My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:53:16 PM
Creation date
5/12/2022 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flexible Underground <br /> 18.3.1 Air Pressurize the pressure rating of the submersible pump does not exceed A) <br /> Gradually apply air pressure into the flexible piping line. Do not that of the maximum operating pressure of the pipe. <br /> exceed sixty pounds per square inch (60 psi) or 416 kPa. <br /> 19.0 PERIODIC LINE LEAK DETECTION <br /> 18.3.2 Air Pressure Holding Local or federal regulations may require periodic line leak detection <br /> Maintain pressure for a minimum of three hours, making sure tests be performed on the installed piping system. Testing <br /> that there is no drop in pressure. requirements affect both suction and pressure piping systems. A <br /> typical requirement is thatthe piping lines must be tested on an annual <br /> Note: Significant temperature changes can result in a basis at one and one half(1-1/2)times the normal operating pressure. <br /> pressure reading differential. The typical test method will require detection of 0.10 gallons (.3785 <br /> liters)per hour with a 95%probability of detection and a 5%probability <br /> of a false alarm. <br /> 18.3.3 Air Pressure Holding for Coax The typical test procedure requires the piping be isolated from the tank <br /> PRE-BACKFILL Maintain pressure for a minimum of three hours. and the piping line pressurized to 1-1/2 times the normal operating <br /> POST-BACKFILL Maintain pressure for a minimum of three pressure.A test apparatus which is connected to the piping line will <br /> hours. then measure the bleedback volume of the piping system.Acceptable <br /> bleedback volumes on different types of piping systems will vary due <br /> 18.3.4 Test Tube Gauge Check to their inherent expansion and contraction characteristics.Therefore, <br /> modifications in the testing procedures are required for piping systems <br /> During pressurizing,check the reading on the test gauge which which have significant expansion and contraction characteristics.This <br /> should be connected to the Test Tube of the interconnected characteristic is measured in the average volume increase, per lineal <br /> interstitial line. Any increase in pressure will indicate a leak. foot under a standard test pressure. <br /> 18.3.5 Soap Test 19.1 GeoFlex Piping Expansion Characteristics <br /> During the pressurizing period, apply a soapy water solution to <br /> all piping connections and inspect for bubbles. GeoFlex Piping is a fiber reinforced smooth bore flexible pipe <br /> which demonstrates only minor expansion and contraction <br /> characteristics during pressurization and depressurization, <br /> 18.4 Hydrostatic Testing Procedures similar to that of fiberglass piping. These physical <br /> The recommended hydrostatic pressure integrity test procedure characteristics reduce the affect on the "bleedback tolerances" <br /> for the flexible supply piping is one and one half(1-1/2)times the permitting a more accurate testing procedure. <br /> normal operating pressure of the submersible pump, not to Piping Expansion Characteristics <br /> exceed sixty pounds per square inch (60 psi). Make sure the <br /> flexible pipeline is isolated from the underground storage tank Pipe Description Volume Increase <br /> and the above ground product dispenser when conducting this 1-1/2" GeoFlex Flexible Piping + 0.0015 <br /> test. All pressure testing should be conducted by qualified and <br /> experienced personnel. Do not attempt to disconnect couplings, 2" Fiberglass Piping + 0.00045 <br /> caps, or plugs unless the air pressure has been released. 1-1/2" Flexible Connectors + 0.0060 <br /> Environ recommends hydrostatic testing on all sumps after <br /> installation to check for proper sealing of joints and connection. <br /> *Volume increase=gallons per lineal foot at 60 psi.pressure <br /> 18.4.1 Water Filling <br /> Gradually introduce water at the lowest point into the piping 20.0 INTERSTITIAL INTEGRITY TESTING <br /> system and bleed off air at the highest point in the piping system Prior to supply filling and periodically over the life of the Geoflex <br /> through an open valve. The hydrostatic pressure applied should system, it is recommended that interstitial testing be used to <br /> not exceed 60 psi. ensure that the secondary containment is intact. <br /> 18.4.2 Pressure Hold Inspection 20.1 Air Pressure/Soap Testing <br /> Maintain pressurization for a minimum of one hour making sure After the inner primary flexible pipe and piping connections have <br /> there is no drop in pressure. Significant temperature changes been integrity tested,the entire interstitial space of the GeoFlex <br /> can result in a pressure reading differential. During the pipe must remain connected and only then should the outer <br /> pressurizing period, inspect all piping connections for leaks. containment jacket be integrity tested. The connections of the <br /> test boots are illustrated and explained in section 15.2 of this <br /> 18.5 Supply System Filling product manual. <br /> After the supply piping system has been integrity tested and 20.2 Testing Assembly <br /> connected to the product dispensers,filling of the pipe line may <br /> commence. There should be a controlled method for filling the Inside all tank sumps the test gauge is connected to the end of the test <br /> supply line which provides an adequate means of removing air tube.Thetest gauge consists of an air au ewithamaximum <br /> PPY P q 9 9 9 Y 9 9 <br /> from the lines. Do not start pumps with empty lines, as it may 15 psi scale connected to a 1/4" brass tee fitting with a male 1/4"thread. <br /> damage the pipe and its connections. Small amounts of trapped The gauge threads directly into female brass fitting of the test tubes.The <br /> air should dissipate under normal operations. Make sure that test tube in the terminating sump shall be capped with a.25"brass plug. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.