My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:53:16 PM
Creation date
5/12/2022 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flexible • • • • • • Manual environ <br /> 20.3 Air Pressure Testing for Stage II vent lines for both balanced and assisted systems. <br /> Gradually pressurize the piping's . IMPORTANT: GeoVent is available in both 2" and 3" <br /> interstitial space through the test sizes and is not intended for the transfer of fluids. <br /> tube to no more than 10 psi. During <br /> the pressurization period, apply an <br /> air pressure soap test to the entire 23.1 GeoVent Connections <br /> piping line. After testing, disconnect The GeoVent piping system requires the use of swivel couplings <br /> the air hose and lay the test tube <br /> down into the bottom of the tank &fittings or barbed fittings which are designed and U.L.a Listed <br /> sump. for direct burial applications eliminating the necessity for <br /> secondary containment. Unlike supply piping connections <br /> IMPORTANT: Coax fittings Environ permits GeoVent swivel and barbed connections to be <br /> require interstitial testing before and after backfill. direct buried. <br /> 21.0 ROUTINE SUMP INSPECTIONS >=: z�^x <br /> i. .KIle <br /> Visual inspections of all containment sumps should be made on <br /> a routine basis to check for water infiltration or for any signs of <br /> leaking product. An electronic or mechanical shut-off leak <br /> detection system is recommended for all containment sumps. ` <br /> When changing fuel filters at the dispenser, make sure an <br /> spilled product is cleaned out of the bottom of the dispenser ? '' ^� <br /> sump to prevent a possible fire hazard. <br /> 23.1.1 Tank Connections Within Tank Sump <br /> If the tank's vent connection is <br /> 22.0 PERIODIC INTERSTITIAL TESTING contained within a tank sump, the — <br /> For periodic integrity testing of the interstitial space of the vent line should enter through a _ <br /> GeoFlex®-D Pipe there is a different setup procedure for systems flexible entry boot.A male or female <br /> using coax fittings versus steel fittings with connector tubes. adapter fitting should be used to <br /> Both applications should have test tubes connected on each complete the connection within. <br /> end. If they have been disconnected then reconnect them <br /> before testing.Follow the air pressure test procedures below for <br /> interstitial integrity testing. <br /> 22.1 Reconnect Test Tubes <br /> If necessary, reconnect the test tube located inside the tank <br /> sump to the test boot. Connect the test gauge assembly to the 23.1.1 Tank Connections Extractor Fitting <br /> top end of the test tube. If the tank's vent connection is not <br /> contained within a tank sump,then a <br /> 22.2 Reconnect Connector Tubes male or female adapter fitting should <br /> be installed in the extractor fitting to <br /> If the piping system includes test boots with connector tubes accept the GeoDuct`I Piping. <br /> then make sure all connector tubes have been reconnected. <br /> 22.3 Plug Test Tube <br /> Plug and seal the test tube fitting located at the terminating end <br /> of the flexible piping line. <br /> 22.4 Air Pressurize 23.1.2 Pipe Branch Connections <br /> In between the beginning and end of <br /> 1� IT t, <br /> Pressurize the interstitial space to 10 psi for a period of one hour, a GeoVent piping line it may be <br /> In accordance with section 20 interstitial integrity testing If necessary to install tee fittings to <br /> required,disconnect all tubes after test. interconnect numerous pipe runs <br /> into a main return line to the tank. <br /> This piping application is most <br /> 23.0 GEOVENT'" FLEXIBLE VENT PIPING common with stage II vapor recovery <br /> lines. For this application the coax <br /> This flexible piping is used for the transmission of aromatic fuel junction tee or coax branch tee may <br /> vapors and is designed for direct burial of the pipe and fittings be used. <br /> without the requirement for secondary containment. The <br /> intended use for GeoVent is for venting vapors from an <br /> underground storage tank to a remotely located vent stack or <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.