My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084833
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MICKE GROVE
>
11793
>
4200 – Liquid Waste Program
>
SR0084833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 1:15:28 PM
Creation date
2/24/2022 1:00:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
RECORD_ID
SR0084833
PE
4201
FACILITY_NAME
11793 N MICKE GROVE RD
STREET_NUMBER
11793
Direction
N
STREET_NAME
MICKE GROVE
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05910002
ENTERED_DATE
2/4/2022 12:00:00 AM
SITE_LOCATION
11793 N MICKE GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />SP 19 <br /> <br />All permits and approvals as may be required for this project shall be secured or ordered <br />immediately after award of the contract or their acquisition timing determined, such that the <br />same is not a cause for delay. The cost of the permits shall be included in the total bid costs. <br />Minor deviations from these requirements may be allowed by the Engineer, if in the opinion of <br />the Engineer, the prosecution of the contract will be better served and the work expedited. Any <br />Contractor request for such deviations shall not be adopted without the Engineer's prior <br />written approval. <br />Full compensation for conforming to such requirements will be considered as included in the <br />prices paid for the various contract items of work, and no additional compensation will be <br />allowed, therefore. <br />8‐1.04 PRE‐CONSTRUCTION SURVEY <br />The Contractor shall perform pre‐construction and post‐construction survey of all existing <br />structures, pavements and other above ground facilities within the project limits prior to <br />beginning any work, noting their condition by means of dated photographs and video. <br />Color photographs shall be taken with a digital camera at locations (property sites) that are <br />appropriate to show pre‐existing conditions and after constructed conditions. Each photograph <br />shall show the date and time the photograph was taken and clearly be labeled showing the <br />location, viewing direction, and any special features noted. Digital copies of photographs and <br />video shall be submitted to the County prior to approval of project. <br />Full compensation for preconstruction survey shall be included in the contract price for <br />mobilization and no additional compensation will be allowed. <br />8‐1.05 MONUMENTS <br />The Contractor shall preserve and perpetuate existing monuments, property pins, chiseled <br />cross, etc. affected by the work included in this project in accordance with the most current <br />edition of the Professional Land Surveyors Act (Business and Professions Code §§ 8700‐8805), <br />Sections 8771. <br />The Contractor shall perform a survey to preserve any existing survey monuments such as <br />chiseled cross, survey iron pipe, etc. that may be present on the pavement, round corners, and <br />concrete flat work to be improved by this project. Monument preservation shall be done by or <br />under the supervision of a Licensed Land Surveyor. <br />The Contractor shall notify the Engineer immediately if any monument is disturbed. The <br />Contractor shall be responsible for hiring a Licensed Land Surveyor to reset any survey <br />monument disturbed by his/her operations. A new record of survey shall be filed with the San <br />Joaquin County Surveyor’s office, which copies shall be submitted to the Engineer. <br />Full compensation for conforming to the requirements of this section shall be considered as <br />included in the prices paid for the various contract items of work involved, and no additional <br />compensation will be allowed, therefore. <br />
The URL can be used to link to this page
Your browser does not support the video tag.