Laserfiche WebLink
LG 162 -2 - 4 - <br /> If the results of post- installation testing indicate that the UST system is leaking <br /> liquid or vapor , the owner or operator must take appropriate actions to correct the <br /> leakage , and retest the system using the same approved test method until the <br /> system is no longer leaking liquid or vapor . <br /> 7 . What requirements apply to a UST installation if installation started prior to <br /> July 1 , 2003 , but is not completed until after July 1 , 2003 ? <br /> If the tank and associated piping are not placed in the ground prior to July 1 , <br /> 2003 , the UST is subject to the new installation and monitoring requirements of <br /> H & S Code , Section 25290 . 2 . [ H &S Code , § 25290 . 2 . ] As always , the local <br /> agency must have approved the installation plan prior to placement of the tank <br /> and associated piping in the ground . <br /> Please note the following for a UST placed in the ground prior to July 1 , 2003 , <br /> following approval of the installation plan by the local agency . Such a UST is not <br /> subject to the new installation and monitoring requirements of H & S Code , <br /> Section 25290 . 2 . However , the owner/operator of that UST system is required to <br /> perform a one-time ELD test on or before January 1 , 2005 , if the UST system is <br /> located within 1 , 000 feet of a public drinking water well . [ H & S Code , <br /> §25290 . 2 ( 1) (3) ; H & S Code , §25292 . 5 ( a ) and ( b ) . ] <br /> 8 . Does a repair or modification to a UST , NOT installed in accordance with <br /> H & S Code , Section 25290 . 2 , subject the UST to the requirements of this <br /> section ? <br /> No , not unless the tank is replaced . USTs only become subject to H & S Code , <br /> Section 25290 . 2 when the tank is replaced . Therefore , for USTs installed prior to <br /> July 1 , 2003 , replacement of spill containment , sumps , product piping , vapor <br /> recovery piping , or vent piping would not subject the component or the UST <br /> system to the new installation and monitoring requirements of H &S Code , <br /> Section 25290 . 2 . <br /> 9 . What components of USTs installed on or after July 1 , 2003 and prior to <br /> July 1 , 2004 are required to be monitored in accordance with H &S Code , <br /> Section 25290 . 2 ( d ) ? <br /> As for all USTs installed since January 1 , 1984 , USTs installed on or after July 1 , <br /> 2003 and prior to July 1 , 2004 must also be equipped with a continuous <br /> monitoring system " capable of detecting the entry of the hazardous substance <br /> stored in the primary containment into the secondary containment . " [ H &S Code , <br /> §25290 . 2 (d ) ; CCR , §2630 (d ) . ] All sumps , UDCs , and the interstitial spaces of <br /> tanks and piping ( including product , vent , vapor recovery , and fill pipe ) must have <br /> sensors that are capable of detecting liquid releases from the primary <br /> containment . Components subject to the monitoring requirement of Section <br /> California Environmental Protection Agency <br /> (a Recycled Paper <br />