Laserfiche WebLink
r <br /> 1 . COMMUNITY DEVELOPMENT DEPARTMENT : (Staff Contact : Kerry <br /> Sullivan, 468-3140) <br /> a . BUILDING PERMIT: Submit an "Commercial Building <br /> Permit" application. The Site Plan required as a part <br /> of the building permit must be prepared by a registered <br /> civil engineer or licensed architect . This plan must <br /> show existing site features, topography, and any <br /> existing and proposed improvements . A fee is required <br /> for the Site Plan review. (Development Title Section <br /> 9-884) <br /> b. APPROVED USE : This approval is for a private <br /> recreational facility to include a dock and patio , as <br /> shown on the plan submitted October 6, 1997 . <br /> C. COMPLIANCE DATE : Because this development is currently <br /> updating without the required permits, the site plan <br /> shall be submitted within 60 days from the date of <br /> approval . Enforcement action will be deferred if the <br /> site plan is submitted within 60 days and the <br /> Conditions of Approval are met within six months from <br /> the date of approval . <br /> KS : ss <br /> UP9711DC <br /> c: San Joaquin Delta Power Squadron <br /> Dillon & Murphy <br />