Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN • PHASE 2 June 24, 2022 <br /> • Minor adjustments to land use boundaries and Processing of Applications <br /> street alignments that maintain the general Discretionary permitting steps must occur to <br /> land use and circulation pattern. implement the Project, including the approval <br /> • Variation in permitted use types and of tentative and final subdivision maps or parcel <br /> development standards if such variations do maps, conditional use permits, Site Approval, and <br /> not substantively change the character of the Sign approval review required for development <br /> Specific Plan, does not increase demand for of individual buildings. Each of these application <br /> water, sewer or other resources, or increase processes are discussed below. <br /> traffic demand above that evaluated in the <br /> Project EIR, or are otherwise consistent with 8 . 2 SU BIDIVISIONS <br /> the current applicable County standards. The site will be subdivided via Tentative and final <br /> • Changes to infrastructure and facilities that maps. These documents will be prepared soon <br /> do not affect the level of service provided or after the rezoning and entitlement of the property <br /> affect to increase the level of development to reflect parcelization generally as contemplated <br /> capacity. in the concept presented in this Specific Plan. <br /> • Changes to, phasing boundaries or sequencing Given the fluid and market-based nature of the <br /> that do not affect infrastructure sizing, project, parcels may need to be further perfected <br /> financing districts or the provision of adequate from time to time by subsequent actions (replats, <br /> services to associated development. lot line adjustments, lot splits or consolidations) <br /> to accommodate evolving project or user/tenant <br /> Major Amendment requirements. Approval of such maps shall <br /> If the Director of Planning determines that a be governed by the Subdivision Map Act, the <br /> proposed amendment does not meet the criteria County's Subdivision Ordinance and Section 8.2 <br /> of an Administrative Amendment, a Specific Plan of the IPCSP2. All streets, sidewalks, landscape <br /> Amendment shall be required. An Amendment is areas and other public property infrastructure and <br /> required when one of the following criteria is met: other improvements shown on the subdivision <br /> application shall be in substantial conformance <br /> • Increase in building square footage above with the regulations, guidelines, and street <br /> what is approved in the Specific Plan, or network of this Specific Plan. No lot shall be <br /> evaluated in the EIR. created with size or dimensions rendering it <br /> incapable of meeting the land use, public utilities, <br /> • Any change proposed to the Plan that the or development standards of this Specific Plan. <br /> Director of Planning determines could In connection with a subdivision application, <br /> significantly increase environmental impacts the applicant shall provide to the County all <br /> and would or cause other significant information required under the Subdivision Map <br /> development impacts not studied in the EIR. Act and the County's Subdivision Ordinance and <br /> shall submit the applicable processing fee. <br /> • A Specific Plan Amendment shall be processed <br /> and reviewed in the same manner as the <br /> initial adoption and will require both Planning <br /> Commission and Board of Supervisor <br /> approvals. <br /> CHAPTER 8 <br /> 8-2 <br />