Laserfiche WebLink
LLNL Emergency Management Plan (EPlan) <br />Rev 27 <br />January 2022 <br /> <br /> 90 <br />define what portion of the site is considered the incident scene that the IC will retain <br />responsibility for protecting, and the balance of the site the ED will be responsible for protecting. <br />Any protective action decisions for onsite personnel determined by the EOC should be <br />coordinated with the IC. Protective actions for the public may be ordered only by public officials <br />or their designees (e.g., ACFD, LPD); the EMDO/ED will make protective action <br />recommendations only, which will be communicated to offsite officials both on Emergency <br />Notification forms and via telephone conversations with the IC and local/state officials. <br />8.6 Termination of Protective Actions <br />During an Operational Emergency, onsite protective actions will be modified or lifted at the <br />direction of the ED following recommendation by the IC. This information will be <br />communicated to appropriate onsite emergency response and facility personnel through <br />established emergency communication systems. Changes to recommendations for affected offsite <br />agencies will be communicated per PPD plans/procedures following any necessary coordination <br />with local decision-makers. <br />8.7 Emergency Shutdown of Operations <br />Emergency shutdown of operations in facilities should be performed, where practicable and it is <br />safe to do so. If this is not feasible, shutdown will be performed by knowledgeable emergency <br />response personnel. <br />Site response guides and facility procedures (e.g., Safety Plans – including Facility Safety Plans <br />and work planning and control documents) address shutdown for normal operations and <br />emergencies. These procedures, which are developed and maintained by facility personnel and <br />reviewed by the cognizant ES&H Team, are available to assist the operators in placing the <br />building in a safe condition.