Laserfiche WebLink
12 inches between tank measured from - tl 8.1 Special care shoula used to ensure that the <br /> outside edge. backfill is properly installed to evenly support the <br /> REMOVE LARGE OR SHARP ROCK bottom quadrant of the tank. <br /> FROM EXCAVATION NOTE: Do not backfill in layers using different materials. <br /> MINIMUM 12" <br /> FW016d Wade <br /> SLOPE S <br /> ;1F <br /> DETERMIi. <br /> NED <br /> BY SC GLASTEELN <br /> 6 <br /> SAND 12 <br /> PEA GRAVEL 2': <br /> Specialnn <br /> :. plecenlerrt and <br /> required �. <br /> ANCHORING <br /> 7.0 Certain situations require the use of properly 8.2 If tank must be ballasted during the backfill <br /> designed anchor straps to overcome existing <br /> buoyant forces. The straps are used in conjunction procedure,at no time may the liquid exceed the <br /> with a concrete holddown slab or deadman height of the compacted backfill surrounding the <br /> anchors. tank. <br /> CAUTION: Use of steel cable or round 8.3 The tank shall be encompassed by the proper <br /> bar is prohibited. backfill and extending to a minimum of 12 inches <br /> over the top of the tank. <br /> 8.4 Areas subject to heavy vehicular traffic shall have <br /> a protective cover of 18 inches clean,compacted <br /> N THE USE OF STEEL soil with either 6 inches of reinforced concrete or 8 <br /> CABLE AND ROUND BAR inches of asphalt paving. If compacted soil is the <br /> AS HOLD DOWN STRAPS <br /> IS PROHIBITED only cover, it shall be a minimum of 36 inches <br /> deep. <br /> 8.5 Areas not subject to heavy vehicular traffic shall <br /> have a protective cover of a minimum 18 inches of <br /> clean compacted soil covered by 4 inches of <br /> reinforced concrete or 6 inches of asphalt paving. If <br /> compacted soil is the only cover,it shall be a <br /> 7.1 A pad of inert,insulating,dielectric material must minimum of 24 inches deep. <br /> be used to separate the anchor strap from the 8.6 Finishing Instructions; A fiberglassing kit is <br /> tankshipped with tank and provides materials to cover <br /> unused openings and external attachments, such <br /> BACKFILL as lifting lugs. All finishing work will be done <br /> 8.0 Only the following approved backfill material may prior to backfilling. <br /> be used. 9.0 For Glasteel 11 warranty to be initiated,the <br /> 1. Clean washed sand. Installation Checklist must be properly filled out, <br /> 2. Pea Gravel-(particle size must be not less than by the customer,and returned to the Modem <br /> 1/8 inch or more than 3/4 inch) Welding Co. subsidiary from which the tank was <br /> 3. Washed stone or gravel crushings- fabricated. The Installation Checklist must be <br /> (angular particle size required to be not less returned within 30 days after date of installation <br /> than 1/8 inch or more than 1/2 inch) or 90 days after the shipment date to jobsite, <br /> whichever comes first. <br /> ............. SUBSIDIARIES: Corporate Office (502)685-4400 <br /> 1-113. <br /> . .......— Modern Welding Company of Owensboro, Inc (502)683-5323 <br /> Modern Welding Company of Ohio, Inc (614)344-9425 <br /> rock <br /> —. .... Modern Welding Company of Florida, Inc (407)843-1270 <br /> 3 <br /> 'a <br /> Modern Welding Company of Texas, Inc (713)675-4211 <br /> Modern Welding Company of Texas, Inc (817)636-2215 <br /> Modern Welding Company of Iowa, Inc (319)754-6577 <br /> 2• Modem Welding Company of California, Inc (209)275-9353 <br /> Modern Welding Company of Georgia, Inc (706)722-3411 <br /> W <br /> ............. <br /> FORM Glas2ins, OWN MWCo <br />