INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Two potable water wells will provide the fire storage tank, and fire system pump station are <br /> necessary water required for the project and will all anticipated to be located at the potable water <br /> pump to the water treatment facility adjacent to treatment site. <br /> Schulte Road at the eastern project boundary, <br /> see Figure 6-14. One potable well will be located c. Wastewater system <br /> at the water treatment plant site and the other The wastewater treatment facility has been <br /> will be located within the development area. The located at the lowest elevation within the project. <br /> wells need to be separated as much as possible This would allow for a majority of the proposed <br /> to insure reliability with the groundwater table. development to gravity feed to the wastewater <br /> Both wells will pump water to the central location treatment facility. The only potential development <br /> for treatment and then be distributed to the that will have to pump sewer by force main is <br /> proposed buildings within the project. Similar to the development located north of BBID Irrigation <br /> the recycled water system the central location canal. The treated wastewater will be stored <br /> of the water treatment system minimizes the in an above ground tank (approximately 2.0 <br /> pumping requirements and reduces costs for the million gallons) and will be the water source <br /> water facilities due to shorter pipe runs and less for the recycled water landscape irrigation. The <br /> head loss. The treatment system may produce a centralized location minimizes the pumping <br /> brine that will need to put into an evaporation requirements for wastewater disposal due to the <br /> holding tank. pipe lengths and reduced head loss which will <br /> also reduce energy costs. The central location may <br /> b. Fire water system also minimize any potential odor issues associated <br /> The fire well is planned to be located at the with the wastewater treatment with neighboring <br /> water treatment site with an associated storage properties to the east. <br /> tank to provide for the necessary firefighting <br /> requirements. Locating the fire system centralizes Wastewater will be treated and disposed of <br /> all the systems and reduces the pumping and onsite and will consist of a wastewater treatment <br /> energy requirements, similar to the water and facility, and sludge drying ponds. The project is <br /> recycled water systems. The fire system will be preparing an application to the regional water <br /> independent from the potable water system. board for the treatment of wastewater generated <br /> The fire system will be designed to meet the by the project. Once the permit is approved <br /> requirements of the local fire district. The fire by the reginal board then the project will work <br /> well and storage tank will be constructed with the with County environmental health department <br /> first building. The fire water distribution system to construct the package treatment facility. The <br /> will then be expanded as each new building treatment system is a Membrane Bioreactor <br /> comes online. (MBR) treatment plant. The treatment system <br /> will produce Title 22 compliant effluent, recycled <br /> An above ground storage tank will provide for water. The wastewater treatment system and <br /> the necessary capacity for fire protection for the effluent storage tank will be constructed with the <br /> project, see Figure 6.14. A looped pipe system first building. The wastewater collection system <br /> and fire hydrant system will provide for the will then be expanded to subsequent buildings as <br /> required fire safety requirements for the project. they are constructed. <br /> Booster pumps will be required at each building to <br /> provide for the required pressure for the interior <br /> fire sprinkler systems. The fire well, <br /> CHAPTER 6 <br /> 6-16 <br />