My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 9:33:30 AM
Creation date
5/31/2022 1:10:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0518288
PE
2351
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 76 4" BONDED FITTING <br /> 9 4" COAXIAL "UPP" REMOTE FILL VAPOR PIPING (TYP.) 139 _\ <br /> 31 SUMP SENSOR (SEE NOTE #3) <br /> 5x4 TEST REDUCER FITTING 136 204 3" EZ-F X FEMALE GLUE PIPE FOR FIBERGLASS PIPING <br /> 00 <br /> (TYP.) �' 125 1 16 4" OVER 3" FRP VAPOR 141J <br /> RECOVERY PIPING (TYP.) Q Q 41-- <br /> PRIMARY COUPLING (TYP.) 141 �i 75 4" BONDED FITTING (TYP.) Q <br /> 4 MALE TERMINATION 138 <br /> FITTING (TYP.) Z W j (, <br /> 3"x18" FLEXIBLE CONNECTOR W/ EZ-FIT i� \� 27 4"x4"x3" EXTRACTOR Q <br /> 44 O Z 0) LL <br /> MALE X EZ-FIT FLANGE (SEE NOTE #10) o /_ \ TEE FITTING J J W <br /> \ J Z U <br /> 2" EZ-FIT X MALE HEX ADAPTER (TYP.) 203 0� o <br /> o o 97 SUMP FLAME ARRESTOR o W J Z <br /> J Q J <br /> z <br /> 3" EZ-FIT CLAMP W/ 200w \ <br /> VITON SEAL (TYP.) j of 4 54" DOUBLE WALL <br /> 12 O \ o POLYSIDED FIBERGLASS o 0 0 U) Q Q <br /> ® o CONTAINMENT SUMP <br /> 3" EZ-FIT 90 DEGREE 201 a O ~ O <br /> ELBOW (TYP.) B ° ° B CD CD U <br /> 0 0 V) cn c W <br /> Z � <br /> T5-1 o T5-1 � � � Q z � � � <br /> U <br /> AT 87 OCTANE TANK #2 ONLY �� o 0 o Y Q O <br /> U <br /> 3" BONDED FITTING (TYP.) 73 ,j/ m m m m Z <br /> N N Q <br /> N N N <br /> 3" OVER 2" SUMP CROSSOVER FRP 110 72 3" BONDED FITTING TYP. N o N o <br /> PIPING W/ GROMMETED END CAP TO J��\ (TYP.) <br /> o o <br /> CONTAIN VACUUM TUBING ONLY (TYP.) 116 <br /> lo (* G� < <br /> 1 " FRP CONNECTION <br /> BONDED CONDUIT 71 I ADDITIVE PIPE <br /> PENETRATION FITTING (TYP.) <br /> T5-1 <br /> 3/4" X 15" FLEXIBLE CONNECTOR 45 4" COAXIAL "UPP" REMOTE FILL <br /> 139 PRODUCT PIPING (TYP.) <br /> A Fill Sump and Hydrostatic Reservoir Plan View (Gasoline Tanks)- C NOT USED E NOT USED <br /> T5-1 SCALE: 1 "=l '-O" <br /> T5-2 SCALE: NONET5-2 SCALE: NONE <br /> MAINTAIN 5" MIN. 6" MAX. CLEARANCE <br /> BETWEEN TOP OF CAP AND4#4� <br /> 37 ACCESS MANHOLE <br /> (SEE N 18„ 10" ABSOLUTE MIN. <br /> 4" PRODUCT I.D. TAG. DISTANCE TO TOP EDGE OWN w <br /> RECESSED FLUSH W/ CONC. 12 MIN. TYP.2 OF SUMP NECK J N <br /> (TYP.) 2" CROWN SEE Q W O <br /> NOTEf6 11 — CA ] 00 <br /> W 0) <br /> a a O <br /> a <br /> a ° °. a <br /> 2 W <br /> a MANOMETER & HDPE TUBING N Q I <br /> BRINE SUMP RESERVOIR TO TEST PORT FOR CONTINUITY O J <br /> TESTING <br /> X 8c HYDROSTATIC SENSOR 26 FIELD-CUT (LENGTH AS NEEDED) 0 <br /> 0 MONITOR CAP & TRAP 80 NIPPLE (BY G.C.) O Q <br /> DOOR PER CARB VR-102 co <br /> n COUPLER (BY G.C.) <br /> U <br /> Q 4" FACE SEAL ADAPTER 80 <br /> (2) 1 " & (2) 4" GND CLAMPS 63 SUMP FLAME ARRESTOR (TYP.) <br /> W/ #6 BARE SOLID <br /> 54" DW DIA. SUMP(�� MOUNT FOOT-STEP TO RISER <br /> EXPLOSION PROOF ELECTRICAL54" DW DIA. SUMP 4 <br /> L <br /> ®®®®®®®®°®®°®®®® ®®® 4" S.S. IRON RISERS (SEE NOTE #9) O <br /> SEAL-OFF, 6" ABOVE HIGHESTOO ®® ®®®®® CONTRACTOR SUPPLIED UNISTRUT & <br /> LL <br /> PENETRATION (TYP. SEE NOTE #7) CLAMPS FOR CONDUIT SUPPORT. <br /> MOUNT FOOT-STEPTO 64 ATTACH TO RISER WITH U-BOLT <br /> RISER (TYP. 2) _ CLAMP. (TYP. @ ALL CONDUITS) <br /> VACUUM TUBING ROUTED <br /> TO DEVICES MONITORED 1 " 71 7 \\ 0 134 4" COAXIAL "UPP" REMOTE FILL <br /> IN FILL SUMP (TYP.) ®®ma®®a 0 VAPOR RETURN PIPING (TYP.) <br /> 0 4" COAXIAL "UPP" REMOTE <br /> CAD WELD TO MAIN 0 134 <br /> GROUNDING WIRE. ROUTE FILL PRODUCT PIPING (TYP.) <br /> 1 " 30 0 <br /> TO GROUND ROD 1 TANK TOP (TYP.) <br /> JACK SCREW 80 0 As-Bunt <br /> A__N CD 09/01/2022 <br /> OJol [OVE7 GROUP,Imc 7:36:00 AM <br /> DROP TUBE W/ OVERFILL PREVENTION15 QRpFESS/pyq� <br /> VALVE SET @ 95% CAPACITY. TERMINATE 31 SUMP 22 4"x4"x2"X3" EXTRACTOR �``� 61 <br /> DROP TUBE MIN. 4", MAX. 6" ABOVE SENSOR FITTING (TYP.) �= HAL P. GRUBB <br /> STRIKER PLATE (TYP. SEE NOTE #5) r J s7s14rn <br /> NOTE: THE EQUIPMENT DEPICTED AND LISTED ABOVE IS <br /> 70 <br /> 1 /4" DRAIN/TEST BUSHING. IN ACCORDANCE WITH CARB EXECUTIVE ORDER VR-102 11 <br /> FACTORY INSTALLED FOR STAGE I ENHANCED VAPOR RECOVERY (EVR) %p �P <br /> rB_ Fill Sump Installation Detail ('D_ <br /> NOT USED F NOT USED 9TF OFF" CAL�F��� <br /> T5-1 SCALE: 1 "=1 '-0" T5-2 SCALE: NONE T5-2 SCALE: NONE 05/27/22 <br /> 0 <br /> heet Notes ° Q U Q <br /> N <br /> Z Z <br /> S `n o i <br /> 1 . - PIPE & CONDUIT PENETRATIONS: <br /> ALL PENETRATIONS OF THE TANK SUMPS SHALL BE SEALED WITH DOUBLE BULKHEAD FITTINGS SHALL BE INSTALLED PERPENDICULAR TO SUMP WALL TO ENSURE THE PROPER INSTALLATION OF ALL BULKHEAD FITTINGS AND RESULTANT WATER TIGHTNESS. ALL PIPING, 0 0 0 N o <br /> CONDUIT AND GROUNDS THAT PENETRATE THE SUMP SIDE WALLS MUST BE SEALED IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. 00 m <br /> 2• - PIPING TESTING: <br /> Y > <br /> TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED. THE CONTAINMENT TERMINATION FITTING IN THE SUMP IS TO BE INSTALLED WITH THE VALVE TURNED DOWN. THE PIPING IS TO BE CONTINUOUSLY MONITORED BY VACUUM, PRESSURE OR <br /> o <br /> 0 0 a o co <br /> HYDROSTATIC. THEREFORE THE VALVE UNLESS BEING TESTED SHOULD REMAIN CLOSED. co co <br /> 00 <br /> 3. - SUMP SENSORS: <br /> SENSOR TO BE MOUNTED AT SIDE OF TANK WHERE VENT/VAPOR PIPING PENETRATES INTO THE SUMP IS MADE AND BELOW LOWEST PENETRATION FITTING WITHIN SUMP AREA. MOUNT SENSOR FLUSH <br /> TO LOWEST POINT IN SUMP BOTTOM. ALL TANK SUMP SENSORS SHALL BE NON-DISCRIMINATING AND POSITION SENSITIVE. p <br /> 4. - FILL AND VAPOR CAP HEIGHT TO GRADE: 115 2" BELL X MALE ADAPTER (TYP.) 0- <br /> THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. CONTRACTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. Vf <br /> 72 3" BONDED FITTING (TYP.) � N <br /> 5. - DROP TUBE CRITICAL DIMENSION: O _r 3 <br /> THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. CONTRACTOR WILL BE REQUIRED TO REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. 3/4" 3-WAY BALL VALVE 60 � _ <br /> 10 1 16 3" OVER 2" FRP CDcl <br /> 6. - MANHOLE CROWNS: O I <br /> ADDITIVE PIPING (TYP.) i <br /> ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH A 2" X 18" RUN CROWN OF CONCRETE TO PREVENT WATER INTRUSION INTO THE MANHOLE. _ _ <br /> 7. - U.G. CONDUIT: 3/4" S.S. PIPING AND — — LJ.I C r4 E <br /> ALL U.G. CONDUIT TO TANK SUMPS SHALL BE ROBROY RIGID STEEL PVC COATED SCHEDULE 40 (NO SUBSTITUTIONS). CONDUIT MINIMUM BURY DEPTH IS 24" PER CODE. ALL JUNCTION BOXES SHALL FITTINGSM <br /> BE CLASS 1 DIV. 2 RATED. ALL ELECTRICAL CONDUIT IN SUMPS SHALL INCLUDE A SEAL-OFF ENTERING AND LEAVING. SEAL-OFFS SHALL BE INSTALLED 6" MIN. ABOVE HIGHEST PENETRATION IN SUMP. 2" X 3/4" BELL REDUCER •� Q 00 N o <br /> 8. - FILL & VAPOR RISER GROUNDING: 3/4" THREADED PLUG N <br /> 45 CONNECTOR 3/4" X 15" FLEXIBLE m c: Q <br /> ALL FILL AND VAPOR RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE. SEE DETAIL E ON SHEET E-4 FOR RISER GROUNDING DETAIL. rq <br /> 3/4" 3-WAY BALL VALVE g0 L0 <br /> 9. - STAINLESS STEEL FITTINGS: <br /> 67 NEW 3/4" "Y" STRAINER i Un 4S N L <br /> m O NN <br /> CONTRACTOR TO PROVIDE ALL MISCELLANEOUS NPT FITTINGS AND NIPPLES FOR CONNECTIONS TO TURBINES, SIPHON SYSTEM 2" X 3/4" S.S. DOUBLE m U � Y Lo <br /> o <br /> AND VAPOR RECOVERY SYSTEM. ALL STAINLESS STEEL FITTINGS SHALL BE MANUFACTURED BY "STANDARD PIPE PRODUCTS" TAP BUSHING 53 <br /> OR EQUAL SPECIFICATIONS AS FOLLOWS: <br /> DIMENSIONS MATERIAL THREAD PRESSURE RATING 2" NPT TANK BUNG <br /> S.S. FITTINGS FITTING w <br /> (TEES, ELBOWS) TANK TOP (TYP.) <br /> CD <br /> CLASS 150/PN 20 ASME B16.3 ASTM A- 182 ASME B. 1 20. 1 ASME B16.3 i <br /> S.S. UNIONS <br /> CLASS 150/PN 20 ASME B16.39 ASTM A- 182 ASME B. 1 20. 1 ASME B16.3 <br /> S.S. PIPE 3/4" S.S. PIPING STINGER TO WITHIN 6" 3/4" THREADED PLUG <br /> CLASS 150/PN 20 ASTM A733 ASTM A-312 ASME B. 1 20. 1 ASME B16.3 TO TANK BOTTOM (FIELD CUT TO LENGTH) Ln <br /> 0 <br /> 0 <br /> 10. - CORROSION PROOF: ( G' Gasoline Side Sum Section Detail For Additive Automation � Nco <br /> ALL TURBINE PUMP HEADS TO HAVE ADVANCED CORROSION PROOF PROTECTION WITH E-COATED FINISH. T5-2 SCALE: 1 " - 1 '-0" Z O N <br /> � r <br /> a� <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.