Laserfiche WebLink
COMMENTS ON DEVELOPMENT <br /> SA-93-50 5th REVISION <br /> 10. A traffic study shall be conducted to determine if traffic <br /> signals are warranted at the intersection of Hansen Road and <br /> Schulte Road. The developer shall deposit funds with the <br /> County for all costs, as estimated by the Public Works <br /> Department Public Facilities Division, prior to Public Works <br /> Department preparing or contracting for the required study. <br /> (Development Title Section 9-1150. 4) <br /> 11. All improvements shall be in conformance with the Improvement <br /> Standards and Specifications of the County of San Joaquin. <br /> All improvement plans and specifications must be approved by <br /> the County of San Joaquin Department of Public Works prior to <br /> approval of the Improvement Plan. <br /> (Development Title Section 9-1150. 2) <br /> 12 . The Traffic Impact Mitigation Fee will be required. The fee <br /> is due and payable at the time of Improvement Plan approval. <br /> (The fee currently is $249 .99 per daily trip-end generated in <br /> the Tracy area. The fee shall be automatically adjusted July <br /> 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025) <br /> 13 . Proof of no increased demand upon the water supply currently <br /> available at the project site shall be provided. <br /> (Resolution R-91-973 , San Joaquin County Ordinance No. 3736) <br /> 14 . Written Permission shall be obtained from the Southern Pacific <br /> Railroad Company to use the Hansen Road crossing by the <br /> public. <br /> 15. Written permission shall be obtained from the State of <br /> California, Department of Water Resources to use the Hansen <br /> Road approaches and bridge crossing by the public. <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 3 <br />