Laserfiche WebLink
AUG- 9-99 MON 8: 13 AM 7-H TECHNICAL SVC GRP FAX N0. 5302732290 P. 2 <br /> WASTEWATER TREATMENT & DISPOSAL SYSTEMS <br /> TECHNICAL DESCRIPTION AND COST PROPOSAL <br /> FOR THE <br /> OLMSTED DEVELOPMENT PROJECT <br /> FIRST PHASE <br /> Discussion: <br /> The following is a Technical Description of proposed "Turnkey" Wastewater Treatment, <br /> and Effluent Disposal Facilities for the Olmsted Development Project located in San <br /> Jouguin County, California. The proposal is based on preliminary information illustrated <br /> on a Tentative Map,Tract#2927,furnished by Mr. Olmsted. The development is to be <br /> developed in three(3)phases. This proposal is based on providing facilities for Phase#1 <br /> which consists of forty-nine lots. Plant location and effluent disposal facilities however <br /> take into consideration the development of Phase#2 and Phase#3. The technical <br /> proposal is replete with innovative solutions for small developments. The technical <br /> solutions are based on solid field experience and State of the Art Treatment and <br /> DisposaVReuse Systems. <br /> Proposal Basis: <br /> The Wastewater Systems are to treat and disposc/rcuse the wastewater emanating from a <br /> new development. Wastewater flow assignments are based on accepted waste flow <br /> standards for medium to upper income families with housing that includes modern <br /> amenities such as dishwashers, garbage disposals, washing machines and multi bathroom <br /> facilities. The rates are further based on housing with an average of three(3)bedrooms. <br /> Waste Load Calculations: <br /> Identification Number Building Unit Total <br /> of Waste Origin of Units Phases Flows Flows <br /> aVda (gal/day) <br /> Spaces/lots 49 Phase#1 350 17,150 <br /> Spaces/lots 34 Phase 92 350 11,900 <br /> Spaces/lots 40 Phase#3 350 14,000 <br /> Ultimate Build Out Total Flow(gpd) Total: 43,050 <br /> Use: 43,000 <br /> Note: Proposal costs are based on Phase#1 flows only. <br /> 1 <br />