Laserfiche WebLink
  <br />  <br />SP 20  <br />  <br />SECTION 9 – WATER POLLUTION CONTROL  <br />Water pollution control shall conform to the requirements in Section 13, “Water Pollution  <br />Control,” of the Caltrans Specifications, these Special Provisions, and as directed by the  <br />Engineer.  <br />The Contractor shall develop and implement a Storm Water Pollution Prevention Plan (SWPPP),  <br />which specifies Best Management Practices (BMPs) that will prevent all construction pollutants  <br />from contacting storm water and with the intent of keeping all products of erosion from moving  <br />off site into receiving waters. The Contractor shall inspect and maintain all BMPs.  <br />Full compensation for furnishing, installing, maintaining, and removing all components of the  <br />required water pollution control devices as specified in the plans and these Special Provisions,  <br />and as directed by the Engineer, shall be included in the contract prices for “Erosion Control  <br />Measures” and no additional compensation will be allowed therefore.  <br />