My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 9:59:06 AM
Creation date
3/15/2022 8:05:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address : 1427 S . Airport Way, Stockton <br /> TLs . . <br /> ESO 6verfill. . . <br /> 1 . . . . .3 . . . . . 5 . . . . . . . • . . . <br /> . . 4 0 . . <br /> . • . . . 4208 . . . . . . . 0 . 208 a . . . 0 6 4 208 . 0 . . . . . <br /> .4 . 6 . <br /> 04 . . . 90 . . . . . . . . <br /> Regular . Premium . <br /> STP STP . <br /> 420 Annular 208 62Q8 . • , . 208 . . <br /> Sensor FE Petro STP- <br /> . 208 . MLD . <br /> •RJ• 116-057-5 LLD • F V • • • ATG • F V <br /> ATG . . . . . <br /> Piping is Estimated Only. <br /> Regular & Prem. Are Split Tanks & Share Annular. <br /> Date map was drawn: 06/20/2022 <br /> 06 <br /> Instructions <br /> If you all 4eady have a diagram that shows all r'equir'ed information, you may include it, lather than this page, with your <br /> Monitoring System Certification. On your site plan , show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels ; sensors monitoring tank annular <br /> spaces , sumps , dispenser pans, spill containers, or' other secondary containment areas ; mechanical or electronic line leak <br /> detectors ; and in-tank liquid level probes (if used for leak detection) . In the space provided, note the date this Site Plan <br /> was prepared. Page 1 of 1 05100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.