. <br />6. A CONTINGENCY PLAN SHALL BE DEVELOPED WITH THE OWNER'S CONSTRUCTION <br />MANAGER OUTLINING EMERGENCY PROCEDURES FOR OBTAINING THE NECESSARY <br />EQUIPMENT AND/OR PERSONNEL TO HANDLE UNEXPECTED WATER ENTRY INTO THE <br />TANK FIELD EXCAVATION OR PIPING TRENCHES. WHEN WATER MAY CONTAIN <br />HYDROCARBONS, CONSULT THE OWNER'S CONSTRUCTION MANAGER PRIOR TO <br />REMOVING IT FROM SITE. <br />FUEL SYSTEM WORK SCOPE <br />1. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND SCHEDULE <br />THAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF THE PROJECT TO THE <br />FULLEST EXTENT POSSIBLE. <br />2. CONTRACTOR SHALL COORDINATE DELIVERY DATE OF TANKS WITH THE <br />MANUFACTURER, THE OWNER'S CONSTRUCTION MANAGER, AND THE PROJECT <br />SCHEDULE. <br />3. CONTRACTOR TO PROVIDE (o' CHAIN LINK SECURITY FENCING AND BARRICADES <br />DURING ALL CONSTRUCTION PHASES, OR AS DIRECTED BY THE OWNER'S <br />CONSTRUCTION MANAGER. POST "KEEP OUT" SIGNS ON FENCE EVERY 30 FEET. AT <br />THE END OF EACH WORK DAY SECURE FENCING PANELS TOGETHER. <br />4. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW FUEL EQUIPMENT, TANKS, <br />PIPING, FUEL SYSTEM CONDUITS, AND ANCILLARY FUEL SYSTEM COMPONENTS. <br />5. WHEN SOIL IS TO BE STOCKPILED ON SITE FOR SAMPLING PRIOR TO OFF -HAUL, <br />FUEL SYSTEM CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL <br />COVER WITH 4 MIL. PLASTIC UNTIL SOIL IS REMOVED, IN AREA TO BE APPROVED <br />BY OWNER / GENERAL CONTRACTOR (G.C.). G.C. SHALL PROVIDE FOR <br />DISTRIBUTION OF ALL EXCAVATED SOIL, PER GENERAL PROJECT REQUIREMENTS. <br />6. INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES, WHERE <br />REQUIRED BY WET -HOLE OR UNSTABLE SOIL CONDITIONS. INSTALL TANK <br />HOLD-DOWNS IF STATED AS INCLUDED BY THE DRAWINGS. <br />T. THE OWNER'S CONSTRUCTION MANAGER SHALL WITNESS PRE -INSTALLATION TANK <br />TESTING. CONTRACTOR SHALL NOTIFY THE OWNER'S CONSTRUCTION MANAGER TWO <br />WORKING DAYS PRIOR TO TESTING AND TANK INSTALLATION. <br />8. TANK MANUFACTURER'S INSTALLATION PROCEDURE SHALL BE FOLLOWED, AND THE <br />INSTALLATION CHECKLIST SHALL BE INITIALED/SIGNED BY CONTRACTOR AND THE <br />OWNER'S CONSTRUCTION MANAGER, AS APPROPRIATE, AS EACH STEP IS <br />COMPLETED. <br />9. AN UNDERGROUND EQUIPMENT INSTALLATION AFFIDAVIT SHALL BE FILLED OUT BY <br />CONTRACTOR AND SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER IN <br />BOUND PROJECT CLOSE OUT FOLDER. <br />10, CONTRACTOR TO PROVIDE REQUIRED TEST MANIFOLDS PER MANUFACTURER'S <br />NSTRUCTIONS AND SPECIFICATIONS. PRESSURE GAUGES SHALL BE IN GOOD <br />REPAIR AND HAVE A CALIBRATION DATE WITHIN 30 DAYS OF USE. PRESSURE <br />GAUGES DAMAGED OR OUT OF CALIBRATION WILL NOT BE PERMITTED. <br />11, THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR PROPER HANDLING AND <br />INSTALLATION OF THE UNDERGROUND STORAGE TANKS AND SHALL ENSURE THAT <br />GOOD WORKMANSHIP PRACTICES AND CONSTRUCTION PROCEDURES ARE <br />FOLLOWED REGARDLESS OF THE INCLUSION OR OMISSIONS OF ANY APPLICABLE <br />SUGGESTIONS IN THESE INSTRUCTIONS. <br />12. UNKNOWN SITUATIONS OR CONDITIONS NOT COVERED IN THESE AND THE <br />MANUFACTURER'S INSTRUCTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR. <br />MANUFACTURER'S SPECIALISTS ARE AVAILABLE FOR CONSULTATION. THE <br />PRESENCE OF THE OWNER'S CONSTRUCTION MANAGER OR THE MANUFACTURER'S <br />OBSERVER AT ANY INSTALLATION SITE DOES NOT RELIEVE THE CONTRACTOR OF <br />NIS RESPONSIBILITY FOR THE PROPER INSTALLATION OF THE TANKS OR OTHER <br />EQUIPMENT. <br />13, TANKS SHALL BE PLACED ACCORDING TO THE TANK MANUFACTURER'S <br />INSTALLATION MANUAL AND THE OWNER'S TANK DRAWINGS. PLEASE NOTE THAT IF <br />THE SOIL IS UNSTABLE, THE STANDARDS MAY BE INCREASED. DISTANCE BETWEEN <br />TANKS SHALL BE GOVERNED BY MANUFACTURER'S OR STATE AND LOCAL <br />REQUIREMENTS, WHICHEVER IS GREATER. <br />14. TANKS ARE TO BE SET LEVEL AND BACKFILLED TO TOP OF TANK THE SAME DAY <br />AS TESTING. <br />15. INSTALL TANK TRIM 4 EQUIPMENT PER DRAWINGS AND CURRENT MANUFACTURER'S <br />INSTRUCTIONS, WHICH SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE <br />PRECEDENCE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL <br />BE COMPLETED BY THE FUEL SYSTEM CONTRACTOR AS EACH STEP IS COMPLETED. <br />TESTING SHALL CONFORM TO MANUFACTURER'S REQUIREMENTS. OWNER'S <br />REPRESENTATIVE SHALL WITNESS ALL TANK TESTING AT NIS/HER DISCRETION. <br />10. FUEL SYSTEM CONTRACTOR TO INSTALL NEW ELECTRICAL SYSTEMS PER PLANS & <br />MANUFACTURERS' REQUIREMENTS. ARRANGE FOR ALL INSPECTIONS. PROVIDE ALL <br />CONDUITS, CONDUCTORS, J -BOXES, SEAL -OFFS, ETC. REQUIRED FOR FUEL SYSTEM'S <br />ELECTRICAL SYSTEMS. THE FUEL SYSTEM'S ELECTRICAL SYSTEMS INCLUDE, BUT <br />ARE NOT LIMITED TO, HIGH 4 LOW VOLTAGE POWER, MONITORING 4 COMMUNICATIONS <br />(INTERCOM 8 CONTROL) REQUIREMENTS. <br />1-1. INSTALL EQUIPMENT AS LISTED IN OWNER'S EQUIPMENT LIST AND PROVIDE AND <br />INSTALL ALL OTHER EQUIPMENT AS REQUIRED TO PROVIDE A COMPLETE AND <br />WORKABLE FUELING SYSTEM. <br />18, PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY <br />CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S INSTRUCTIONS <br />SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE PRECEDENCE OVER OTHER <br />INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL BE COMPLETED BY THE <br />FUEL SYSTEM CONTRACTOR, AS EACH STEP IS COMPLETED. <br />A. FIBERGLASS REINFORCED PLASTIC (F.R.P.) PIPING: PRIMARY PIPING WITH <br />CONTAINMENT SYSTEM SHALL BE RED THREAD IIA AND RED THREAD II WITH <br />FITTINGS AND DS -1000 AND DS -8000 SERIES ADHESIVE. <br />DO NOT MIX <br />DIFFERENT MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT SYSTEMS <br />SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT SYSTEM SHALL BE <br />BY THE SAME MANUFACTURER, WITH THE SAME SERIES ADHESIVES AND/OR <br />FITTINGS. <br />B: VENT/VAPOR PIPING: SAME AS F.R.P. PIPING, A. <br />C: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE 40, OR <br />EXTRA STRONG. GALVANIZED PIPE IS NOT ALLOWED. FITTINGS SHALL BE 300 PSI <br />MALLEABLE IRON. <br />D: ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT WHICH <br />SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FULL COMPATIBILITY <br />WITH THE PIPING MATERIAL USED, AND FOR USE WITH FUEL SYSTEM SOLVENTS, <br />FUELS, OILS, DIESEL, AND 100% METHANOL, WHICH SHALL BE VERIFIED BY <br />CURRENT MANUFACTURER'S PRODUCT DATA SHEET. <br />E= ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20 MIL. PVC <br />PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL TAPES, AND SHALL <br />BE BY THE SAME MANUFACTURER AS THE WRAP. <br />F: CONTRACTOR SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL <br />MATERIALS ARE NEW AND CONFORM TO ABOVE SPECS, IF REQUIRED. <br />1S. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER TANKS <br />SHALL BE MINIMIZED. MAINTAIN MINIMUM CLEARANCE AS REQUIRED BY <br />MANUFACTURER. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING IS NOT <br />SHOWN ON SITE PLAN, CONTRACTOR SHALL RUN LINES THE MOST DIRECT ROUTE <br />SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. <br />20. PROVIDE AND INSTALL ALL CONDUIT, CONDUCTORS, J -BOXES, SEAL -OFFS, ETC., FOR <br />FUEL SYSTEM(S)A& INDICATED OR REQ'D, FOR A COMPLETE, WORKABLE SYSTEM. <br />21. ALL CONDUIT IS TO BE 3/4" (MINIMUM). <br />22. INSTALL NEW MONITORING COMPONENTS PER DRAWINGS AND EQUIPMENT LIST, AND <br />SUPPLY 4 INSTALL ADDITIONAL COMPONENTS AS REQUIRED FORA COMPLETE AND <br />WORKABLE SYSTEM. <br />23. INSTALL DISPENSERS AND MISCELLANEOUS FUELING SYSTEMS, AS INDICATED ON <br />PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST. <br />24. SUPPLY 8 INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER FUELING <br />SYSTEM CONCRETE AS INDICATED ON FUEL SYS. SITE PLAN. CONCRETE SHALL <br />HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 3500 PSI (W/O SPECIAL <br />INSPECTION). CONCRETE DESIGN SHALL OTHERWISE COMPLY WITH CIVIL/ARCH <br />DOCUMENTS. G.C. SHALL COORDINATE CONCRETE SLAB WORK W/ FUEL SYSTEM <br />CONTRACTOR OR FUEL SYSTEM SUBCONTRACTOR. <br />DISPENSERS <br />I. PURGE THE AIR FROM THE PIPING SYSTEM USING INDUSTRY STANDARD PRACTICES <br />AND A GROUNDED CONTAINER APPROVED FOR STORAGE AND HANDLING CLASS I <br />FLAMMABLE LIQUIDS. <br />2. DISPENSERS SHALL BE SECURELY ATTACHED TO ANCHOR BOLTS WHICH SHALL <br />BE SET IN CONCRETE ISLANDS. EXPANSION BOLTS MAY ONLY BE USED WITH THE <br />WRITTEN APPROVAL OF THE OWNER'S CONSTRUCTION MANAGER. QUANTITY AND <br />SIZE OF ANCHOR BOLTS SHALL BE AS SPECIFIED IN DISPENSER MANUFACTURER'S <br />INSTALLATION INSTRUCTIONS. THE DISPENSERS ARE TO BE INSTALLED LEVEL AND <br />ARE TO BE CAULKED WITH A GRAY SILICONE AT ISLAND/DISPENSER INTERFACE. <br />3. DISPENSERS SHALL BE ACTIVATED ONLY IN PRESENCE OF AN AUTHORIZED <br />DISPENSER REPRESENTATIVE. CONTRACTOR HAS SOLE RESPONSIBILITY FOR <br />DAMAGE TO DISPENSER(S) IF THIS INSTRUCTION IS NOT FOLLOWED. <br />4. CONFIRM DISPENSER OPERATIONS (STP ISOLATION, BRAND PANELS, DECALS AND <br />NOZZLES MATCH, ETC.). IF MISCONNECTIONS OR OTHER PROBLEMS ARE DETECTED <br />DURING CONFIRMATION OF DISPENSER OPERATIONS MAKE CORRECTIONS AND <br />REPEAT DISPENSER CHECK-OUT PROCEDURE. <br />5. CALIBRATE AND SEAL METERS PER LOCAL REGULATIONS. ANY RE -CALIBRATION <br />REQUIRED TO OBTAIN APPROVAL FROM LOCAL REGULATORS SHALL BE <br />CONTRACTOR'S RESPONSIBILITY. <br />6. CONTRACTOR TO FURNISH AND INSTALL NEW DISPENSER FILTERS AFTER <br />COMPLETING ALL LIQUID TESTING AND PRODUCT LINE PURGING. ACTIVATE EACH <br />PRODUCT ON EACH DISPENSER AND INSPECT FILTER FOR LEAKS. RECHECK <br />PRIMARY LINE CONNECTIONS AT DISPENSER BASE AND STP FOR LEAKS. <br />-1. CONTRACTOR SHALL PERFORM START-UP IF APPROVED BY THE DISPENSER/POS <br />MANUFACTURER. IF CONTRACTOR IS NOT APPROVED BY THE DISPENSER/POS <br />MANUFACTURER, THEN AN AUTHORIZED CONTRACTOR SHALL BE SUBCONTRACTED <br />TO PERFORM START-UP. CONTRACTOR SHALL ALSO PROVIDE AN AUTHORIZED <br />SERVICE TECHNICIAN TO PROVIDE UP TO 8 HOURS OF ON-SITE TRAINING FOR <br />STORE PERSONNEL. CONTRACTOR IS RESPONSIBLE FOR START-UP AND <br />CALIBRATION OF FUELING SYSTEMS. COSTS MUST BE INCLUDED IN CONTRACTOR'S <br />BASE BID. <br />8. CONTRACTOR SHALL PROVIDE AND INSTALL PUMP NUMBERS, OCTANE DECALS, NO <br />SMOKING DECALS AND EMERGENCY SHUT-OFF SIGNS, PER THE OWNER'S IMAGE <br />GUIDELINES AND ALL APPLICABLE CODES AND REGULATIONS. CONTRACTOR <br />SHALL INSTALL ALL OWNER PROVIDED DECALS, PUMP TOPPERS AND WINDSHIELD <br />CADDIES/TRASH CANS PRIOR TO FINAL PROJECT ACCEPTANCE. <br />9. CONTRACTOR TO FURNISH AND INSTALL FIRE EXTINGUISHERS AND APPROPRIATE <br />DECALS PER APPLICABLE REGULATIONS. <br />TESTING <br />1. OWNER'S REPRESENTATIVE SHALL WITNESS ALL TESTING AT NIS/HER DISCRETION. <br />CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE AT LEAST TWO DAYS <br />PRIOR TO ANY TESTING, IN WRITING. <br />2. ALL TESTING SHALL COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND <br />REQUIREMENTS, TRADE STANDARDS AND GOVERNING RULES AND CODES, <br />INCLUDING THE USE OF CERTIFIED AND APPROVED INDEPENDENT THIRD PARTY <br />TESTERS, WHEN REQUIRED. <br />3. FINAL TESTING SHALL BE CONDUCTED BY A THIRD PARTY TESTING COMPANY <br />SUBCONTRACTED TO THE FUEL SYSTEM CONTRACTOR. TESTING METHODS MUST BE <br />APPROVED BY THE OWNER'S CONSTRUCTION MANAGEMENT AND CONFORM TO ALL <br />REGULATIONS AND CODES. FUEL SYSTEM CONTRACTOR SHALL SCHEDULE AND <br />COORDINATE THE TESTING CONTRACTOR ALONG WITH ANY LOCAL INSPECTIONS <br />REQUIRED TO OPEN THE SITE/STORE. FUEL SYSTEM CONTRACTOR SHALL HAVE A <br />REPRESENTATIVE ON-SITE DURING ALL TESTING. <br />4. ANY COSTS ASSOCIATED WITH FAILED TESTS AND SUBSEQUENT REPAIRS / <br />RE -TESTS WILL BE THE CONTRACTOR'S RESPONSIBILITY. CONTRACTOR MUST USE <br />AND PAY THE OWNER'S TESTING COMPANY FOR ANY RE -TESTS. <br />5. CONTRACTOR MUST OBTAIN A COPY OF ALL TEST REPORTS FROM TESTING <br />COMPANY TO BE SUBMITTED WITH THE PROJECT CLOSE-OUT REQUIREMENTS. <br />6. FULLY TEST ALL SYSTEMS, AND REPAIR AS NECESSARY. SECURE ALL REQUIRED <br />TESTS, INSPECTIONS, AND APPROVALS OF THE COMPLETED SYSTEM. MAKE ALL <br />REQUIRED ADJUSTMENTS AND CORRECTIONS. DO NOT BACKFILL TRENCHES OR <br />TANK TOP UNTIL AUTHORIZED BY OWNER'S REPRESENTATIVE. <br />-1. CONTRACTOR SHALL PROVIDE ENHANCED (E.L.D.) LEAK DETECTION TEST ON <br />SYSTEM AFTER PAVING IS COMPLETE AND PRIOR TO FINAL PROJECT <br />ACCEPTANCE. TEST SHALL BE CONDUCTED BY A CERTIFIED TESTER. <br />CONTRACTOR SHALL PROVIDE WRITTEN REPORT OF E.L.D. TEST TO OWNER'S <br />REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF PROJECT. <br />8. PROVIDE A STATIC PRESSURE PERFORMANCE TEST, ACCORDING TO THE CARE <br />PROCEDURE TP -201, IN ACCORDANCE WITH APPROPRIATE EXECUTIVE ORDER <br />(EO) VR -204-x (Z), OR AS REQUIRED BY LOCAL REGULATIONS. <br />S. PROVIDE DOCUMENTATION OF A DYNAMIC BACK PRESSURE TEST OF ALL VAPOR <br />RETURN LINES ACCORDING TO GARB PROCEDURE TP -201, IN ACCORDANCE WITH <br />APPROPRIATE EO VR -204-x (Z), OR AS REQUIRED BY LOCAL REGULATIONS. <br />10. PROVIDE LIQUID REMOVAL TEST USING EO VR -204-x (Z). <br />11. PROVIDE STATIC TORQUE TEST OF ROTATABLE PHASE I ADAPTERS ACCORDING <br />TO CARE PROCEDURE TP -201, IN ACCORDANCE WITH APPLICABLE EO. <br />12. PROVIDE LEAK RATE TEST OF OVERFILL PREVENTION DEVICE ACCORDING TO <br />GARB PROCEDURE TP -201. <br />13. PROVIDE LEAK RATE TEST OF PRESSURE/VACUUM VENT VALVES ACCORDING TO <br />GARB PROCEDURE TP -201. <br />14. PROVIDE ALL OTHER TESTING, CERTIFICATIONS AND DOCUMENTATION AS <br />REQUIRED BY STATE AND LOCAL REGULATIONS, MANUFACTURER REQUIREMENTS, <br />AUTHORITIES TO CONSTRUCT, CARE EXECUTIVE ORDERS AND APPROVAL LETTERS, <br />INCLUDING REQUIREMENTS OF VERIFICATION AND REVERIFICATION TESTING AFTER <br />SYSTEM OPERATION BEGINS AND AFTER STATUTORY OPERATIONAL INTERVALS <br />REQUIRED AS PART OF THE INSTALLATION REQUIREMENTS OF THE FUELING SYSTEM, <br />INCLUDING (BUT NOT LIMITED TO): PRECISION TANK / LINE, SB SSS, AIR QUALITY <br />(PER EXECUTIVE ORDERS FOR SYSTEM INSTALLED) AND A FULL MONITORING <br />CERTIFICATION (INCLUDING LEAK DETECTOR AND SPILL CONTAINER TESTING). <br />15, ALL TESTING SHALL BE CONDUCTED IN THE PRESENCE OF LOCAL CUPA / FIRE <br />DEPT. REPRESENTATIVE, AND INSPECTIONS SHALL BE COORDINATED THROUGH <br />THE PHONE IN OR ON-LINE SYSTEMS IN ADVANCE OF INSPECTION REQUESTS. <br />CONTRACTOR ON THIS SHEET MEANS THE FUEL SYSTEM CONTRACTOR. <br />GENERAL CONTRACTOR (G.C.) ON THIS SHEET MEANS THE OWNER'S G.C. FOR THE <br />SITE / PROJECT, IF IT IS OTHER THAN THE FUEL SYSTEM CONTRACTOR. <br />/� ARc�\ <br />tp;A NO. C 88884 ti <br />REN. 3-31-$3 <br />\0 CAL��/ <br />W (P <br />w(pUX \s) <br />WV�'�U��� <br />W U N� <br />J�Omy- <br />U <br />LLI = Z <br />� T t 0 <br />VQWQ)w <br />Q) n <br />Q) W <br />�Z <br />. W <br />� � U <br />n <br />J o <br />JW <br />®Q� D zm <br />OLL �m <br />00 <br />=.4z� <br />� LLI T- <br />W2W <br />WOQ <br />V= <br />a � <br />�Q <br />�t <br />} <br />W <br />fy <br />LLJ <br />Z <br />CQ <br />W <br />O <br />n <br />i�-- <br />n <br />J o <br />JW <br />®Q� D zm <br />OLL �m <br />00 <br />=.4z� <br />� LLI T- <br />W2W <br />WOQ <br />V= <br />a � <br />�Q <br />�t <br />} <br />W <br />fy <br />LLJ <br />n <br />OF 10 'FET" SHEETS <br />