Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address : 1427 S . Airport Way, Stockton <br /> TLs . . <br /> ESO 6verfill. . . <br /> 1 . . . . .3 . . . . . 5 . . . . . . . • . . . <br /> . . 4 0 . . <br /> . • . . . 4208 . . . . . . . 0 . 208 a . . . 0 6 4 208 . 0 . . . . . <br /> .4 . 6 . <br /> 04 . . . 90 . . . . . . . . <br /> Regular . Premium . <br /> STP STP . <br /> 420 Annular 208 62Q8 . • , . 208 . . <br /> Sensor FE Petro STP- <br /> . 208 . MLD . <br /> •RJ• 116-057-5 LLD • F V • • • ATG • F V <br /> ATG . . . . . <br /> Piping is Estimated Only. <br /> Regular & Prem. Are Split Tanks & Share Annular. <br /> Date map was drawn: 06/20/2022 <br /> 06 <br /> Instructions <br /> If you all 4eady have a diagram that shows all r'equir'ed information, you may include it, lather than this page, with your <br /> Monitoring System Certification. On your site plan , show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels ; sensors monitoring tank annular <br /> spaces , sumps , dispenser pans, spill containers, or' other secondary containment areas ; mechanical or electronic line leak <br /> detectors ; and in-tank liquid level probes (if used for leak detection) . In the space provided, note the date this Site Plan <br /> was prepared. Page 1 of 1 05100 <br />