Laserfiche WebLink
JST SYSTEM DRAWING INFORMATION <br /> V/ Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> Plans drawn to scale in non-erasable print. / <br /> ✓ Plot plan to show location of tanks and all associated piping. <br /> V. <br /> v Striker plates or drop tube-mounted bottom protectors illustrated b ow all accessible openings. <br /> ✓ Tank cross-sectional diagram. <br /> 0 6 V Detail of tank, associated piping, excavation and cover. <br /> l/ Tank(s) and piping approved by a nationally recognized indep ndent testing organization. [Title 23, Chapter 16, <br /> tV! Article 3, Section 2631 (b) & 26351 <br /> g ✓ Verification of product compatibility with the tank(s), iping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> _ Manufacturer's written installation instructions for ank(s), piping, monitoring devices, etc. <br /> erformed on both primary (1') and <br /> 10. <br /> At the installation site, prior to installation, a ightness test shall be p <br /> secondary (20) containment systems before coverin [Section 2635 (a) (3) 8 (4)7 <br /> 11. _L/ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHO from the testin company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> # * <br /> TANK # # !/� # ,Z 3 7 <br /> aZ 0 of o S oto I:� 12 ono I:t- ao1� q(I 1-- (a2 p ri o t <br /> CAPACITY MM__ �J, �CderhW¢ld ModeVM 4�'��. /• aO� Wew. <br /> �OoIQrMW /'1�� <br /> MANUFACTURER nn n S l c StAj� E+#94 FPO <br /> COMPOSITION `� F0 �+ l n <br /> MODEL �Os�e�llr 6 f e� 1G 0aH-ej� �o afw b cu ,.tj <br /> ,S�.i,, &Sj"4 Gafol� eJ Q, e.f e.1 <br /> PRODUCT �,f 1 1� \ ' <br /> CORROSION PROTECTION �Q- i` �kbIQ�W��I <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> METHANOL <br /> 13, TANK(s) TO BE INSTALLED <br /> ✓ SALLED lad wi h fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> A. <br /> - /coatings or overings. <br /> Tested at the installation site using an electric resistance holiday detector. <br /> Vacuum applied to interstitial space. <br /> g, F'16efgl ss <br /> test and soap bubble test prior to installation. <br /> (1) Installation instructions require an air <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C, N n-clad steel tank (Section 2635 (a) (2) (A)] <br /> ank, piping and components (nuts, bolts, washers <br /> (1) Cathodic protection provided for entire t <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />