Laserfiche WebLink
island Installation <br /> Metal Island Forms <br /> A typical installation application for dispenser sumps/pans is to mount them Each dispenser sump/pan is fitted with a full perimeter rigid frame which can <br /> inside a pre-engineered metal island form. It is important that the sump/pan be mounted to some type of support bar. Adjustable support bars are avail- <br /> be mounted in such a manner that the top of the outside strut is flush with the able with some types of pre-engineered metal island forms. Other island forms <br /> concrete surface of the finished island. The plastic rain lip should extend 1" may require additional field installed support bars. Refer to the details below <br /> above the concrete to prevent surface run-off from entering the sump. for additional information. <br /> Top Frame Support Under Frame Support Top Frame Support <br /> Fasten the sump/pans frame to two pieces of Set the sump/pans frame over two metal cross Existing concrete islands can be modified to <br /> lumber which will span across the top of the supports which span across the metal island accommodate the dispenser sump/pan by <br /> metal island form and secure the sump. form and secure the sump. enlarging the pipe access opening. <br /> Existing o,,Penser <br /> _ Opening I Sump <br /> Location <br /> Wood [— O O 4 Metal O O <br /> 2x4 supports J <br /> Supports Enlarged <br /> Opening <br /> N. <br /> Pipe/Conduit <br /> l :H: <br /> I <br /> Flexible Entry Boots GeoDuct Boots Flexible Entry Boots Conduit Entry Boots Stage II Entry Boots <br /> Installed in the sidewall Installed in the sidewail Installed in the bottom of Installed in the bottom of Installed in the bottom of <br /> of Dispenser Sumps to of Dispenser Sumps to Dispenser Pans to provide Dispenser Pans to provide Dispenser Pans to provide <br /> provide a liquid tight seal for provide a liquid tight seal for a liquid tight seal for all pipe a liquid tight seal for 3/4" a liquid tight seal for 1-1/2" <br /> all pipe and conduit entries. GeoDuct containment pipe entries and flexible isolation conduit pipe entries. to 1"Stage II pipe entries. <br /> and GeoFlex flexible pipe. tubes. <br /> For specific sizing,see chart below. <br /> Flexible Entry Boot Sizes <br /> Hole Saw Hole Saw <br /> Boot ID Size Size Part No. Boot ID Size Size Part No. <br /> .84" 1/2"Rigid Conduit 2-3/8" FEB-3050 2.37' 3"Standard Rigid Pipe 4-1/4" FEB-6300 <br /> 1.05' 3/4'Rigid Conduit 2-3/8" FEB-3075 3.50' 3'Standard Rigid Pipe 4-1/4' FEB-6350• <br /> 1.32" 1"Rigid Conduit 2-3/8" FEB-3100 3.90" 3-1/2"Custom Pipe 5-1/2' FEB-7390 <br /> 1.81" 1-1/2"Standard Rigid Pipe 2-3/8" FEB-3150 4.50' 4"Standard Rigid Pipe 5-1/2' FEB-7400 <br /> 1.81" 1-1/2"GeoFlex Pipe 4-1/4" FEB-6150 4.50" 4"GeoDuct Conduit 5-1/2" GDB-7450' <br /> 2.37' 2"GeoFlex Pipe 4-1/4" GFB-6200 6.50 6"Standard Rigid Pipe Sabre Saw FEB-8600 <br /> 2.37" 2"Standard Rigid Pipe 4-1/4" FEB-6200 4.50" Sump Access Boot 5-1/2" SAB-7400 <br /> These boots require a Split Reducer/Test Donut,sold separately. See below. <br /> Split Reducers/Test Donuts Part No. <br /> For all GeoDuct pipe entries,used to seal <br /> Boot=Description w/airstem wo/airstem <br /> the GeoDuct conduit to GeoFlex pipe. The 2" To seal 3"GeoDuct to 1-1/2"GeoFlex piping STD-3015 SRD-3015 <br /> donut is inserted into the appropriate size 2.5* To seal 3"GeoDuct to 2"GeoFlex piping WA SRD-3020 <br /> GeoDuct Boot and a band clamp secures <br /> a tight, leak-proof seal. Available with 2" To seal 4"GeoDuct to 1-1/2"GeoFlex piping STD-4015 SRD-4015 <br /> (STD series) or without (SRD series) 2.5' To seal 4'GeoDuct to 2"GeoFlex piping STD-4020 SRD-4020 <br /> airstem. See chart for exact specifications. <br /> (2)1.1" To seal 4"GeoDuct to two 3/4"GeoFlex lines STD-4077 SRD-4077 <br />