Laserfiche WebLink
  <br />  <br />SP 30  <br />  <br />whereby all 4 pumps can run in sequence and properly discharge a full  <br />timed dose. No pump shall run a partial dose.  <br />  <br />2.4 BEDDING AND COVER MATERIALS  <br />A. Pipe Bedding Material:  As specified in San Joaquin County Standards and  <br />Specifications.  <br />B. Pipe Cover Material:  As specified in San Joaquin County Standards and  <br />Specifications.  <br />C. Septic Tank Backfill:  As specified in the Manufacturer Installation Manual and  <br />Operating Guidelines for Fiberglass Underground Storage Tanks in effect at time  <br />of installation.  <br />D. Tracer wire:  Magnetic detectable conductor, brightly colored plastic covering,  <br />imprinted with appropriate utility label in large letters.  <br />E. Marker Tape:  Bright colored, continuously printed, minimum 6 inches wide by 4  <br />mil thick, manufactured for direct burial service.  <br />  <br />12‐3 EXECUTION  <br />3.1 TRENCHING  <br />A. Refer to San Joaquin County Trenching and Backfilling for requirements.  <br />3.2 TESTING AND INSTALLATION – SEPTIC TANKS  <br />A. Tank shall be tested according to the Manufacturer Installation Manual and  <br />Operating Guidelines for Fiberglass Underground Storage Tanks in effect at time  <br />of installation.  <br />B. Tank shall be installed according to the Manufacturer Installation Manual and  <br />Operating Guidelines for Fiberglass Underground Storage Tanks in effect at time  <br />of installation. The tanks shall be air pressure tested by the manufacturer prior  <br />to assembly or shipping to the site.  <br />C. Contractor shall be trained by the tank manufacturer, the State, or other  <br />approved agency.  <br />D. Once installed the septic tanks and all sumps shall be leakage tested by filling the  <br />vessel with water to within 6” of the rim of the risers and left to sit with no  <br />leakage for at least 24 hours.  <br />3.3 INSTALLATION – PUMPS