Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN • PHASE 2 June 24, 2022 <br /> 8 . 3 CONDITIONAL USE 8 . 4 SITE APPROVAL REVIEW <br /> P E R M I T The site plan depicted in this Specific Plan is not <br /> If an applicant seeks to develop a conditionally intended to be the final design solution for the <br /> permitted use (as defined in Table 3.1 of this site. It is anticipated that the site plan will change <br /> Specific Plan), the applicant shall apply for a based on market demand and individual tenant <br /> Conditional Use Permit (CUP) to the County requirements. Applicants seeking to develop any <br /> containing the data and information set forth portion of the Project Area shall prepare a design <br /> in the County's application regulations and submittal package for a County Site Approval <br /> shall submit the applicable processing fee. which contains all the information set forth in <br /> Consideration of the CUP application shall be the County Municipal Code and shall submit <br /> reviewed at an administrative level with approval the applicable processing fee. Consideration of <br /> by the Director of Planning. A CUP may be the Site Approval application shall be reviewed <br /> processed concurrently with any other necessary utilizing the Specific Plan document to ensure <br /> development application(s) for the land that is the compliance at an administrative level with <br /> subject of the requested CUP. <br /> ADMINISTRATIVE ADMINISTRATIVE <br /> CONDITIONAL USE PROCESS SITE APROVAL PROCESS <br /> PRE-APPLICATION PRE-APPLICATION <br /> MEETING MEETING <br /> APPLICANT APPLICATION& <br /> SUBMITTAL APPLICATION DEEMED SUBMITTAL MATERIALS <br /> INCOMPLETE <br /> STAFFREVIEW <br /> STAFF 30-DAY APPLICATION <br /> EVIEW/RECOMMENDATION PROJECT REVISIONS COMPLETENESS <br /> DETERMINATION <br /> CEQA REVIEW PROJECT <br /> RESUBMITTAL PROJECT DEEMED <br /> COMPLETE <br /> PLANNING <br /> DIRECTOR STAFF REVIEW/ <br /> DECISION RECOMMENDATION <br /> CONDITIONAL USE <br /> APPEALTO CEQA REVIEW <br /> PLANNING COMMISSION <br /> PREPARATION OF <br /> CONDITIONS OF <br /> APPROVAL <br /> PLANNING <br /> DIRECTOR <br /> DETERMINATION <br /> PROJECT <br /> APPROVAL <br /> CHAPTER <br /> Figure 8.1, Administrative Permit Process 8 <br />