  <br />  <br />SP 27  <br />  <br />3. Fittings:  <br />a. All FRP nozzles shall be plain end and match the size of connecting  <br />pipe.  <br />b. All PVC piping shall be a minimum of Schedule 40. See project  <br />plan details for discharge assemblies. Discharge assemblies shall  <br />conform to the force main connecting pipe.  <br />4. Lifting Lugs:  <br />a. All tanks shall have lifting lugs that are capable of withstanding  <br />weight of tank with a safety factor of at least 2:1.  <br />5. Access Risers:  <br />a. Attached access risers shall be per the project plans and have a  <br />minimum 30” diameter access opening supplied by tank  <br />manufacturer. See sheet C4.0 for riser details.  <br />b. Attached access risers shall be attached to access opening by  <br />Contractor with adhesive supplied by tank manufacturer when  <br />manufacturer supplies the attached risers.  <br />6. Anti‐floatation:  <br />a. All anti‐floatation calculations, straps, clamps, parts, precast  <br />weights, anchor bolts, etc.. shall be by Xerxes. Manufacturer shall  <br />determine the need for anti‐flotation devices based upon the  <br />information provided in the drawings.  Anti‐flotation devices, if  <br />required, shall be manufacturer’s standard precast concrete dead  <br />men with the manufacturer’s standard straps, anchor points and  <br />turnbuckles.  Manufacturer shall provide calculations establishing  <br />the need, or not, for anti‐flotation devices.  <br />7. Pre‐assembly  <br />a. To the greatest extent possible materials provided by the  <br />Contractor to the Supplier shall be installed in the tank prior to  <br />delivery.  <br />2.3 PUMPS  <br />A. Pumps:  As indicated on the Drawings.  Refer to Sewer System Data Table on  <br />Sheet C4.0)  <br />1. The Contractor shall ensure that the supplied pump meets the following  <br />criteria: