Laserfiche WebLink
  <br />  <br />SP 26  <br />  <br />groundwater, and which will endure permanently under the conditions of  <br />the proposed use.  <br />  <br />B. Leach Field Pipe:  SDR 26 Perforated Poly Vinyl Chloride (PVC) material; inside  <br />nominal diameter as indicated on the Drawings. Surrounded by ¾” drain rock 4”  <br />on each side.    <br />  <br />C. Pressure (Force Main) Pipe:  Schedule 40 Poly Vinyl Chloride (PVC) material;  <br />inside nominal diameter as indicated on the Drawings.  <br />  <br />1. Fittings:  ASTM D2466, PVC.  <br />2. Joints:  ASTM D2855, solvent weld.  <br />3. Flexible connectors: 1.5‐inch and larger – General Rubber Corporation  <br />Maxi‐Joint Style 1010 flanged single sphere connector with EPDM  <br />elastomers.  <br />  <br />2.2 SEPTIC TANKS  <br />G. Septic Tanks:  As indicated on the Drawings.  (Refer to Sewer System Data Table  <br />on Sheet C4.0.) Septic tanks: shall be a single‐wall fiberglass reinforced plastic  <br />(FRP) Underwriters Laboratories‐labeled, IAPMO approved, H20 traffic rated,  <br />underground storage tanks as shown on the drawings. The tank size, fittings and  <br />accessories shall be as shown on the drawings. Interior appurtenances shall all  <br />be provided and installed by the tank manufacturer (excluding pump, float  <br />switch support and pump discharge piping).  Effluent filters shall be provided by  <br />the Contractor and installed in the factory by the tank manufacturer.  No  <br />connections to the tank shall be made in the field except for piping connections  <br />to inlet and outlet piping and piping connections through risers.  Risers shall be  <br />provided by the tank manufacturer and installed in the field.  <br />1. Access Opening:  <br />a. All tanks shall require at least two access openings, see project  <br />plans for access configuration.  <br />b. All access openings shall be a minimum of 30”, complete with  <br />riser, lid, and necessary hardware. See project plans for access  <br />configurations.  <br />2. Inlet Piping:  <br />a. All tanks shall be equipped with factory‐installed, inlet and outlet  <br />piping. See project plan details for discharge assemblies.  <br />Discharge assemblies shall conform to the force main connecting  <br />pipe.