Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for fast and easy mart #103 as of September 08, 2022. <br /> Open violations from May 25, 2022 inspection <br /> Violation #209 - Failure to maintain a copy of the "Facility Employee Training Certificate" on-site. <br /> OBSERVATION The Facility Employee Training Certificate dated 12/02/2021 did not include the date of employees <br /> assuming responsibility as facility employees and the designated operator ICC certification expiration date. <br /> REGULATION GUIDANCE: All site employees must be trained prior to taking responsibility as a facility employee if <br /> after October 1 , 2018, or within 30 days of hire if prior to October 1 , 2018. The Facility Employee Training <br /> Certificate shall contain accurate information for all employees trained. <br /> CORRECTIVE ACTION: Update the Facility Employee Training Certificate to contain the accurate information and <br /> submit a copy of the updated form to the EHD. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation #214 - Failure to comply with UST operating permit conditions. <br /> OBSERVATION The facility is not in compliance with the written conditions of the operating permit. The overfill <br /> prevention equipment testing due by 10/2021 has not been conducted . <br /> REGULATION GUIDANCE: The owner and operator of underground storage tank (UST) systems shall comply with <br /> all requirements of the permit issued for the operation of the UST system. <br /> CORRECTIVE ACTION: Immediately take all necessary actions to bring these UST systems into compliance. <br /> Schedule for overfill prevention equipment testing now. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #319 = Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION Overfill prevention testing has not been conducted. Overfill prevention equipment testing was <br /> required to be conducted by 10/13/2018, it was conducted on 06/4/2021 (late) . The next overfill prevention <br /> equipment testing was required to be conducted by 10/2021 and it has not been conducted. <br /> REGULATION GUIDANCE: Overfill prevention equipment inspections were required to be conducted by October <br /> 13, 2018, and every 36 months thereafter, and within 30 days of completion of a repair. <br /> CORRECTIVE ACTION: Immediately schedule this testing and provide 48 hours notification to the EHD. Ensure all <br /> future testing is conducted within required time frames. <br /> Page 3 of 4 <br />