Laserfiche WebLink
<br /> <br />DART CONTAINER CORPORATION <br />LODI FACILITY <br /> <br /> ABOVEGROUND STORAGE TANK <br />IN-SERVICE INSPECTION REPORT <br />AST-1 <br />Inspection Date: November 11, 2021 <br /> <br /> <br /> <br />1.0 PREFACE <br />Throughout this document, “Customer” or “Client” refers to Dart Container Corporation, “Facility” refers <br />to the Lodi Facility; and “Consultant”, “Engineer” or “Condor” refers to Condor Earth. <br /> <br />Field observations and research reported herein are considered sufficient in detail and scope to form a <br />reasonable basis for an in-service evaluation of the 10,000-gallon Aboveground Storage Tank (AST), <br />Spill Prevention, Control, and Countermeasures (SPCC) Plan ID AST-1 (Tank). <br /> <br />The methods used to acquire the information as well as compile and analyze the inspection data are <br />considered current and widely accepted methods in the industry. These methods have been developed to <br />provide our Client with information regarding apparent indications of existing or potential conditions <br />relating to the Tank and are limited by the accessibility to the tank and information available at the time <br />of the site visit and inspection. Conclusions listed in this report may have been based in part on <br />information provided by the current facility owner, their agents and/or third parties. Determining the <br />accuracy of information provided by others was not within the scope of services for which Condor was <br />retained. Conclusions based in whole or in part upon information provided by others shall be relied upon <br />at our Client’s sole risk. <br /> <br />This inspection report serves as documentation of the formal external inspection results for the Tank on <br />November 11, 2021, at the Facility. This Report is intended to provide the Tank owner/operator with an <br />assessment of the Tank’s current condition, recommendations for improvements to maintain long-term <br />integrity, and an opinion of the Tank’s suitability for continued service. <br /> <br />2.0 INSPECTION PROCEDURES <br />The Tank was inspected following the portions of the applicable procedures contained in the sixth edition <br />of the Steel Tank Institute (STI) Standard SP001, January 2018 “Standard for Inspection of Aboveground <br />Storage Tanks.” <br /> <br />Where applicable, Condor provided the following inspection and testing services on the Tank: <br />1. Visually inspect the outside of the Tank in detail. At a minimum, the following tank components <br />were inspected (where applicable): <br />a. Primary tank <br />b. Secondary tank (not applicable) <br />c. Tank supports <br />d. Tank anchors <br />e. Tank foundation and external supports <br />f. Tank gauges and alarms <br />g. Insulation covering (not applicable) <br />h. Tank appurtenances <br />i. Normal vents