Laserfiche WebLink
  <br />  <br />SP 19  <br />  <br />All permits and approvals as may be required for this project shall be secured or ordered  <br />immediately after award of the contract or their acquisition timing determined, such that the  <br />same is not a cause for delay.  The cost of the permits shall be included in the total bid costs.  <br />Minor deviations from these requirements may be allowed by the Engineer, if in the opinion of  <br />the Engineer, the prosecution of the contract will be better served and the work expedited. Any  <br />Contractor request for such deviations shall not be adopted without the Engineer's prior  <br />written approval.  <br />Full compensation for conforming to such requirements will be considered as included in the  <br />prices paid for the various contract items of work, and no additional compensation will be  <br />allowed, therefore.  <br />8‐1.04 PRE‐CONSTRUCTION SURVEY  <br />The Contractor shall perform pre‐construction and post‐construction survey of all existing  <br />structures, pavements and other above ground facilities within the project limits prior to  <br />beginning any work, noting their condition by means of dated photographs and video.  <br />Color photographs shall be taken with a digital camera at locations (property sites) that are  <br />appropriate to show pre‐existing conditions and after constructed conditions. Each photograph  <br />shall show the date and time the photograph was taken and clearly be labeled showing the  <br />location, viewing direction, and any special features noted. Digital copies of photographs and  <br />video shall be submitted to the County prior to approval of project.  <br />Full compensation for preconstruction survey shall be included in the contract price for  <br />mobilization and no additional compensation will be allowed.  <br />8‐1.05 MONUMENTS  <br />The Contractor shall preserve and perpetuate existing monuments, property pins, chiseled  <br />cross, etc. affected by the work included in this project in accordance with the most current  <br />edition of the Professional Land Surveyors Act (Business and Professions Code §§ 8700‐8805),  <br />Sections 8771.    <br />The Contractor shall perform a survey to preserve any existing survey monuments such as  <br />chiseled cross, survey iron pipe, etc. that may be present on the pavement, round corners, and  <br />concrete flat work to be improved by this project. Monument preservation shall be done by or  <br />under the supervision of a Licensed Land Surveyor.   <br />The Contractor shall notify the Engineer immediately if any monument is disturbed. The  <br />Contractor shall be responsible for hiring a Licensed Land Surveyor to reset any survey  <br />monument disturbed by his/her operations.  A new record of survey shall be filed with the San  <br />Joaquin County Surveyor’s office, which copies shall be submitted to the Engineer.  <br />Full compensation for conforming to the requirements of this section shall be considered as  <br />included in the prices paid for the various contract items of work involved, and no additional  <br />compensation will be allowed, therefore.  <br />