Laserfiche WebLink
ADM I N ISTRATION <br /> INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN * PHASE 2 <br /> 8 . 1 SPECIFIC PLAN amendment to the Specific Plan will be typically at <br /> ADM I N ISTRATION the request of the property owners. <br /> The Specific Plan establishes a set of regulations, Scope of Amendment <br /> development standards, guidelines, and The Director of Planning shall make the <br /> processes for development of the project, and <br /> shall constitute the General Plan and Zoning determination whether the revision is either <br /> and standards for development for the Project a Major Amendment requiring both Planning <br /> Area. The Specific Plan is incorporated into the Commission and Board of Supervisors approval <br /> and adoption, or an Administrative Amendment <br /> County's General Plan and serves as the principal <br /> regulations for all properties within the Project modification subject to the review and approval <br /> Area. In addition to the regulations contained in of the Director of Planning. Applicants may appeal <br /> this Specific Plan, properties within the Project determinations and actions of an administrative <br /> Area are subject to applicable regulations of modification to the Board of Supervisors. <br /> the County Municipal Code. To the extent any <br /> regulation in this Specific Plan conflicts with Administrative Amendment <br /> the County Municipal Code, the regulations set The purpose of the Administrative Amendment <br /> forth herein shall prevail. The review process for is to facilitate the efficient processing necessary <br /> each type of development application shall be as to develop the project that is consistent and <br /> specified in the County Municipal Code, except as meets the intent set forth in this Specific <br /> modified herein. Plan. If the Director of Planning determines <br /> that the modifications meet the criteria for an <br /> Interpretations of the Specific Plan may be Administrative Amendment, the applicant shall <br /> necessary to provide clarification to a proposed submit application materials which contain the <br /> use, a design standard, or design guideline. The necessary information as determined by the <br /> Director of Planning shall make the determination County to assist in making the findings required <br /> of substantial conformance with this Specific Plan to support approval of the amendment. An <br /> plan even when it does not conform precisely, Administrative Amendment may be processed if <br /> provided the County determines that the project determined by the Director of Planning to be in <br /> meets the overall Specific Plan vision. substantial conformance with the following: <br /> • The overall intent of the Specific Plan <br /> Amendment Procedures • The San Joaquin County General Plan <br /> The Specific Plan allows for flexibility to respond • The Specific Plan Environmental Impact <br /> to both the current and future real estate market Report (EIR) <br /> and development standards. During project build Examples of Administrative Amendments include, <br /> out amendments may be necessary to respond <br /> to changing circumstances, including building but are not limited to: <br /> • The addition of new or updated information <br /> footprint size, revisions to the design guidelines, that does not substantively change the Specific <br /> and revisions to the development standards, Plan or the finding of the EIR. <br /> or to allow for uses or conditional uses not <br /> contemplated at the time of adoption. An <br /> CHAPTER 8 <br /> 8-1 <br />