Laserfiche WebLink
SAN J O A Q U I N Environmental Health Department <br /> COUNTY <br /> e . Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> f. Verification that ball float (s ) , if installed , do not interfere with the installed flapper valve . <br /> Please be aware that the facility cannot operate the E85 (former Diesel) UST system or <br /> receive fuel in the E85 (former Diesel) tank prior to the EHD inspection and approval, <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible valid , <br /> current contractor' s licenses issued by the Contractors State License Board ( may be <br /> issued to the installation company) , or a Tank Tester' s license issued to the individual by <br /> the State Water Board <br /> b . Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid , current California UST Service Technician <br /> certificate issued by the International Code Council ( ICC ) <br /> c . Possesses a valid , current certificate of training from the manufacturer(s) of the <br /> component( s) being tested , repaired , or serviced <br /> 5 . Individuals installing underground storage tank system components must possess or work under <br /> the direct and personal supervision of an individual physically present at the work site who <br /> possesses all of the following : <br /> a . A valid , current contractor' s license issued by the Contractors State License Board <br /> b . A valid , current UST Installation/ Retrofitting certificate issued by the International Code <br /> Council ( ICC ) <br /> c . A valid , current certificate of training from the manufacturer( s ) of the component (s) being <br /> installed <br /> 6 . The tank owner or operator shall log into the California Environmental Reporting System <br /> (CERS ) at http : //cers , calepa . ca . gov/ and ensure all UST information is current . <br /> 7 . All components must be certified by an independent testing organization and labeled as <br /> required by the organization ( UL , ULC , ANSI , API , ASTM , etc . ) . See California Code of <br /> Regulations (CCR) Title 23 , Chapter 16 , Table B for a complete list . <br /> 8 . Permit expires 180 days from the date of approval . If an extension to the expiration date is <br /> required , a written request must be submitted to this office prior to the expiration date . <br /> If you have any further questions , please contact me at (209) 616 - 3061 . <br /> Thank you , <br /> 0�� <br /> Carol Presto <br /> Registered Environmental Health Specialist <br /> Cc: Reliance Gas Investments, Jivtesh Gill, j2jgill@aol. com <br /> 2of2 <br />