Laserfiche WebLink
Flexible Underground <br /> 12.3.5 Mounting the Riser Pipe Assembly 13.0 FLEXIBLE PIPE FABRICATION <br /> For shear valves other than Environ shear After all plumbing trees have been installed inside the tank <br /> valves install the valve mounting plate to the sumps and riser assemblies installed into either the deep or <br /> installed shear valve using the fasteners shallow dispenser sumps or deep dispenser pans, fabrication <br /> provided and mount the entire riser pipe and installation of the flexible piping may proceed. <br /> assembly to the stabilizer bar ofthe dispenser <br /> sump or pan.Move the pipe assembly into <br /> the correct position for alignment with the 13.1 Pipe Handling At Jobsite <br /> dispenser inlet and tighten bota For Environ It is recommended that the carton be placed in the sunlight <br /> shear valves,the shear valve mounting plate several hours before measuring and cutting the pipe, so the <br /> need not be installed. pipe may relax for easier extension when measuring. <br /> 12.3.6 Installing Entry Boots IMPORTANT: Do not drag to pipe sections or step on the <br /> flexible piping during installation to avoid damage to the piping. <br /> For dispenser pan applications only,slide <br /> the flexible entry boot up the jacketed riser `' '' 13.2 Cold Weather Pipe Handling <br /> pipe and into the predrilled boot opening GeoFlex®flexiblei in can be installed <br /> and stud holes underneath the bottom of <br /> the dispenser pan. Fasten the flexible in ambient temperatures as low as zero <br /> p g <br /> degrees,provided that the flexible piping , <br /> entry boot to the bottom of the pan using has been sufficiently warmed prior to <br /> the metal compression ring and nut <br /> fasteners. Next tighten the band clamp unrolling. If the pipe is unrolled and <br /> around the jacketed riser pipe. straightened while it is warm,it will cool in <br /> a straighter position making it easier to <br /> install. For cold weather installations <br /> where the ambient temperature is below <br /> 12.4 Contained Riser w/ Riser Adapter 40' F (5°C), it is recommended that the <br /> This contained riser pipe assembly may be piping cartons be placed in a warm room <br /> installed inside a dispenser sump, a deep for hours directly prior to installation. If this is not possible,then a small <br /> dispenser pan or within. They are fitted �_ hole should be cut in the top center of the lid of the carton for insertion <br /> With the riser jacket kits to secondarily of the nozzle of a conventional hair dryer. For piping reels,place a tarp <br /> contain the steel riser pipe and riser pipe over the reel and then insert the hair dryer nozzle directly into the end of <br /> adapters to seal-off to the top end of the the piping.If this pipe warming procedure is done,do not use the first <br /> steel riser pipe. These types of riser pipe 12"of the pipe due to possible damage by the hair dryer.Depending on <br /> assemblies may be fitted at their lower end the ambient temperature,it may take up to an hour to warm the roll of <br /> with only a coaxial tee or elbow fitting <br /> piping sufficiently. <br /> depending on the application. <br /> Follow the previous installations under 12.3 except for the following: 13.3 GeoFlex Measuring <br /> When measuring the distance between containment sumps or <br /> (11. Install the riser pipe adapter onto the pans to determine the proper length of a flexible pipe section to <br /> steel riser pipe assembly instead of the be installed, it is important to consider that the pipe is flexible <br /> shear valve itself. Center the riser pipe and will not be installed perfectly straight. A slight weaving of <br /> adapter at the top edge of the riser jacket. the pipe in the piping trench is recommended to compensate for <br /> expansion and contraction. The recommended measuring and <br /> cutting procedures for the GeoFlex piping are described below: <br /> 13.3.1 Direct Pipe Burial Applications <br /> When measuring for direct burial of GeoFlex®-S and GeoFlex®-D, <br /> (2). Place lubricant(White Lithium grease �y the measuring points will be from the face of one adapter/fitting <br /> or 0-ring lubricant)generously around the bl to the next. If swivel couplings and fittings are used,subtract 1" <br /> steel riser pipe, 1/2" below the shear valve _ to allow for the length of the two pipe couplings and cut the <br /> adapter as shown. piping to that length. If barbed fittings are used,add 3-1/2"for 1- <br /> 1/2" piping, 4-1/2" for 2" piping and 6" for 3" piping. For coax <br /> Al application, no modification to the measurement is necessary. <br /> (3). Position the rubber bushing securely ►'° ,,;. <br /> into riser pipe adapter.Tighten the riser -- <br /> pipe nut securely onto the shear valve ; <br /> `?y <br /> adapter so that the rubber bushing is fully <br /> compressed.Do not use any tools to <br /> secure the coax riser nut. <br /> 15 <br />