Laserfiche WebLink
6.0 Removable "screw-in"lifting lugs and unused lank 9'S4.IMA7nNG <br /> i <br /> openings: <br /> If your fiberglass coated tank has removable, <br /> "screw-in" type lifting lugs, remove lifting lug and treat <br /> as an unused opening. Any unused threaded UNUSED OPENING <br /> opening, shall have a metal pipe plug properly doped <br /> and securely installed in the opening. Rough up the <br /> area around the threaded opening with sandpaper. ; <br /> Mix resin and saturate fiberglass mat. Place the <br /> saturated mat over the unused opening and apply SANDED AREA— <br /> additional resin, dabbing the mat into place. <br /> i <br /> I <br /> 1 <br /> I I <br /> 7.0 Lug covers for permanent lifting lugs attachments: <br /> If your fiberglass coated tank has permanently welded APPLY SEALANT TO PRESS DOWN <br /> lifting lugs, then your kit will include non-metallic lifting UNDERNEATH I FIRMLY <br /> lug covers and a tube of sealant. Install lug covers SIDE OF LUG <br /> over lifting lugs per the following instructions. COVER <br /> Rough up area around the permanently affixed j 1 <br /> lifting lug. Apply the sealant to the underneath side of �a <br /> the lug cover and place lug cover over the lifting SANDED <br /> lug. Push lug cover down firmly until sealant AREA <br /> protrudes out around the perimeter of the lug cover. APPLY ANY EXTRA <br /> Apply any extra sealant to outside edges of the lug SEALANT TO OUTSIDE EDGE <br /> cover to assure a moisture tight seal. OF LUG COVER TO ASSURE <br /> Allow at least two (2) hours for sealant to cure before A MOISTURE TIGHT SEAL <br /> backfilling over lug covers. Care should be exercised <br /> not to hit or damage lug covers during the backfilling <br /> operation. <br /> CLEAN PIPE <br /> ll► <br /> PRECUT MAT <br /> 8.0 Pipe connection covers: 1 <br /> Sand areas where matting is to be placed on tank and I <br /> piping. Saturate matting with resin and place mat <br /> around pipe as shown in illustration. SANDED AREA <br /> Dab mat into place with additional resin if required. I <br /> Saturate 1"wide fiberglass strips, starting at the base I <br /> of the pipe,wrap the fiberglass strip around the pipe, <br /> lapping the mat 1/2 its width, see illustration. t'MAT STRIP <br /> I <br /> Note: Finishing Instructions are not complete until all <br /> exposed steel surfaces on tank are sealed with fiberglass <br /> I <br /> resin. <br /> I � <br /> Fil,Ower .Finishing 1-aun—for Gout C"cd Tnib.pob W99 <br /> I <br />