My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014551
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
2780
>
2600 - Land Use Program
>
SU-88-01
>
SU0014551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 1:39:49 PM
Creation date
4/7/2022 1:27:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014551
PE
2600
FACILITY_NAME
SU-88-01
STREET_NUMBER
2780
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
19912009
ENTERED_DATE
12/7/2021 12:00:00 AM
SITE_LOCATION
2780 E FRENCH CAMP RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC : 10-15-87 <br /> SU-88-1 <br /> Traffic Circulation: <br /> Access to the subdivision would be by French Camp Road, with <br /> internal circulation provided by Loduca Way and Junction Court . <br /> Junction Court is a cul-de-sac , approximately 800 feet in <br /> length. However , the Department of Public Works is requiring <br /> that Junction Court to the east boundary of the subdivision be <br /> reserved for emergency access and a future 50-foot right-of-way <br /> street . Parcels to the south of the project will have access <br /> to French Camp Road by way of the existing easement along the <br /> railroad tracks. <br /> French Camp Road is a busy major collector , with an increaQe in <br /> activity during peak agricultural seasons. The addition of <br /> nine residences to the area would slightly increase the <br /> congestion on French Camp Road. The Department of Public Works <br /> Is requiring a dedication and improvement of French Camp Road <br /> on the subdivision side in conformance with an 84-foot right-of- <br /> way. Direct access to French Camp Road from Lots 1 and 6 shall <br /> be restricted. <br /> FACILITIES/SERVICES : <br /> The parcels of the subdivision shall be served by private wells <br /> and septic systems . Storm drainage shall be contained on the <br /> site . The Pacific Gas and Electric Company will serve the sub- <br /> division and is requesting a 10-foot-wide public utility easement <br /> on all street frontages within the subdivision. <br /> It should be noted that the South San Joaquin Irrigation District <br /> owns , operates, and maintains facilities within the proposed <br /> development . The District ' s concerns and requirements shall be <br /> covered under the Conditions of Approval. <br /> ENVIRONMENTAL CONSIDERATIONS : <br /> An Initial Study for this project was prepared on September 2 , <br /> 1987 . Any possibly significant effects will be reduced to a less <br /> than significant level by conditions of approval. On the basis of <br /> the Initial Study, a Negative Declaration was prepared. <br /> -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.