Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> 6 . 10 EXISTING PUBLIC accommodate demand. The final bus stop <br /> T R A N S P 0 R TAT 10 N locations may require additional future right-of- <br /> The County public transit system includes the way to accommodate bus stops, which shall be <br /> following public transportation network. dedicated through the final mapping process. <br /> a. Regional Intercity Fixed-Route Bus Service 6 . 11 U T I L I T I E S <br /> The San Joaquin Regional Transit District (SJRTD) The following utility infrastructure requirements <br /> operates one fixed-route bus line (currently are intended to implement the necessary <br /> designated Route 20) that serves the City of Tracy. improvements required for the development of <br /> This bus line connects the county and City of Tracy the Project. The central location of the public <br /> to Stockton and Lathrop along Interstate 5. Within water, sewer, and fire utilities was chosen to <br /> the City of Tracy, this line extends along Grant Line provide screening for both the fire and the <br /> Road and East Eleventh Street. recycled water tanks. By locating these facilities <br /> behind buildings and utilizing generous landscape <br /> b. SJRTD Flexible Fixed-Route Service screening will assist to reduce the visual <br /> SJRTD also operates a flexible fixed-route line impacts of these tank and other improvements. <br /> within the City of Tracy. This route extends along Centralizing the water and wastewater facilities <br /> Grant Line Road with stops at major locations such also provides for additional security where <br /> Wal-Mart, West Valley Mall, the Naglee Park & facilities on the edge of the project make them <br /> Ride Facility, and the Prime Outlets on Pescadero potentially more exposed to vandalism. The <br /> Avenue. centralized location also provides for multiple <br /> pipe corridors to access the water, sewer, and fire <br /> c. SJRTD Commuter Bus Service services. By having multiple connections to these <br /> The SJRTD operates several commuter bus lines facilities limits the potential impacts of a pipe <br /> that connect cities in San Joaquin County with break which may potentially affect all buildings <br /> major employment locations in the San Francisco rather than a single building. <br /> Bay Area including Pleasanton, Dublin, Livermore, <br /> Mountain View, Palo Alto and Sunnyvale. These a. Potable Water <br /> various routes pick up and drop off passengers at The project will be served by a public water <br /> the Tracy Park-And-Ride facility. system (classified as a non-transient, non- <br /> community water system). The project is <br /> d. Passenger Rail System preparing an application to the State Water <br /> Altamont Commuter Express (ACE) is a passenger Resources Control Board for a permit to create a <br /> rail service connecting Stockton to San Jose. The new Transient, Non-Community Water System. <br /> ACE station for Tracy is located on Tracy Boulevard Once the application has been approved then <br /> at Linne Road. There are currently three ACE trains the project will work with San Joaquin County's <br /> per day. Environmental Health Department to construct <br /> Public transportation will be extended to the the water related facilities. The water system <br /> Project Area based on demand generated by wells, and the water treatment system will be <br /> actual development in the Project Area. Bus constructed with the initial building. The potable <br /> routes may be modified and expanded as distribution system will then be expanded to serve <br /> necessary and when feasible to efficiently each building as it develops. <br /> CHAPTER 6 <br /> 6-15 <br />