My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: NOTE: NOTE: <br /> 3"EZ-Fli%FEMALE GLUE PIPE FOR THE TURBINE PUMP HEA05 SHOULD BE 3'Q-FIT%FEMALE GLUE PIPE FOR THE TURBINE PUMP HEADS SHOULD BE <br /> 2pq 204 THE TURBINE PUMP HEADS SHOULD B <br /> FIBERGLASS PIPING ROTATED SUCH THAT THEY ALLOW THE FIBERGLASS PIPING ROTATED SUCH THAT THEY ALLOW THE H ROTATED SUCH THAT THEY ALLOW THE <br /> 1"FRP BONGED REMOVAL OF THE PROBE 1"FRP BONDED J1 B REMOVAL OF THE PROBE EXPLOSION PROOF JUNCTION BOX <br /> FO 1"FRP BONDED <br /> TURBINE POWER ]1 B TURBINE POWER 3U ]1 T4-T REMWAL OF THE PROBE N <br /> E%PLOSION PROOF JUNCTION BOX FOR E%PLOSION PROOF JUNCTION BOX FOR FEES GLASS SYSTEMS STANDARD MONITORING DEVICES ONLY TURBINE POWER J <br /> }0 CONDUIT PENETRATION T4-T 2 HP VARIABLE SPEED 30 CONDUIT PENETRATION T4- CONDUIT PENETRATION 3'EZ-Fli%FEMALE BLUE PIPE <br /> STANDARD MONITORING DEVICES ONLY(SEE STANDARD MONTORING DEVICES ONLY(SEE 116 124 4'OVER 3"FRP SIPHON (SEE NOTE#5) 204 <br /> NOTE#5) IT (IYP.OF 2) 40 30 TURBINE W/(NON-VENTED NOTE#5) RUNG(TYP,OF 2) FITTING(M.OF 2) FOR FIBERGLASS PIPING a <br /> GHEGK VPLVE ON SLAVE PIPING TO TANK#1 2 HP VARIABLE SPEED RIRBINE W/ FIBER GIASS SYSTEMS <br /> FIBER GLASS SYSTEMS 41 FIBER GLASS SYSTEMS (NON-VENTED CHECK VALVE ON SLAVE 3E 11fi 124 q"OYER}"FRP p� a Q <br /> 4"OVER 3'FRP SIPHON 116 124 PUMP)(SEE NOTE 0]) q'OVER 3"FRP SIPHON 116 124 3'x18'FLE%IBLE CONNECTOR W/ 40 <br /> PIPING TO LINK#2 3'x18'FLEXIBLE CONNECTOR W/ PIPING TO TANK#3 44 EZ-FIT MPLE%EX FLANGE(IYP.) PUMP)(SEE NOTE ]) 41 SIPHONX PIPING TO 4 1 J <br /> 4"FRP BONDED FITTING(TYR)]5 44 EZ-FIT MALE%E%FLANGE(TYP.) 4"FRP BONDED FITTING(TYP. JS 51 48 47 TANK LEVEL GAUGE PROBE 3'x10'FLEXIBLE CONNECTOR W/44 / ]5 4'TFRP 92ONDED @ 7 F Z Q <br /> TANK LEVEL GAUGE PROBE LOCATION DO IT MALE X IX FUNGE 1.-1 FlTTING(nPJ fll z IL <br /> Q <br /> 3"FRP ELBOW 118 51 40 47 LOCATION 3"FRP ELBOW 118 EXSTNG 22"AWlNAY%ATE TANK LEVEL CAUGE PROBE q] q8 51 }� 110 3-FRP ELBOW W 3 Q <br /> 2-EZ-FIT 90 DEGREE ELBOW(TlP.J 201 EXISTING 22""WAY PLATE 2"E2-FT 90 DEGREE ELBOW(TYP.)201 q 48"DW 8-SIDED FIBERGLASS LOCATION EXISTING 22"MANWAY 2 J (� Z <br /> - CONTAINMENT SUMP <br /> 4 48°AI 8-SIDED FIBERGLASS - f 3"EX-FT 90 DEGREE 201 q 48"DW B-SIDED F.G. ¢ r <br /> Z°EZ-FIT X EZ-FIT ADAPTER(lYP)206 CONTAINMENT SUMP 2"EZ-FT%Q-FR PDAPTER(IVP.)20fi _ 31 SUMP SENSOR IN HOLDER. ELBOW(TYP.) III CONTAINMENT SUMP Z U N <br /> SUMP SENSOR IN HOLDER, i'' I (SEE NOTE#3) 3"EX-PT CVJAP W/VRON 31 SUMP SENSOR IN lJ <br /> 2"EZ-FIT TETE(TYS)202 31 (SEE NOTE#3) 2"EZ-FIT TETE(IVP.)21 201 3'EZ-FIT 90 DEGREE ELBOW(PP.J SUL(ttP)200 HOLDER.(SEE NOTE#3) <br /> 201 3'EZ-Fli 90 DEGREE 2'EZ-Fi 90 DEGREE ZZ Z 8 <br /> 2'x10'FLE%IBLE CONNECTOR W/Q-FR 2"x18"FLEXIBLE CONNECTOR W/EZ-FIT 3'EZ-FIT CLAMP W/MYON 3"EZ-FIT X MALE HE% 201 Q <br /> e�I. a <br /> MALE%E%RANGE(SEE NOTE 2)(ttP. 43 ELBOW(IVP.) MALE%Ex FLANGE(SEE NOTE#2)(PP.) 43 ( 200 SEAL mp) ADAPTER(ttP.)203 ELBOW(ttP.) F d In <br /> ) 200} EZ-FIT CLAMP W/MYON 3"EZ-FIT X MALE HEX 20fi 2"EZ-FT%EZ-FIT d <br /> 2 HP VARIABLE SPEED TURBINE <br /> 2 HP VARIABLE SPEED TURBINE 36 SEAL RP.) 2 HE VARIABLE SPEED TURBINE W/ 30 _ 203 ADAPTER RUM.) PUMP W PLED <br /> PLLO 38 ADAPTER(NP.) 0 <br /> PUMP W/.1 GPH PTLD qp 3'SE FIT X MALE HEX q0 / 40 202 2"ES-FIT TETE & <br /> 203 (NON-VENTED CHECK VALVE ON STAVE C ? SECOND VACUUM SOURCE 41 (ttP') o Z U <br /> (SECOND VACUUM SOURCE 41 ADAPTER(TYP.) 41 f f 73 3"FRP BONDED PRING(IYP.) ( q, Q <br /> REG'0.)(SEE NOTE#I) ]} 3'FRP BONDED FITTING PUMP)(SEE NOTE�]) 110 116 3'OVER 2"FRP RED (SEE NOTE#]) 43 2'110'FLEXIBLE <br /> 1'FRP BONDED CONDUIT)1 (ttp) 1"FRP BONDED CONDUIT J1 PIPING(TYP.) 1'FRP BONDED CONDUIT]1 CONNECTOR W/EZ-FT <br /> PENETRATIDN FITTINGS PENETRATION FITTINGS PENETRATION FITTINGS MALE X EX FLANGE <br /> 3"OVER 2'FRP 38 2 HE VARIABLE SPEED TURBINE (SEE NOTE#2J(ttP.) <br /> BRINE SUMP RESERVOIR& 26 110 116 PIPING(TYP.) BRINE SUMP RESERVOIR& 26 q0 PUMP W/.1 GPH PLIED BRINE SUMP RESERVOIR& 26 a 4 F <br /> HYDROSTATIC SENSOR HYDROSTATIC SENSOR HYDROSTATIC SENSOR 3"OVER 2"FRP <br /> 41(SECOND VACUUM SOURCE 110 110 PIPING(ttP.) <br /> 2"EZ-FlT CLAMP W/200 B 2°7Z 11T CLAMP W/200 E RED (SEE NOTE OU 2"EZ-IT CLAMP W/2pp H <br /> MYON BEAT MPJ T4 vITON SEAL(TYP.) T4- VTON SEAL(RP.) T4- Z3 3°FRP eorvoEp <br /> 2"Q-Fli%FEMALE GL q 2'El-FIT%FEMALE GWE 04 2"¢-FT%FEMALE GWE 204 FITTING(TTP.) <br /> PIPE FOR FIBERGLASS PIPI PIPE FOR FIBERGLASS PIPING 13 (�` PIPE FOR FIBERGLASS PIPING <br /> A NOTE:G.C.TO SUPPLY BRASS TAG ON TURBINE TO INDICATE A B NOTE:G.C.TO SUPPLY BRASS TAG ON TURBINE TO INDICATE NOTE:G.C.TO SUPPLY BRASS TAG ON TURBINE TO INDICATE <br /> TQ TURBINE'1A&1B'BE <br /> ENTRANCE ROW OF CANOPY T4 T4 TURBINE"2A&2B"SERVES MIDDLE ROW OF CANOPY T42 T4 TURBINE"3A&39"SERVES EXIT ROW OF CANOPY T4 <br /> Sump Plan View a 20K Regular Unleaded Tank#1 r Sump Plan View a 20K Regular Unleaded Tank#2 Sump Plan View a 20K Regular Unleaded Tank#3 <br /> T4- SCALE:1°=1'-G" T4- SCALE:r=r-o' T4-1 <br /> A <br /> TURBINE 2 HP WHIABIE SPF£U TURBINE W/ TURBINE 2 HP VARIABLE SPEED TURBINE W/ TURBINE 2 HP VARIABLE SPEED TURBINE W/A <br /> BRINE SUMP RESERVOIR& 3Z BRINE SUMP RESERVOIR& 3Z BRINE SUMP RESERVOIR& 3] <br /> THICKENED SLAB HTOROSTATIC SENSOR 26 ACCESS 30 .1 SPH PTLD(SEE NOTE#]) THICKENED SLAB HYDROSTATIC SENSOR 2fi ACCESS 38 .1 GPH PLLO(SEE NOTE#)) THICKENED SLAB 2fi ACCESS 38 GPH PTLD(SEE NOTE#]) <br /> q0 qp HYDROSTATIC SENSOR qp <br /> SEE NOTE#4 18"nP AN 41 2 HP VARIABLE SPEED TURBINE SEE NOTE#4 18"ttP. MANHOLE 41 2 HE VPRIABLE SPEED TURBINE SEE NOTE#4 18"nP MANHOLE 41 2 HE VARIABLE SPEED TURBINE <br /> 2'CROWN MIN. W/(NON-VEMED CHECK VALVE ON W/(NON-VENTED CHECK VPLVE ON W/(NON-VENTED CHECK VALVE ON <br /> SLAVE PUMP)(BEE NOTE#]) 2"CROWN MIN. SLAVE PUMP)(BEE NOTE#]) 2'CROWN MIN. )( #) ly <br /> SEE NOTE#a SEE NOTE#4 SEE NOTE#4 SLAVE PUMP BEE NOTE ] IMIII N <br /> • • PRODUCT LINE . • • PRODUCT LINE . • • PRODUCT LINE 5 <br /> GJ m <br /> ' ° • • • TRACER TARE ' • • • 1RACER TAPE ° • . • TRACER TPPE J rCC <br /> (6'MIN.12"MAX.) (6"MIN.12°M.) • (6'MIN.12'MAX,) Q a Q <br /> 3'MIN.CLEARANCE(TYP.) • • 3"MIN.CLEARANCE RHP.) • • 3'MIN.CLEARANCE(ttP.) • • =W 3 <br /> MANOMETER&HDPE TUBING TO • 20}2"E7-FT X MALE HEX PDAPTER(IVP.) MANOMETER&HOPE TUBING i0 • _ 203 2'EZ-Fli%MILE HEX ADPPTER(TTP) MANOMETER&HOPE TUBING i0 • 20}2"E7-FT%MALE HEX ADAPTER(ttP.) 3 Y= <br /> TEST PORT FOR CONTINUITY TESTING FACE SEPT ADPPTER(1TPJ TEST PORT FOR CONTINUITY TESTING FACE SEAL PDAPTER(ttPJ TEST PORT FOR CONINUItt TESTING FACE SEPT ADAPTER(ITP.) O EE <br /> TANK LEVEL GAUGE TANK LEVEL GAUGE TANK LEVEL GAUGE <br /> 51 48 4J 51 98 47 51 48 4J Q1 Q <br /> PROBE LOCATION fit BALL VALVE-NTL PORT(ttP.) PROBE LOCATION fit BP11 VALVE-NTL PORT(1VP.J PROBE LOCATION fit BALL VALVE-NTL PORT(TYP.) `�Q <br /> EXPLOSION PROOF JUNCTION EXPLOSION PROOF JUNCTION E%PLOSION PROOF JUNCRON O <br /> BO%(SEE NOTE#5)30 BOX(SEE NOTE#5) JO BOX(SEE NOTE 105)& <br /> 5)30 V <br /> TWISTED CABLES ROUTED TO TWISTED CABLES ROUTED TO TWISTED CABLES ROUTED TO <br /> VAC&FLOAT SENSORS(IYP.) ]1 1"FRP BONDED CONDUIT VAC&FLOAT SENSORS(ttP.) Z1 1'FRP BONDED CONDUIT VAC&FLOAT SENSORS(ttP.) ]1 1"TRP BONGED CONDUIT <br /> PENETRATION FITTINGS PENETRATION FITTINGS PEN.R.01 FITTINGS <br /> IPC W/E%PLOSION PROOF 1"C W/EXPLOSION PROOF IPC W/EXPLOSION PROOF <br /> 30 1"CONDUIT FOR 30 1"CONDUIT FOR 30 1"CONDUT FOR <br /> SEAL-OFF(SEE NOTE#5) }0 TURBINE POWER SEAL-OFF(SEE NOTE#5) - I }O TURBINE POWER S__OFF(SEE NOTE#5) 30 TURBINE POWER <br /> CONTRACTOR SUPPLIED UNI RUT& 30 1"RIGID CONOUT CONTRACTOR SUPPUED UNISTRUr& 30 1"RIGID CONDUIT CONTRACTOR SUPPLIED UNISTBUT& 30 1"RIGID SUNDER <br /> CLAMPS FOR CONOUIT SUPPORT.u (SEE NOTE#5J CLAMPS FOR CONS SUPPORT.;o (SEE NOTE#5) CLAMPS FOR CONDUIT SUPPORT..o (SEE NOTE#5) LE <br /> ATTACH TO RISER WRIT U-BOLT I ATTACH TO RISER WITH U-BOLT I ATTACH TO RISER WI1H U-BOLT <br /> CLAMP,(M.®ALL CONDUITS) I CLA-(ttP.®ALL CONDUITS) I CLAMP.(ttP,®ALL CONDUITS) <br /> SUMP FUME ARRESTOR 63 i EXISTING 22"WNWAY PATE SUMP FUME ARRESTOR 6} i EXISTING 22'MANWAY PLATE SUMP FUME ARRESTOR 63 i DWNG 22"MANWAY PLATE <br /> 40"DW V0-SIDED FIBERGLASS 4 3 DOUBLE WALL TANK COLLAR 40'DW VB-SIDED FIBERGLASS 4 3 DOUBLE WALL TANK COLLAR 48°DW VB-SIDED FIBERGLASS 4 3 DOUBLE WALL TANK COLLAR <br /> CONTAINMENT SUMP I CONTAINMENT SUMP I CONTAINMENT SUMP <br /> EXISIING TAN(TOP I EXISTING TANK TOP I EXISTING TAN(TOP <br /> 2"EZ-FT 90 DEGREE ELBOW(TYP.)201 200 2"EZ-FT LAMP W/VISION SEAL(TYP) 2"EZ-FIT 90 DEGREE OLD DW(ttP.)201 200 2'EZ-FIT LAMP W/MYON SEAL(TYP) 2"¢-FIT 90 DEGREE ELBOW(TTP.)201 200 2 EZ-FT LAMP W/VIiON SEAL(TYP) <br /> P SENSOR IN HOLDERIP SENSOR IN HOLDER P SENSOR IN HOLDER <br /> 2"Q-FIT X EZ-FT ADAPTER(TYP)206 31 (SEE NOTE#}) 2'EZ-FIT X EZ-FIT ADAPTER(—)206 31(SEE NOTE#3) 2"EZ-FIT X Q-FT ADAPTER(TIP.)206 31 (SEE NOTE#3) <br /> TURBINE EXTENDS TO WITHIN 6" TURBINE EXTENDS TO WITHIN 6" TURBINE EXTENDS TO WITHIN 6" <br /> 2"EX-FIT THE(IVP.)202 OF BOTTOM OF TANK 2-EZ-Fli TEE(1YP.J 202 OF BOTTOM OF TANK 2"Q-FIT TEE(TYP.)202 OF BOTTOM OF TANK �pTEs5lgy <br /> 2"x10'FLEXIBLE CONNECTOR Al EZ-FIT 1/4'DRAIN/TEST BUSHING,FACTORY INSTALLED 2'x10"FLEXIBLE CONNECTOR W/EZ-FR 1/4"DRAIN/TEST BUSHING.FACTORY INSTALLED 2"x10'FIE%IBLE CONNECTOR Al EZ-FIT 1/4'DRAIN/TEST BUSHING FACTORY INSTALLED <br /> MALE X E%TINGE(SEE NOTE#2)(ttP.) 43 TO TEST FOR CONTINUItt, MALE X IX FLANGE(SEE NOTE#2)(ttP) 43 i0 TEST FOR CONTINUTIY. MALE X E%FLANGE(SEE NOTE#2)(ttP) 43 TO TEST FOR CONTINUITY. ty c <br /> Sump Section View a 20K Regular Unleaded Tank#1 Sump Section View a 20K Regular Unleaded Tank#2 Sump Section View a 20K Regular Unleaded Tank#3s <br /> T4- SCALE:r=r-D' T4- srnLE:r=r-o" T4- - <br /> wJ"'<or 1AH., <br /> BRINE SUMP RESERVOIR& rMURGINE 2 HP VNiWBLE SPEED TURBINE W/ Sheet Notes <br /> THICKENED SLAB HYDROSTATIC SENSOR 2fi ACCESS 38 2 NPH PULPRRE(SEE NOTE#]) <br /> MANHOLE 40 2 HP VARIABLE SPEED TURBINE <br /> 1"FRP BONDED TURBINE POWER CONDUT SEE NOTE#4 18"ttP. 41 <br /> NOTE: W/(NON-VENTED CHECK VALVE ON <br /> PENETRATION <br /> PER <br /> HYP.OF 2) Z1 2"CROWN MIN. SIAVE PUMP)(SEE NOTE#]) 1.- PIPE&CONDUT PENETRATIONS: # <br /> THE TURBINE PUMP HEADS SHOULD BE SEE NOTE#4 ALL PENETRATIONS OF THE TPNK SUMPS SHALL BE SEALED WITH ERP BONGED DOUBLE BULKHEAD FITTINGS TO ENSURE THE <br /> ROTATED SUCH THAT THEY PLLOW THE PROPER INSTALLATION OF ALL BULKHEAD FITTINGS AND RESULTANT WATER TIGHTNESS.ALL PIPING,CONDUIT AND GROUNDS-1 <br /> FlBER GLASS SYSTEMS REMOVAL OF THE PROBE > . • e•• . PRODUCT UNE �I xI gl p( y <br /> 110 110 V J; MX ' " • e 1RACER TAPE PENE1RAlE THE SUMP SIDE WALLS MUST BE SEALED IN SUMPS,SUMPS SHALL BE HYOROSTATICALLT IEGTEO WITH STANDING WATER <br /> 3"OVER 2"FRP PIPING O,. (6"MIN.12'MA%) FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. _ <br /> VACUUM GROSS OVER(ttPJ T4- • 2.- NOT USED <br /> }"FRP BONDED FITTING(TYP.)]3 201 2'EZ-FIT 90 DEGREE 3"MIN.CLEARANCE(TTP.) d <br /> ELBOW(ttP.) MANOMETER&HOPE TUBING TO 20}2'EZ-FIT X MALE HE%ADAPTER(TRP) 3.- SUMP SENSORS: <br /> TEST PORT FOR CONTINUITY TESTING SENSOR TO BE MOUNTED AT S1DE OF LANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW LOWEST PENETRATION <br /> EXPLOSION PROOF JUNCTION GO I O6 2 EZ-FIT X¢-FIT TANK LEVEL GAUGE FACE SEAL ADAPTER(TYP.) FITTING WITHIN SUMP AREA.MOUNT SENSOR FLUSH TO LOWEST POINT IN SUMP BOTTOM.ALL TANK SUMP SENSORS SHALL BE f <br /> FOR STANDARD MONITORING DEVICES 30 ADAPTER(T"P.) PROBE LOCATION 51 40 47 62 PALL VALVE-FULL PORT(TYP) NON-DISCRIMINATING,PORTION SENSITIVE. 4 <br /> ONLY(SEE NOTE#5) 202 2"EZ-FIT TEE(MJ EXPLOSION PROOF JUNCTION 30 4.- MNIHDIE CROWNS&TANK SLAB DEPTH AT SUMP: <br /> BOX(SEE NOTE#5) 25 VACUUM SENSOR ASSEMBLY a <br /> 2 HE VARIABLE SPEED TURBINE W/ 38 54"OW 8-SIDED FIBERGLASS &MOUNTING BRACKET KIT ALL MANHOLE OPENINGS ON THE TANK STAB SHALL BE INSTALLED WITH A 2'X 18°RUN CROWN OF CONCRETE TO PREVENT <br /> 40 4 CONTAINMENT SUMP TWISTED CABLES ROUTED TO <br /> (NON-VENTED CHECK VALVE ON Ti VAC&FLOAT SENSORS(D TO J1 1'FRP BONDED CONDUIT WATER INTRUSION INTO THE MANHOLE. TANK SLAB SHALL BE THICKENED AT TANK SUMP U BE JUST BELOW TOP OF TANK SUMP <br /> SUVE PUMP)(SEE NOTE#]) 31 SUMP SENSOR IN HOLDER, PENETRATION FRIINGS SECONDARY CONTAINMENT TERMINATION. <br /> O' (SEE NOTE#3) 1"C W/EX'FUSION PROOF 30 30 1"CONDUIT FOR 5,- U.G.CONDUIT: <br /> INK LEVEL GAUGE PROBE _ 3"OVER 2°FRP SEAL-OFF(SEE NOTE#5) TURBINE POWER ALL U.G.CONOUT TO TANK SUMPS SHALL BE ROBROY RIGID STEEL PVC COATED SCHEDULE 40(NO SUBSTITUTIONS),CONDUIT <br /> 4] 48 51 116 110 <br /> LOCATION PIPING(ttP.) CONTRACTOR SUPPLIED UNISTRUT& 30 1"RIGID CONDUIT MINIMUM BURY DEPTH IS 24'PER CODE.ALL JUNCTION BOXES SHALL BE CLASS 1 DIV 2 RATED.ALL ELECTRICAL CONDUIT IN p <br /> 2 HE VARIABLE SPEED TURBINE ]3 3'FRP BONDED FITTING TYP) CLAMPS FOR CONDUIT SUPPORT. - (SEE NOTE#5) SUMPS SHALL INCWOE A SEAL-OFF ENTERING AND LUNNG. SEAL-OFFS SHALL BE INSTALLED fi' MIN.ABOVE HIGHEST C Q <br /> 38 ( ATTACH TO RISER WITH U-BOLT I FIBER GLASS SYSTEMS 3" PENETRATION IN SUMP. <br /> PUMP W/.1 GET <br /> PLLO 4d y 110 ■ Q <br /> 2°EZ-FIT X FEMPIE GLUE PIPE CLAMP.(ttP.®ALL CONDUITS) I OVER 2'FRP PIPING L 3 £ <br /> (SECOND VACUUM SOURCE 41 O4 6.- STAINLESS STEEL FITTINGS: <br /> FOR FIBERGLASS PIPING(ttP.) I 110 VACUUM CROSS-OVER CONTRACTOR TO PROVIDE ALL MISCELLANEOUS NET FITTINGS AND NIPPLES FOR CONNECTIONS TO TURBINES.SIPHON SYSTEM 1 <br /> REO'0)(SEE NOTE#]J SUMP FLAME ARRESTOR 63 SHOWN THIS VIEW FOR L FQFQFQ <br /> 200 2"EZ-FIT CLAMP W/ I m,P) AND VAPOR RECOVERY SYSTEM.ALL STAINLESS STEEL FITTINGS SHALL BE MANUFACTURED BY'STANDARD PIPE PRODUCTS' g <br /> 1"FRP BONDED CONDUIT CIARIn OR EQUAL SPECIFICATIONS AS FOLLOWS: g <br /> PENETRATION FITTINGS Z1 VITON SEAL(TYP.) 54"OW 8-SIDED FIBERGLASS 4 3 DOUBLE WALL TANK COLLAR <br /> 2°x18"FLIXIBLE CONNECTOR CONTAINMENT SUMP I pIMEN510N5 MATERIAL THREAD PRESSURE RATING 5 <br /> 43 S.S.FITTINGS 2 <br /> VACUUM TUBING TO W/EZ-FT MALE X E%FLANGE I 1 TANK TOP (TEES,ELBOWS) <br /> DEVICES MONITORED (SEE NOTE#2)(ttPIN CUSS 150 PN 20 MME B16.3 ASTM A-182 MME B.1 20T ASME PIGS <br /> IN FILL SUMP BRINE SUMP RESERVOIR& 2"EZ-FIT 90 DEGREE ELBOW P. 201 pp 2"EZ-FIT LAMP W/VITON SEAL(MJ / <br /> F z6 (n) ss.uw5O/ <br /> HYDROSTATIC SENSOR IP SENSOR IN BOWER <br /> VACUUM SENSOR ASSEMBLY& SO. ONS <br /> P 150/PN 20 ASME B16.39 ASTM A-182 PSME B.1 20,1 ASME B163 <br /> MOUNTING BRACKET KT 25 T4�� 2°EI-FT%EZ-FIT ADAPTER(ttP)206 }1(SEE NOTE#3) <br /> TURBINE EXTENDS TO WITHIN 6" CLASS <br /> PIPE <br /> 2'EZ-Fli TEE IRS.)202 OF BOTTOM OF TANK CUSS 150/PN 20 ASTM A]33 ASTM A-312 ABME B.1 20.1 ASME UPI <br /> 2'x18'FLEXIBLE CONNECTOR W/Q-FR 1/4'GRAN/TEST BUSHING.FACTORY INSTALLED Z.- CORROSION PROOF: <br /> MALE X EX FLANGE(SEE NOTE#2)(TYP.)4} i0 TEST FOR CONTINUITY, ALL TURBINE PUMP HEADS TO HAVE ADVANCED CORROSION PROOF PROTECTION WITH E-GRATED FINISH. <br /> c Sump View a 40K Premium Unleaded Tank#5_ Vi <br /> Sump Section View a 40K Premium Unleaded Tank#5 8.- TURBINE TFAD POSITIONING 8 F <br /> T4-1 SLAT_: ..Plan CONTRACTOR TO INSTALL DUAL TURBINE SUMP HEADS SO THAT THEY ARE ORIENTED TO ALLOW CLEAR ACCESS FOR AUTOMATIC t <br /> T4- SCALE:I-I TANK CAUSE(ATG)REMOVAL. <br />
The URL can be used to link to this page
Your browser does not support the video tag.