My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084833_OWTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MICKE GROVE
>
11793
>
4200 – Liquid Waste Program
>
SR0084833_OWTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2022 8:31:20 AM
Creation date
3/30/2022 8:27:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
FileName_PostFix
OWTS
RECORD_ID
SR0084833
PE
4201
FACILITY_NAME
11793 N MICKE GROVE RD
STREET_NUMBER
11793
Direction
N
STREET_NAME
MICKE GROVE
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05910002
ENTERED_DATE
2/4/2022 12:00:00 AM
SITE_LOCATION
11793 N MICKE GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All sewers, sewer services, and manholes shall be tested and observed for obstructions and leakage in <br />accordance with the provisions of the local jurisdiction and per ASTM D3212. <br />Final acceptance and testing requirements shall conform to County of San Joaquin Standards. <br />Mandrel test of ABS and PVC pipe per County of San Joaquin Standards. <br />Pressure Test per County of San Joaquin Standards. <br />11-3.06 TELEVISION INSPECTION <br />Television inspection of pipelines shall be performed by experienced personnel trained in <br />locating breaks, obstacles and service connections by closed circuit color television. <br />Television inspection shall include the following: <br />A. Video DVDs (post) to be submitted to the County before final invoice. <br />B. Video DVDs to remain property of the County; Contractor to retain second copy for <br />his use. <br />C. Video inspections shall be conducted by a Pipeline Assessment and Certification <br />Program (PACP) certified person. <br />D. Video inspections shall be performed and documented using the Pipeline <br />Observation System Management (POSM) software. <br />All flows tributary to reach of sewer being inspected are to be completely by-passed <br />around the reach during inspection if necessary and required by County. <br />Post construction video DVDs upon completion of reconstruction of each reach of <br />sewer with the voice description, as appropriate with stationing of services <br />indicated. Data and stationing to be on video DVDs. <br />G. Should any portion of the inspection tapes be of inadequate quality or coverage, as <br />determined by the County the Contractor will have the portion re -inspected and re - <br />video DVDs at no additional expense to the County. <br />SECTION 12 - SANITARY SEWER SUMP PUMP SYSTEM AND LEACH FIELD <br />12-1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Sanitary sewerage drainage piping, fittings, and accessories. <br />B. Septic Tanks. <br />C. Pumps. <br />1.2 REFERENCES <br />A. Drawings & Specifications. <br />B. San Joaquin' County Standards and Specifications. <br />SP 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.