My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014580
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14720
>
2600 - Land Use Program
>
S-81-11
>
SU0014580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:01:51 PM
Creation date
2/24/2022 1:38:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014580
PE
2600
FACILITY_NAME
S-81-11
STREET_NUMBER
14720
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
APN
05516031
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
14720 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The overland flow coefficient is the average area will be needed to handle wastewater flows <br /> fraction of applied wastewater flowing over the soil during harvest operations. Each terrace should be <br /> surface. The purpose of this coefficient is to convert harvested on a rotating basis. The length of the <br /> the average overland flow rate q to an application rate drying period before harvest will depend on local <br /> (Q,). It can be calculated from the relationship climatic conditions and should be long enough to <br /> allow harvesting machinery to drive over the terrace <br /> r= 1.0+f (17) without rutting the surface. In most cases,a week <br /> 2 should be adequate. An alternative to increasing <br /> the size of the wetted area would be to temporarily <br /> where f is the runoff fraction. increase the application time to the remaining <br /> terraces. <br /> The annual operating time Y will vary depending Additional land will also be needed for buildings, <br /> on the application cycle and season. The application access roads and buffer zones. Aly et al. (1979) <br /> cycle is the number of hours per day and days per indicated that this additional non-wetted area is <br /> week that wastewater is being applied to the terraces. usually 25% to 30%of the sum of wetted and non- <br /> Application cycles normally range from 6 to 8 hours wetted areas. The total area of the overland flow <br /> of continuous application per day,5 to 7 days per system should also include the land needed for a <br /> week. Obviously, the land area required for the storage pond if necessary. <br /> system can be reduced substantially by choosing a <br /> longer application cycle. No deleterious effects on <br /> performance were noted at Utica,Mississippi (Peters DESIGN EXAMPLE <br /> et al. 1981) when pond effluent was applied 24 hours <br /> per day, 7 days per week. However, shorter applica- The previously outlined design procedure can <br /> tion cycles of 8 to 10 hours per day are recommended best be explained with an example. In this example, <br /> if raw wastewater or primary effluent is applied, an overland flow facility is being considered for a <br /> Shorter application cycles will reduce the rate of small town in upstate New York. The design flow is <br /> solids accumulation at the top of the terrace and 3785 m3 day' (1.0 million gal.day'). Because of <br /> allow these solids to degrade more rapidly because its northern location the facility will have a holding <br /> of aeration during the off period. pond to store wastewater during the winter. The <br /> The application season is the number of weeks holding pond effluent and raw wastewater will be <br /> per year that the system can be expected to operate. mixed prior to application. The expected quality <br /> In southern areas the application season may extend of this mixture is 150 mg L-' BOD and 100 mg L' <br /> throughout the year because short periods of cold TSS. The discharge limits for this facility are 20 mg <br /> weather will normally not affect performance (Aly L' BOD and 20 mg L-' TSS. The soils in the area <br /> et al. 1979). In northern areas, the application season are slowly permeable so that the runoff fraction is <br /> usually coincides with the growing season. During expected to be only 0.6. The mass BOD and TSS <br /> the non-growing season, wastewater is stored in a removals required to meet the discharge limits are <br /> pond or lagoon. Martel et al. (1980) found that the <br /> EPA-1 computer program provided a good estimate (1.0 x 150-0.6 x 20) 100 <br /> of the number of storage days needed for overland %BOD removal = 1.0 x 150 <br /> flow systems. <br /> Step 3: Calculate the land area = 92% <br /> Since the length of terrace has already been spec- /o o T55 removal = (1.0 x 100-0.6 x 20) 100 <br /> ified, the only remaining dimension needed to cal- 1.0 x 100 <br /> culate the land area is width. Width can easily be <br /> determined by dividing the annual volume of waste- = 88%. <br /> water applied by the annual application rate Qa. <br /> If a storage pond is included in the design, the annual From Figure 6, the detention time needed to <br /> volume of wastewater applied should be adjusted to remove 92% of the BOD is 60 minutes. From Figure <br /> reflect the net volume of water entering or leaving 8, the detention time needed to remove 88%of the <br /> the pond due to precipitation and evaporation. TSS is 40 minutes. Since BOD removal is the limiting <br /> The land area calculated by this procedure is parameter, the design is based on a detention time of <br /> only part of the total wetted area. Additional wetted 60 minutes. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.