My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:53:16 PM
Creation date
5/12/2022 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;1 <br /> 11 <br /> <<1 <br /> C <br /> A Lic. #177928 Service Stations • Commercial <br /> Lic. #33943 <br /> 3633 SEAPORT BOULEVARD <br /> WEST SACRAMENTO, CALIFORNIA 95691 <br /> (916) 372-1985 • Fax (916) 372-0911 <br /> March 21, 2001 www.fillner.com <br /> Alison Youngblood, RHES <br /> San Joaquin County Environmental Health <br /> 304 East Weber Avenue,Third Floor <br /> Stockton, CA 95202 <br /> Re: Permit No. SR0024169 <br /> Love's County Stores <br /> New Facility,Jack Tone Rd.,Ripon <br /> Dear Ms Youngblood, <br /> We hereby request an addendum to the plans on the above project for your approval as follows: <br /> 1. Install A.O. Smith Red Thread II Doublewall fiberglass piping replacing the Environ Geo- <br /> Flex flexible piping. Specification sheet attached. Diesel Truck islands would be 3"primary <br /> with a 4" secondary containment. Auto fuel islands would be a 2"primary with a 3" <br /> secondary containment. Complete system to be installed as per manufacturer specifications. <br /> 2. Install two FESTP-5 FE PETRO 5-Horsepower 6"submerged turbine pump, 208-230v 60 <br /> HZ, 3 phase with siphon replacing the Red Jacket Turbine pumps as specified on the Diesel <br /> system. Install FE-HC-MLD-D 3" High Capacity Mechanical Line Leak Detector for Diesel <br /> fuel on both turbines. <br /> 3. Install two FEISTP-3K FE PETRO 2-Horsepower variable speed turbines with IFS replacing <br /> the Red Jacket Turbines as specified on the Auto Fueling system. Install FESTP-MLD <br /> Standard Mechanical Line Leak Detectors on both turbines. <br /> 4. Both FE PETRO turbine systems to be operated by PE PETRO Smart Controllers. <br /> I hope these changes meet with your approval. If you have any questions, comments or concerns <br /> in this regard, please give me a call at(916) 372-1985. <br /> Respectfully yours, <br /> Fill er onstruction,Inc. <br /> aC <br /> Craig . Be <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.