Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> will be pad mounted in lieu of subsurface consistent with the County's goals and policies, <br /> installation where possible to avoid corrosion and the County will establish as part of the subdivision <br /> to facilitate safer and less expensive maintenance mapping process, timing requirements for certain <br /> and operations. The joint or common trench components of Specific Plan Improvements. <br /> will include gas, phone, fiber optic and cable TV Except as otherwise set forth in this Specific Plan, <br /> facilities, and such other equipment and facilities implementation and timing of infrastructure <br /> as determined by the County. improvements will be determined through the <br /> County's processing and approval of development <br /> 6 . 12 SOLI D WASTE DISPOSAL agreements, tentative parcel, or subdivision map <br /> The proposed land uses in the Project Area will applications, and/or development review permit <br /> generate additional solid waste. Tracy Delta processes for individual, site-specific development <br /> Solid Waste Management Inc. currently provides projects. In conjunction with the County's <br /> services to the southeastern portion of San processing of such applications, the County <br /> Joaquin County for the collection, transportation will consider proposals to construct interim <br /> and disposal of refuse and garbage, including the infrastructure improvements in appropriate <br /> collection of recyclable material. circumstances, and which interim infrastructure <br /> Uses in the Project Area will be required to improvements will ultimately be replaced by the <br /> incorporate the following sustainability measures ultimate Specific Plan Improvements. The timing <br /> for solid waste: of all infrastructure construction is and shall be <br /> established to best promote and facilitate the <br /> • Reuse and recycle construction and demolition County's goals and objectives for development of <br /> waste (including, but not limited to, soil, the Specific Plan Area. <br /> vegetation, concrete, lumber, metal, and <br /> cardboard). 6 . 14 FUNDING <br /> Improvements for the construction of the <br /> • Provide interior storage areas for recyclables infrastructure must be installed to develop <br /> and green waste and adequate recycling the Project Area. The infrastructure includes <br /> containers located in public areas. without limitation, the roadways network <br /> (streetlights, traffic signals, medians and joint <br /> 6 . 13 CONSTRUCTION trench within roads designated as curb to curb <br /> P H A S I N G only), water system and infrastructure, sewer <br /> Construction within the Project Area is expected treatment and infrastructure, and fire protection <br /> to occur in phases. Phase 1 area development and infrastructure. All utility Improvements as <br /> is expected to occur within five years, while full described above will be constructed and funded <br /> build out of the Project Area is expected to be or financed by property owners. <br /> completed within 10 years, depending on market <br /> conditions, demand, and other relevant factors. Improvements to be constructed by property <br /> Actual development of the Phase 1 area owners, may require appropriate security by the <br /> County. For any shared improvements that will <br /> will be according to approved applications for be constructed in the future, the applicants will <br /> tentative subdivision maps and individual, site- be required to provide an appropriate security <br /> specific development projects. To facilitate and acceptable to County, in the amount of the <br /> implement development of the Project Area applicants' pro-rata fair share of the cost of said <br /> improvements based on acreage. <br /> CHAPTER 6 <br /> 6-24 <br />