Laserfiche WebLink
Comments for PA 0800005 (UP) <br />1. The Project description indicates that is being submitted in the form of a Transfer Processing <br />Report (TPR) format and includes a Report of Compost Site Information (RCSI) document. The <br />two documents are being evaluated as a proposed project description only. The documents will <br />require further review during the Solid Waste Facility Permit (SWFP) process. <br />2. The project description indicates on Page ES -7, that the facility will operate 24 hours per day. <br />The document does not include an analysis for impacts from noise and lighting. Provide an <br />analysis of the impacts regarding noise and lighting. <br />3. The project description proposes to increase hours of operation, vehicle traffic, tonnage and <br />building size. The discussion regarding facility design is not adequate. The proposed increases in <br />waste and traffic volumes are 2.5 and 3 times the existing approved volumes. The increase in <br />floor space or building size is not quite 50 percent of the existing building. The EHD has <br />concerns that the facility operating at full capacity would not be able to safely handle the waste. <br />a. Vehicle traffic; the project description indicates that the facility is proposing to increase <br />vehicle traffic from 560 vehicle trips to 1727 vehicle trips per day. The site is confined <br />and the tipping area is small. <br />1. Provide calculations that show the number of vehicles that can safely unload at <br />each of the tipping areas onsite. <br />2. Provide information showing traffic patterns. <br />3. Provide anticipated vehicle quelling time through the scales and tipping area. <br />b. The proposed project description mentions that the additional hours of operation will <br />allow the facility to handle additional vehicles. This is true to a point. Vehicles that arrive <br />at the facility are not evenly spaced and tend to show up at approximately the same time. <br />1. Indicate the area designated for vehicle quelling and explain how the area will <br />accommodate the expected vehicle traffic. <br />2. Discuss the anticipated number of vehicles per hour <br />c. Tonnage; the project description proposes to increase the per day tonnage by 2.5 times <br />the current tonnage. The design calculation does not discuss the amount of equipment <br />that would be on the tipping floor in order to facilitate the processing of the waste. The <br />project description does not mention how much area would be required for vehicle <br />unloading (type of vehicle, size, volume of waste contained), or the number of vehicles <br />that would be unloading at one time. The proposed project does not indicated if there <br />will be a separate unloading area for the self haul customers or the number of waste <br />screeners/spotters on the tipping floor during the operation. <br />1. Provide a facility capacity study that analyzes the traffic and waste volume as it <br />relates to the proposed changes and facility capacity. Include the calculations <br />that will take in to account the space or area required to safely conduct the <br />proposed operations. <br />4. The project description on page 22, indicates that the facility does not knowingly receive <br />Household Hazardous Waste (HHW). The facility currently collects antifreeze, waste oil, <br />batteries, and paint. Revise to accurately reflect current site conditions. <br />