Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-04-28 <br /> Wall <br /> Site Approval Application No. PA-04-28 was approved by the San Joaquin County Community <br /> Development Department on April 14, 2004. The effective date of approval is April 24, 2004. This <br /> approval will expire on October 24, 2005, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Rick Griffin, (209)468-3154) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show outdoor pallet storage areas, pallet repair area, office, any <br /> other structures, drainage, driveway access details including gates, on-site parking, landscaping, <br /> signs, existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK LIST'for <br /> details). A fee is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a pallet repair facility to consist of a 1,749 square-foot office, <br /> a 3,000 square-foot covered pallet repair area, and outside storage of pallets as shown on the Site <br /> Plan dated January 16, 2004. (Use type: General Industrial-Intermediate) <br /> c. COMPLIANCE DATE: Because this development is currently operating without the required <br /> permits, the following time frame shall apply: <br /> (1) An Improvement plan shall be submitted within thirty(30) days from the date of approval. <br /> (2) The improvement plan and building permit shall be secured (issued)within sixty(60)days from <br /> the date of approval. <br /> (3) All Conditions of Approval shall be completed within 180 days from the issuance of the building <br /> permit. <br /> d. BUSINESS LICENSE: The applicant shall secure an approved Business License prior. to the <br /> initiation of the use. The Business License may be applied for concurrently with the building permit <br /> application. (Section 7-1000 of the County Ordinance Code) <br /> e. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development Title Section 9- <br /> 1135) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> Conditions of Approval - 1 - PA-04-28 <br />