My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 9:59:06 AM
Creation date
3/15/2022 8:05:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8 . INJANK 'GAUGING TESTING <br /> IVI Check this box if tank gauging is used only for inventory control . <br /> ❑ Check this box if NO tank gauging equipment is installed . Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been : 1 ) visually inspected for kinks , breaks and proper entry and El El ❑ <br /> termination ; and 2 tested for ground faults ? <br /> Were all in -tank gauging probes visually inspected for damage and residue buildup ❑ ❑ El <br /> to ensure that floats move freely , functionally tested , and confirmed operational ? <br /> Was accuracy of system ' s product level readings tested ? ❑ ❑ ❑ <br /> Was accuracy of system ' s water level readings tested ? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? El ❑ ❑ <br /> Were all items on the equipment manufacturer' s maintenance checklist completed ? IR ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> 9 . COMMENTS <br /> Describe all answers marked "No " or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Estops = Tested & Passed . <br /> Shear Valves - Tested & Passed . <br /> Replaced TLS Battery for PM Purpose. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.