Laserfiche WebLink
Page 3 of 5 <br />(a) For operations or facilities not open to the public, each point of access from a public road shall <br />be posted with an easily visible sign indicating the operation or facility name and location of <br />nearest public operation or facility. <br />(b) If the operation or facility is open to the public, there shall be an easily visible sign at all public <br />entrances indicating the name of the operator, the operator's telephone number, schedule of <br />charges, hours of operation, and a listing of the general types of materials which either (1) WILL be <br />accepted, or (2) WILL NOT be accepted. <br />17406.2. General Design Requirements. <br />(c) The operation or facility shall be designed in such a manner as to restrict the unloading area to <br />as small an area as practicable, provide adequate control of windblown material, minimize the <br />propagation or attraction of flies, rodents or other vectors and the creation of nuisances by reason <br />of solid wastes being handled at the operation. Other factors which shall be taken into <br />consideration are: dust control, noise control, public safety, and other pertinent matters related to <br />the protection of public health at the operation or facility. <br />From: Robert McClellon [EH] [mailto:RMcClellon@sjcehd.com] <br />Sent: Friday, May 20, 201110:24 AM <br />To: Taylor, Kevin; Evan Edgar <br />Subject: RE: Site visit - June 2, 2011 - Thursday 1:00 to discuss CEQA and the future SWFP Revision <br />If you are not willing to provide a thorough evalution of the proposed changes (onsite circultaion and noise) <br />then I do not see a great benefit in meeting. To roll up our sleeves and go over old stuff does not work. <br />Robert <br />From: Taylor, Kevin[mailto:Kevin.Taylor@CalRecycle.ca.gov] <br />Sent: Friday, May 20, 201110:20 AM <br />To: 'Evan Edgar'; Robert McClellon [EH] <br />Subject: RE: Site visit - June 2, 2011 - Thursday 1:00 to discuss CEQA and the future SWFP <br />Revision <br />I can meet if that is what's decided. <br />From: Evan Edgar [mailto:Evan@edgarinc.org] <br />Sent: Friday, May 20, 20119:36 AM <br />To: Robert McClellon [EH] <br />Cc: Taylor, Kevin <br />Subject: RE: Site visit - June 2, 2011 - Thursday 1:00 to discuss CEQA and the future SWFP <br />Revision <br />Can you meet on June 2, 2011, at 1 pm with CalRecycle Kevin Taylor to roll up the sleeves and go <br />over the Reports that was provided to the Lead Agency? <br />AV <br />Edgar <br />5/20/2011 <br />