Laserfiche WebLink
  <br />  <br />SP 41  <br />  <br />III. Include the testing of HOA, automatic float operations,  <br />thermal protection, controller programming to motor  <br />specifications, control circuits, alarm sequences, and other  <br />ancillary systems used to satisfy the design intent.  <br />  <br />14‐2 PRODUCTS  <br />14‐2.01 MATERIALS  <br />A. Electrical contractor to provide complete Type 4X outdoor fiberglass duplex  <br />motor starter and alarm panel with dead‐front and compatible with supplied  <br />motor (Liberty LSG202M, 2HP, 240V, 1PH, FVNR).  Provide power feeder and  <br />accessory wiring to panel, conduit, boxes, terminal block, control fuse, gfci  <br />outlet, accessories and programming as required to make a fully functional  <br />system as described in project written specifications, project plans, and per the  <br />manufacturer’s installation instructions, manuals, and as documented on their  <br />official internet website.  <br />  <br />B. Enclosure shall be lockable.  <br />  <br />C. Duplex receptacle manufactured by Hubbell and rated GFCI 20A 125V 1P3W 5‐ <br />20R.  <br />  <br />D. Alarm light and audible horn with reset switch.  <br />  <br />E. Front door phenolic nameplates describing device operation, specifications, and  <br />source location and size.  <br />  <br />14‐3 EXECUTION  <br />14‐3.01 SITE EXAMINATION  <br />  <br />A. Locate pump panel mounting location in accordance with approved project  <br />plans and in compliance with local building codes and the authority having  <br />jurisdiction.  <br />  <br />14‐3.02 INSTALLATION  <br />  <br />B. Install pump panel in accordance with the safety regulations and the  <br />manufacturer’s product literature and UL installation instructions, current at  <br />the time of installation. Coordinate locations of operators and control devices  <br />with contract drawings; other trades and shop drawings.  <br />  <br />C. Installer shall ensure that the electrical service to the panel is at least 60Amps  <br />at the specified voltage and phases. Perform load testing on existing Panel B.  <br />Electrical wiring to conform to NEC and manufacturer’s installation  <br />instructions.