Laserfiche WebLink
THICKENED STAR }) TURBINE ACCESS 16^ryp THICKENED SIAD }Z TURBINE ACCESS 18"ttP <br /> SEE NOTE#4 MANHOLE MIN. 2'CROWN SEE NOTE{)4 MANHOLE MIN. 2'CROWN MINI HYDROSTATIC 26 34'Lid 0.0. f!1 <br /> SEE NOTE#4 SEE NOTE d4SENSOR 32-3/4"Neck O.D. Q N <br /> • • • • 0 . • FACTORY SUPPLIED J <br /> n • • • , • • ^ SUMP RESERVOIR Q W Q <br /> 47 46 51 4] 49 51 <br /> • , • TANK LEVEL MONITOR •, , • a TANK LEVEL MONITOR <br /> HOPE MANOMETER <br /> i0 Z <br /> J <br /> WAD MONITORING CAP AD MONITORING CPP TEST PORT Fore <br /> 2'0-30HG 30"I.D. V <br /> LIOUID-FILLED GAUGE 0 ADAPTER 0 ADAPTER CONIINUIIV TESTING 0_ W <br /> FACE SEAL aoAPTER(nP.) FACE SEAL ADAPTER(nP.) m F Z L�i <br /> 1/2"' ELBOW TUBING <br /> B.S. LL <br /> 63 SUMP FLAME ARRESTOR 3"EZ-FIT 90 63 SUMP FLAME ARRESTOR SLIP ON RISER ROUND BODY E%TENSIO <br /> 3/B"COPPER TUBING i0 DEGREE ELBOW(nP.J 201 FIELD SEALED JOIM. O 48"I.D. U Z <br /> SIPHON CHECK VALVE 44 3"x18'FLE%IBLE CONNECTOR W/ qq 3"x18"FLE%IBLE CONNECTOR W/ (ADHESIVE SUPPLIED Q - <br /> _ EZ-FIT MALE%EX FWJGE FIBER GLASS EZ-FIT MALE%E%FLANGE in r <br /> 3"-FT 90 FIBER GLASS SYSTEMS 4'OVER 3'116 125 ———— — — W/KIT) o w �g(F <br /> 201 116 125 FRP SIPHON PIPING 116 125 FIBER GLASS a N Z <br /> DEGREE ELBOW(1YPJ SYSTEMS IP OVER SYSTEMS 4"OVER 3 <br /> 3'FRP SIPHON TO TANK#1 0 -- FRP SIPHON PIPING 1 2 Z p3' <br /> 3'EZ-FIT%MALE -- PIPING TO TANK$2 3°EZ-AT%MALE TO TANK g3 FACTORY a 8 8 <br /> HEX ADAPTER(TYP.)203 J5 4"FRP BONDED HEX ADAPTER(TYR)203 Z5 4"FRP 80N0E0 LAY-UP � �� 29:N <br /> FIRING(RP.) FIRING(IYPI 0 <br /> 1 <br /> SUMP SENSOR IN HOLDER 3"FRP"PRIMARY" SUMP SENSOR IN HOLDER 3"FRP"PRIMARY" COLLAR BONDED & 0 <br /> (SEE NOTE IDU 31 —— — 110 ELBOW FYP) (SEE NOTE�3)31 — 110 ELBOW(IYP.) TO TANK o Z V <br /> 48"OW VB-SIDED FIBERGLASS 48 DW V8-SLUED FIBERGLASS <br /> q }"Q-FR CLAMP W/ q 3"Q-FR CLAMP W/ 48'SIA.POLYGON SUMP BODY F <br /> CONTAINMENT SUMP 200 CONTAINMENT SUMP 200 <br /> vnoN sFA1(ttP.) vnoN sFA1(ttPJ (a-za'x 19'FLIT PANELS) <br /> EXISDNC TANK 4'RISER SOU 40 STAINLESS EXISTING TANK 4'RISER SOU 40 STAINLESS <br /> TOP TO RFMMN STEEL,(WRAPPED) TOP TO REMAIN STEEL,(WRAPPED) JOINT DETAILS FACTORY INSTALLED USHING. a 4 F <br /> 4N3"DOUBLE TAPPED BUSHING 52 62 3'BALL VALVE 4N3"DOUBLE TAPPED BUSHING 52 62 3'BALL VALVE CONTRACTOR TO ADDITIONALLY GLASS WRAP& LAMINATE AT -NOTE: <br /> CONREST A FOLLOWING CURING OF ADHESIVE SPECIFIC ATTENTION CONTRACTOR SHALL BE HELD RESPONSIBLE FOR PROPER <br /> _T� <br /> 3'STAINLESS STEEL SIPHON SRNGER, 3'STAINLESS STEEL SIPHON SR NG ER. MUST BE GIVEN TO SURFACE PREP AS TSANG REQUIREMENTS WILL INSTALLATION&PREPARATION PER MANUFACTURERS <br /> TERMINATE 6'FROM BOTTOM OF TANK TERMINATE 6'FROM BOTTOM OF TANK DETECT HE SMALLEST OF FLAWS,ALL MATERIALS MUST BE INSTRUCTIONS AND SRALL REINSTALL SUMPS IF <br /> NOTE:TOP OF SIPHON PIPING SHALL BE 24'X1/4'THICK STRIKER PLATE NOTE:TOP OF SIPHON PIPING SHALL BE 24"1/4'THICK STRIKER PLATE COMPATIBLE WITH GASOLINE,GASOLINE WITH 15%METHANOL AND 102 HYDROSTATIC TESTING SHOWS LEAKING IN HIS AREA OF <br /> UNDER ALL OPENINGS BY TANK ETHANOL.FIBERGLASS AND RESIN MUST EDRUG 1/2'BEYOND THE SUMP.TESTING OF SUMP SHALL BE PERFORMED <br /> INSTALLED LEVEL AND NO HIGHER THAN 145' UNDER ALL OPENINGS BY TANK INSTALLED LEVEL AND NO HIGHER THAN 145' COVERAGE OF ADHEGIVE. AMER REDUCER IS INSTALLED. <br /> FROM BOTTOM OF TANK ON BOTH TANKS. MANUFACTURER(TYA) FROM BOTTOM OF TANK ON BOTH TANKS. MANUFACTURER LF,) <br /> (-,I Siphon Piping at Tank#1 a Siphon Piping at Tank#2 �C-Double Wall Turbine Sump Installation Detail at Tanks#1-3 <br /> T4-2 SCALE:1"=T-D" T4-2 scALe r=r-0• — �4-2 <br /> MINI HYDROSTATIC 26 34'Lid <br /> SENSOR 32-3/4"Neck O.D. QN9 NO <br /> X590 <br /> FACTORY SUPPLIED 2 WIRE SHIELDED CABLE W a m <br /> SUMP RESERVOIR MANOMETER& Q U,Q <br /> SUMP 30"I.D. HDPE TUBING TO W 3 <br /> = <br /> TEST PORT FOR <br /> CONTINUItt TESTING SUMP O Q Q <br /> ROUND BODY VF J p <br /> SUP ON RISER O EXTENSION N N <br /> FIELD SEALED JOINT. 54"I.O. 3"0 x 12'LONG FIBERGLASS PIPE BONDED I V fa <br /> RALL VALVE W/RARE FITTING AT (ADHESIVE SUPPLIED _ TO SUMP INNER WALL USING GASOLENE <br /> FACTORY INSTALLED BUSHING W/RIP) a COMPATIBLE EPDXY RESIN. O SUMP SENSOR IN HOLDER <br /> 31 (SEE NOTE{)3) <br /> 1 CONTRACTOR TO INSTALL GALVANIZED METAL_ <br /> FACTORY OR FIBERGLASS SPACER TO ALLOW FIBERGLASS I Oo <br /> 3/8 X 1/4 SS BUSHING UY-UP PIPE TO CLEAR SUMP COLLAR"LIP'. O LL <br /> INSTALLED AT FACTORY APEX OF FIBERGLASS CONTRACTOR TO USE WOLINE-COMPATIBLE <br /> TANK EPDXY TO RONO SPACER TO SUMP. APEX OF FIBERGLASS <br /> COLLAR To N°KK CONTRACTOR MAY USE UNISTRUT,FIBERGLASS 0 TANK <br /> a PIPE,OR ANY OTHER EQUIVALENT MATERIAL <br /> 40'DIA.POLYGON SUMP RODY THAT CAN WITHSTAND ENNRONMENT OF SUMP <br /> (8-2DX 19"FLAT PANELS) TO SECURE THE SUMP SENSOR 50 THAT IT <br /> CAN BE REMOVED FOR INSPECTION AND <br /> RESECURED WITHIN THE SUMP <br /> JOINT DETAILS 1/4'DRAIN/TEST BUSHING. <br /> FACTORY INSTALLED <br /> ()CONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT 'NOTE: <br /> ,ON NFL ON FOLLOWING CURING OF ADHESIVE.SPECIFIC ATTENTION CONTRACTOR SHALL BE HELD RESPONSIBLE FOR PROPER <br /> MUST BE GIVEN TO SURFALE PREP AS TESTING REQUIREMENTS WILL INSTALLATION & PREPARATION PER MANUFACTURERS <br /> DETECT THE SMALLEST OF FLAWS. ALL MATERIALS MUST BE INSTRUCTIONS AND SHALL REINSTALL SUMPS IF <br /> COMPATIBLE WITH GASOLINE,CASOUNE WITH 152 METHANOL AND HYDROSTATIC TESTING SHOWS LEAKING IN THIS AREA OF <br /> 1 102 ETHANOL FIBERGLASS AND RESIN MUST EXTEND 1/2"BEYOND HE SUMP.TESTING OF SUMP SHALL BE PERFORMED <br /> T <br /> jpj Tank Sump Drain Port Detail(Typ.Fill Turbine Sumps) COVERAGE OF ADHESIVE. AFTER REDUCER IS INSTALLED, oxu p.[xuee f== <br /> T4-2 - 1 1 nDouble Wall Sump Installation Detail at Tank#5 Sensor Holder Detail <br /> `TT4- SCALE:2"=1C' <br /> 18iYPTURTHICKENED SLAB <br /> " _ BINE ACCESS 3J NJ=� cAU14Ws <br /> MANHOLE <br /> 2"GROWN NOTE#4 MIN. SEE NOTE <br /> SEE )(4 Sheet Notes <br /> • % PIPE&corvoulr PENETRATIONS: <br /> • ALL PENETRATIONS OF THE TANK SUMPS SHALL BE SEALED WITH DOUBLE BULKHEAD FITTINGS SHALL BE INSTALLED PERPENDICULARWA F TO <br /> CONOUITSUMP AND GROUNDS ENSURE HAT PE EETRATE HE SUMP SIDE ALL WALLS MUSTLABE SEALED IN ANDRESULTANT <br /> SUMPSTER EHALLIGBENEEK HYDROSTATICALLY <br /> iWNK LEVEL MONITOR 51 BE 4Z• TESTED WITH 5GROOMG WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERRGHi. yy AA <br /> /MONRORING CAP 2°0-30HC 4 6 y ) 8 <br /> ANO ADAPTER 2.- PIPING TESTING: d 6 <br /> FACE SEAL ADAPTER(IYP.J LIQUID-FILLED GAUGE TERING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED.THE CONTAINMENT TERMINATION FRING IN THE SUMP IS TO BE <br /> 1/2"90 ELBOW 150#S.S. INSTALLED WITH THE VALVE TURNED DOWN. THE PIPING 15 TO BE CONTINUOUSLY MONITORED BY VACUUM, PRESSURE OR <br /> SUMP FLAME ARRESTOR(B} HYDROSTATIC.THEREFORE THE VALVE UNLESS BEING TESTED SHOULD REMAIN CLOSED. <br /> 3/8'COPPER TUBING TO 3.- SUMP SENSORS: <br /> 3".1R FLEXIBLE CONNECTOR Al qq SIPHON CHECK VALVE SENSOR TO BE MOUNTED AT 5IDE OF TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW LOWEST PENETRATION 3 <br /> EZ-FIT MALE%E%FLANGE FITTING WITHIN SUMP AREA.MOUNT SENSOR FLUSH TO LOWEST POINT IN SUMP BOTTOM.ALL TANK SUMP SENSORS SHALL BE N <br /> FIBER GLASS _ _ _ 3"EZ-FIT 90 NON-DISCRIMINATING AND POSITION SENSITIVE. <br /> SYSTEMS P. <br /> WED 125 11D 201 UEGREE ELBOW(IYR) <br /> 3"FRP SIPHON 4.- MANHOLE CROWNS: g <br /> ALL MANHOLE OPENINGS ON ME TANK SLAB SHALL BE INSTALLED WITH A 2"%18'RUN CROWN OF CONCRETE TO PREVENT WATER C <br /> PIPING TO TANK#2 3'EZ-FlT%MALE INTRUSION INTO THE MANHOLE. O <br /> 4'FRP BONDED ZS 203 HEX ADAPTER(nP.) 5.- U.G.CONDUIT: W <br /> FlT TI NG(IYP.) ALL U.G.CONDUIT TO TANK SUMPS SHALL BE ROBROY RIGID STEEL PVC COATED SCHEDULE 40(NO SUBSTITUTION s).CONDUIT p FF <br /> 3"FRP"PRIMARY" 31 SUMP SENSOR IN HOLDER MINIMUM BURY DEPTH IS 24"PER CODE.ALL JUNCTION BOXES SHALL BE CUSS 1 DIV.2 RATED.ALL ELECTRICAL CONDUIT IN C Q x <br /> ELBOW(NP.)118 (SEE NOTE g3) SUMPS 5HP11 INCLUDE A SEAL-OFF ENTERING ANO LEAVING. SEAL-OFFS SHALL BE INSTALLED fi'MIN.ABOVE HIGHEST w <br /> 3'EZ-FIT CLAMP W/ 4 48 DW V8-SIOEO FIBERGLASS PENETRATION IN SUMP. L 3 g <br /> 200 CONTAINMENT SUMP <br /> VITON SEAL(ttP.) 6.- STAINLESS STEEL FITTINGS: 1 <br /> CONTRACTOR i0 PROVIDE ALL MISCELLANEOUS NET FITTINGS AND NIPPLES FOR CONNECTIONS TO TURBINES,SIPHON SYSTEM ■ <br /> 4"RISER SCH.40 STAINLESS E19STNG TPN( AND VAPOR RECOVERY SYSTEM.ALL STAINLESS STEEL FITTINGS SHALL BE MANUFACTURED BY"STANDARD PIPE PRODUCTS" m g <br /> STEEL,(WFAPPED TOP TO RQ N <br /> OR EQUAL SPECIFICATIONS PS FOLLOWS: <br /> 3"BALL VALVE 62 52 4'13'DOUBLE TAPPED BUSHING 5.5.FITTINGS DIMENSIONS MATERIAL THREAD PRESSURE RATING <br /> (TEES,ELBOWS) <br /> 3'STAINLESS STEEL SIPHON STINGER. CUSS 150/PN 20 ASME 816.3 ASTM A-1B2 ASME B.1 20.1 ASME BIBB S <br /> TERMINATE 6'FROM BOTTOM OF TANK S.S.UNIONS <br /> 24'X1/4"HICK STRIKER PLATE NOTE:TOP OF SIPHON PIPING SHALL BE CUSS 150/PN 20 ASME B16.39 ASTM A-182 ASME 3.1 20.1 ASME 816.3 <br /> UNDER ALL OPENINGS BY TANK INSTALLED LEVEL AND NO HIGHER THAN 145' S.S.PIPE 19 18 <br /> MANUFACTURER(RR)� M BOTTOM OF TANK ON BOTH TANKS, CVIS 150/PN 2C ASTM IND ASTM A-312 ASME B.1 20.1 ASME 816.3 <br /> ].- CORROSION PROOF: p N <br /> j�Siphon Piping at Tank#3 Not Used ALL TURBINE PUMP HEADS TO HAVE ADVANCED CORROSION PROOF PROTECTION WITH E-GRATED FINISH. Ln <br /> T4- SCAT F - T4-2 SCALE: �+ ~ <br />